Loading…
Loading…
Tender Value
₹13.9 L
EMD Value
₹27,859
Closing Date
27 Aug 2026, 5:30 pm4d left
EEVI, WRD, Bicholim
EEVI, WRD, Bicholim
Improvement and repairs to existing tali in the field bearing Sy.No. 20/17 at village Khadki in Valpoi Constituency V.P. Cotorem in Sattari Taluka.
2026_WRD_31209_1
No.WRD/WDVI/PB/F.30/TN e 21/2026-27/ 443 line 15 Dated 17 /08/2026
Open Tender
Civil Works - Water Works
Item Rate
60 days
Bicholim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹27,859
19 Aug 2026
19 Aug 2026
28 Aug 2026
19 Aug 2026
27 Aug 2026
19 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical/manual means in all type of strata comprising any of the materials such as soil, silt, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and all such other material either in full or in parts, as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiseling, wedging etc. but blasting prohibited in all condition such as dry, moist, saturated, submerged, foul conditions etc. including pumping or bailing out water/dewatering including setting out construction of shoring, strutting and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, providing barricading, danger lighting, guarding and back filling the excavated earth to the extent required and disposal of excavated soil/rock in specified areas with all leads and all lifts etc and as per specification and drawing and as directed by the Engineer in charge etc. all complete.
all kinds of soil | 185.5 | Cum | - | - |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 16.9 | Cum | - | - |
| 3 | Centering & Shuttering including strutting, propping etc & removal of formwork for :
Foundations, Footings, bases for columns and mass concrete | 480.3 | Sqm | - | - |
| 4 | Providing & laying cement concrete 1:2:4 (1cement: 2 coarse sand: 4 graded granitic orbasaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering &finishing in: All works upto plinth level | 122.2 | Cum | - | - |
| 5 | 12 mm Cement plaster 1:3 (1 cement : 3 fine Sand) | 275.6 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tendernotice_2.pdf
PDF • 0.93 MB
BOQ_31604.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].