| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹11.4 L+₹46,438.42 (4.24%)Rejected-AOC | L2 | Rejected-AOC Accepted | |
| 3 | L3₹11.4 L+₹47,943.56 (4.38%)Rejected-AOC | L3 | Rejected-AOC Accepted | |
| 4 | L4₹11.5 L+₹54,738.27 (5.00%)Rejected-AOC | L4 | Rejected-AOC Accepted | |
| 5 | L5₹11.6 L+₹68,289.98 (6.24%)Rejected-AOC | L5 | Rejected-AOC Accepted |
Tender Value
₹13.6 L
EMD Value
₹20,400
Closing Date
10 Sept 2021, 5:00 pmClosed
Executive Engineer
Irrigation Division, Malampuzha
Clearing grass dismantling DR Dept stone earth work CC1 4 8 centering and shuttering CC1 3 6 steel reinforcement CC 1 1 5 3 Plastering earth filling
2021_Irrig_437129_1
36/ET/EE/MP/2021-22
Open Tender
Repair and Maintenance Works
Item Rate
180 days
Pothundy
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,260
₹20,400
Yes
18 Oct 2021
1 Sept 2021
17 Sept 2021
2 Sept 2021
10 Sept 2021
2 Sept 2021
2 Sept 2021 - 6 Sept 2021
Amount
Detailed estimate
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
60.7.3 : DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.7.8 : DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
50.2.26.1 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
G.RAMACHANDRAN
SHAJI.Y
RAJALEKSHMY B.
M KAJHA HUSSAIN
AHAMMED SUNAIF C M
AJMAL A
SURESH K
Bidder Name
G.RAMACHANDRAN
AJMAL A
SURESH K
M KAJHA HUSSAIN
M A ABDULLAKUTTY
SHAJI.Y
RAJALEKSHMY B.
AHAMMED SUNAIF C M
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_621313.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .