Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.5 LAdmitted-Fee/PreQual/Technical/Finance | -17.72% | ₹7.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.5 LAdmitted-Fee/PreQual/Technical/Finance | -17.67% | ₹7.5 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.5 LAdmitted-Fee/PreQual/Technical/Finance | -17.30% | ₹7.5 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.9 LAdmitted-Fee/PreQual/Technical/Finance SARJOMGUDU CHAIBASA WEST SINGHBHUM | CHAIBASA | WEST SINGHBHUM | JHARKHAND | -13.15% | ₹7.9 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.1 L
EMD Value
₹18,500
Closing Date
15 Jul 2026, 5:35 pmClosed
DISTRICT ENGINEER
ZILA PARISHAD CHAIBASA
CONSTRUCTION OF 4 x 3 RCC PULIYA IN GRAM KUIDA KE NARKAT CHATOMBA KHET AT JAIPUR PANCHAYAT IN HATGAMAHARIYA BLOCK
2026_ZPWSS_115945_1
ZP/CHAIBASA/04/2026-27 GR-09
Open Tender
Civil Works
Works
60 days
HATGAMHARIYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,250
Yes
₹18,500
Yes
17 Jul 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
15 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required a nd utilising the remaining earth locally for road work.
Ordinary Soil Mechanical Means. | 1 | Cum | 55.8 | ₹55.74 |
| 2 | Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 2506 | 11.18 | Cum | 2,358.35 | ₹26,366.35 |
| 3 | Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications
(P.C.C. Grade M-15) A Class -II | 14.28 | Cum | 0.9 | ₹12.85 |
| 4 | Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications..
Square Rubble Coursed Rubble Masonry (first sort) in C.M. (1:3) in foundation. A | 45.24 | Cum | 4,752.72 | ₹2,15,013.05 |
| 5 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications.
Coursed rubble masonry in C.M. (1:3) in (first sort ) sub-structure. B | 45.35 | Cum | 4,897.28 | ₹2,22,091.65 |
| 6 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications
(P.C.C. Grade M-15). A(p) | 0.78 | Cum | 4,854.96 | ₹3,786.87 |
| 7 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications
(P.C.C. Grade M-20). B(p) | 4.35 | Cum | 5,321.74 | ₹23,149.57 |
| 8 | Furnishing and Placing Reinforced/ Prestressed cement concrete in sub-structure as per drawing and Technical Specification
(R.C.C. Grade M-25 in Deck Slab). F(p) | 8.1 | Cum | 5,813.77 | ₹47,091.54 |
| 9 | Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specifications | 2.03 | Cum | 12,122.7 | ₹24,609.08 |
| 10 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications | 1.07 | Sqm | 88,555.82 | ₹94,754.73 |
stage.html
html • 0.02 MB
finance_156767.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_156767.xls
BOQ • 0.33 MB
SBD.pdf
Tender Documents • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].