| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 CrAccepted-Finance | ₹8.0 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹8.1 Cr+₹12.4 L (1.56%)Rejected-Finance | ₹8.1 Cr+₹12.4 L (1.56%) | L2 | Rejected-Finance L2 |
| 3 | L3₹8.2 Cr+₹21.5 L (2.70%)Rejected-Finance FLAT NO 5 IIND FLOOR SIGNATURE APARTMENT SECTOR 3A AVAS VIKAS COLONY BODLA AGRA | AGRA | AGRA | UTTAR PRADESH | ₹8.2 Cr+₹21.5 L (2.70%) | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹8.3 Cr
EMD Value
₹19.5 L
Closing Date
25 May 2026, 5:00 pmClosed
GM CIVIL
Main Administrative Building Sector-6 Noida
M/o Drain (Reconstruction of RCC Drain on Sector-51, 52, 71, 72 Underpass Xing (Sector-52 MMR Side), Noida
2026_NOIDA_1146656_1
15/GM/SM-WC-6/2026-27
Open Tender
Civil Works
Fixed-rate
270 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,260
NOIDA
₹19.5 L
9 Jun 2026
8 May 2026
26 May 2026
8 May 2026
25 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 1,308 | Cum | 779.75 | ₹10,19,913 |
| 2 | Earth work in excavation by mechnical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50 and lift upto 1.5 m; disposed earthl to be levelled and dressed : The Contractor has to dectect different utilities like sewer line, water supply line, electric cable, telephone cable , gas pipe line etc, using utility decteting machine before start of excavation and shall start excavation only after getting permission of E/I All kind of soil : | 617.5 | Cum | 136 | ₹83,980 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 370.5 | Cum | 5,746.88 | ₹21,29,219.04 |
| 4 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/ cum.Excess/less cement used as per design mix is payable/recoverable separately). All works upto plinth level | 3,745 | Cum | 7,912.32 | ₹2,96,31,638.4 |
| 5 | Centering and shuttering including strutting,propping etc. and removal of form work for :Foundations, footings, bases for columns | 456 | Sqm | 181.64 | ₹82,827.84 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 4,883 | Sqm | 335.55 | ₹16,38,490.65 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform | 2,320 | Sqm | 385.68 | ₹8,94,777.6 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level.Cold twisted bars. | 4,64,500 | Kg | 82.81 | ₹3,84,65,245 |
| 9 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 1,925.5 | Cum | 120.55 | ₹2,32,119.03 |
| 10 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 33,243 | Kg | 92.34 | ₹30,69,658.62 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Capability.xls
Additional Documents • 0.05 MB
BOQ_2144473.xls
BOQ • 0.86 MB
TD.pdf
Tender Documents • 5.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .