Loading…
Loading…
Tender ID
Tender Value
₹13.6 L
EMD Value
₹13,700
Closing Date
9 Mar 2026, 5:30 pmClosed
Executive Engineer, Electric (R&B) Division, Rajkot
Providing and Erecting 8 Passenger Capacity Lift in Collector Bungalow at Rajkot.
282276
16 of 2025-26
Open
Electrical Works
Works
Rajkot
11 documents required · 11 mandatory
₹900
Yes
Executive Engineer, Electric (R&B) Division, Rajkot.
₹13,700
Yes
2 Mar 2026
2 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
Providing and Erecting 8 Passanger Capacity Lift in Collector Bunglow at Rajkot.
Ite Quantities Item of work Tendered Rate Total amount
Ite Quantities Item of work Tendered Rate Total amount
m estimated but may according to
No. Qty. Unit estiamted
Supplying, Erecting, Testing & Commissioning the passenger /
stretcher lift having following main features:(a) General Features
& Special Features of the all lift items shall be taken as below.(b)
for Handicap Lifts, Minimum 10 Passengers Lift Capacity shall
be considered.same is to be informed to architect /civil authority
to keep necessary size of lift well.(c) The lifts of 15/ 16 and
above passenger capacity shall be taken for Hospital Lifts; Where
in Description “ Stretcher Lifts” shall be mentioned.(d) The
1 Rates of the following items are for the lift of Machine room less.
For Machine room Lifts, rate for Rs. 1,50,000/- shall be deducted
in Total Cost for the Lifts from 4 to 13 Passenger Lift. Rs.
2,00,000/- shall be deducted in Total Cost for the Lifts 15 and
above passenger capacity as extra cost.(e) Add Rs. 80,000/- for
the DUPLEX control for the lifts up to 10 floors and add Rs.
10,000/- for additional each floor above 10 floors.(A) GENERAL
DESCRIPTION OF LIFTS.
[1] GEAR LESS LIFT DRIVE (MRL) comprising of High
Starting torque Lift 3 phase 440 V A. C. Permanent Magnet
Synchronous motor of proper rating with high efficiency shall be
used.[2] Micro processor based / PLC, ACVVVF, vector control
drive with encoder feedback closed loop system shall be used for
lift car and door operation which shall be full collective selective
operation hall call demand response, UP/DOWN hall stops, Main,
Up/ Down Contactor with overload and phase reversal relay and
safety controls.[3] Car with M S platform with bracings of
adequate size and to sustain the impact load cabin + passenger
with safety factor of fire for steel and side panels of Stainless
steel of sheet of grade 304 duty. Car ceiling will be S.S. finishes
with aesthetic appearance with LED ceiling lights. Car flooring
shall be of s/s 304 chaker plate design sugeested of engineer in
charge. of engineer in charge. Car doors shall be of stainless steel
grade 304, hairline finish with centre opening / telescopic
automatic doors. Car panel will also be S.S. 304 finished with
emergency stop device, mechanical door safety device, facility of
auto/ attended mode. All car panel buttons and all floor switches
must be with brail language as per lift act.
[4] All landing doors must be fire rated for 2 hour shall be fully
automatic centre opening/ telescopic opening made of hairline
finish steel grade of 304 with key holes and infrared curtains with
Unlocking facility from outside
[5] Appropriate battery operated emergency light in the car along
with alarm switch shall be provided. Also, Emergency Light &
Fan should start immediately without any Time Delay as soon as
[6] Digital scrolling indicator system for up-down arrow along
with floor position indicator shall be provided inside the car and
[7] Full height infra red curtain with multiple cross / crossing
light beams shall be provided.
[8] Automatic Rescue Device (ARD) shall be provided
accordingly of passenger capacity with Manual Rescue Operation
( Manual Cranking Facility).
[9] Audio visual indication in the lift car showing over loading
shall be provided such that doors kept open till excess load is
[10] Spring buffers/PU Buffers shall be provided.
[11] Car fan as per passenger capacity with automatic sleep timer
shall be provided.
[12] Voice annunciator with suitable music shall be provided in
[13] Self diagnostics system for operational and safety parameters
shall be provided in control panel.
[14] Mechanical over speed governor with governor calibration as
per actual site parameters and submission of calibration
certificate submission, door key holes in the floor doors, fireman
switch shall be provided.
[15] Lift machine hoisting arrangement in the lift machine room
and monkey ladder for lift pit should be provided by the lift
agency, along with the other steel structure works, foundations for
the machine etc…
[16] In the hoist way fascia plate shall be provided without any
extra cost, where ever required as / if directed by engineer in
[17] Permanent wiring with necessary safety devices like RCCB
in all circuit, Over Voltage Under Voltage protection and THD
eliminator in circuit for lift machine room and lift well with
proper numbers of light points, with fixtures, exhaust fan and
plug points shall be provided by the agency. Only 3 phase Power
Supply shall be made available by department in lift machine
room. Necessary Earthing as per Lift Act/Rules shall be arranged
by Lift Agency.
[18] Any civil/ electrical works for additional and alteration in lift
shaft and machine room related to erection of lift shall be made
by lift agency without any extra cost. (granite/marble fixing
around all landing door openings are not in lift agency’s scope.)
[19] Agency has to provide all working drawings and documents
and liaison services for obtaining all necessary permission from
lift inspector and other authorities.
[20] acrylic transparent licence/display A4 size holder in lift
car[20A] As per statutory requirement of Govt. Of Gujarat lift &
escalator act 2000, lift agency has to provide
1. Car top safety barricade
2. Push & talk communication system.
3. Fireman's switch operation at Ground Floor.
4.carrying out third party lift inspection during/after lift erection
and provide report by third party authorized by concern
licensing authority 5.agency has to provide third party insurance
upto completion of free maintenance period and submit the
document for the same.[21] Car Panel Operating Buttons with
floor position indicator/buttons must be of Auto Glow type clearly
visible when view from inside cabin.
[22] For Physically Handicapped person Full Length Handrails of
hairline finish steel grade of 304 should be provided at
appropriate height on the Rear & Side Wall Panels in Lift Car.
[23] With Necessary KVA rating voltage controlled Stabilizer
suitable for your controller, drive and all equipments of lift.
[24] Necessary rating of DP Elcb and FP Elcb required for lift is
in scope of work which rating is sugested by CEICED
Department (electrical Inspector) (B) SPECIAL FEATURES
DESCRIPTION OF LIFTS for PREMIUM category
Advanced control system dual 64 bit embedded microprocessor
with CANBUS Serial Communication mode including
Regenerative power efficient operation,on site programming
facility, Anti nuisance, Pte-opening, BMS/RMS with necessary
online real time monitoring system having necessary connectivity
for remote monitoring & other suitable supporting hardware &
software devices to fulfil the purpose.
2. Floor Indication LCD Display with call registration & brail
mark with arrival gong and hall lantern & TFT Screen in the car
with MP3 Voice Announcer. 3. CAR Panel should be Scratch
resistive SS Moonrock finish / Hair Line / Honeycomb for car
and all Doors, All landing doors must have fire rating up to
hours and car door must have multi-level crisscross beam door
1.00 Ea protection.4. To & fro communication system & wiring (i.e. car , 1361332.54
control room & guard room ) and Each elevator are equipped with
remote monitoring system.agency has to provide mobile app and
user id and password for monitoring 8 / 10 Passengers, Ground
plus 1 upper floor with Rated Speed of 1.0 m/sec., (C) With
General PLUS ADDITIONAL SPECIAL FEATURES attached
herewith. Prem. Cat.
Not The Credit of dismentalled materials for Rs.00.00 shall be recovered from the First R.A. bill payable to the contrator
e:- and there after the dismentalled materials shall be the property of the contractor.
I/We am/are willing to carry out the work at__________________% above/below (in
figures)_____________________________________percent Above / below (in words) the estimated rates mentioned above
amount of my\our tender works out as under :-
Estimated amount put to Tender Rs. _________
Deduct________% below Rs. _________
Net Amount Rs. _________
Estimated amount put to Tender Rs. _________
Net Amount Rs. _________
A I/We hereby declare that I/we have visited the site and fully acquainted my self / our selves with the local
situation regarding material,labour and other factors pertaining to the work before submitting this tender.
B I/We hereby declare that I/we carefully studied the conditions of contract, detailed technical specifications
and other tender documents of this work and agree to execute the same accordingly.
C Any Excess in Tender Item/Extra Item if Needs to be Execute. Contractors has to carry out work on the
instruction of Competant Authority on Tender Submitted rate,No Excuse will be Accepted.Hence Contractor
are Requested to quote the rate considering this condition.
D Contractor are requested to quote the Tender by considering that payment will be made after availibility of
grant.Contractor has to start the work immediately after issue of Work Order and as per instruction of
Engineer-in-Charge irrespective of availibility of grant.
E "This estimate has been prepared on the new SOR wich is exclusive of GST hence GST additional will be
paid to the agency as per existing guidelines."
F contractor Shall have to obtain necessary clearance from the lift inspector and Fire Brigade Authorities before
and after the complete installation.
G It will be responsibility of the Contractor to get the installation inspected and passed by the Government
Inspector for Lifts. Any modification as suggested by Inspector for Lifts shall be attended by him at no extra
costs the owner.
H Contractor has to carry out process regarding licenses and permits, inspections, tests, etc. required by
governing codes to operate the elevator systems and called for in these specifications.
I Contractor has to carry out the Work as per the Instruction From Honrable Collector Sir - Rajkot.
(Signature of the Contractor) Deputy Executive Engineer
Electrical R&B Sub Division
Executive Engineer
Electrical R&B Division
Note 1 Please strike out whichever is not applicable.
2 In the case of tendered amount being quoted incorrectly the quoted pered percentage Below/Above will be
considered as final.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
ONLINE_NOTICE(R-2)(dn).pdf
pre qualification critaria.pdf
sch B.pdf
2.Genral Specification.pdf
15 year lift amc GR.pdf
SBD.docx
DOCX
Contractor_Registration_Paripatra__1_.pdf
EMD GR.pdf
GR for Extra Item.pdf
GR for single Tender.pdf
[3-c]_Special Condition for G.S.T. GR Dt. 25.9.18.doc
DOC
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .