Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC | L1 | Accepted-AOC L1 Accepted | |
| 2 | L2₹6.7 L+₹84,769.83 (14.4%)Rejected-AOC THEVARUPARAMBIL OTHARA WEST P O THIRUVALLA | THIRUVALLA | PATHANAMTHITTA | KERALA | L2 | Rejected-AOC L1 Accepted | |
| 3 | L3₹6.8 L+₹93,908.20 (15.9%)Rejected-AOC | L3 | Rejected-AOC L1 Accepted |
Tender Value
₹6.2 L
EMD Value
₹15,606
Closing Date
14 Aug 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASSISTANT EXECUTIVE ENGINEER
Office Of the Assistant Executive Engineer PWD Roads Subdivision Thiruvalla
Providing and laying slurry seal for filling cracks in Thiruvalla Kumbazha road km 0/000 to 5/400
2020_PWD_375200_1
PWD/2020-2021/14754/TVLA
Open Tender
Civil Works - Roads
Item Rate
30 days
Thiruvalla
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,380
online
₹15,606
Yes
2 Dec 2020
6 Aug 2020
17 Aug 2020
6 Aug 2020
14 Aug 2020
6 Aug 2020
60 days
Amount
Pothole filling
5.12.a : Providing and applying low viscosity bitumen emulsion (SS) for sealing cracks less than 3 mm wide or incipient fretting or disintegration in an existing bituminous surfacing.<br> Fog Spray<br>Providing and applying low viscosity bitumen emulsion (SS) for sealing cracks less than 3 mm wide or incipient fretting or disintegration in an existing bituminous surfacing. Fog Spray
5.12.b : Providing and applying low viscosity bitumen emulsion (SS) for sealing cracks less than 3 mm wide or incipient fretting or disintegration in an existing bituminous surfacing. <br> Fog spray - BlindedProviding and applying low viscosity bitumen emulsion (SS) for sealing cracks less than 3 mm wide or incipient fretting or disintegration in an existing bituminous surfacing. Fog spray - Blinded
10.2 : Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
10.3 : Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactorMaintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
T.T.THOMASKUTTY
Tittin Thevarumuriyil
Bidder Name
T.T.THOMASKUTTY
Tittin Thevarumuriyil
saji p j
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_531655.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .