Loading…
Loading…
Tender Value
₹88.6 L
EMD Value
₹88,568
Closing Date
6 Oct 2026, 3:15 pm
GUNTUR MUNICIPAL CORPORATION
GUNTUR
Avenue Plantation and Shrub Plantation on both sides of Narasaraopet from chuttugunta center to vengalayapalem canal (part-2) for a length of 3.10 Km along with Plantation Development in the Central Divider, including maintenance for a period of two (02) years
990494
ET NO.45/2026-27 ITEM NO-05
OPEN - NCB
Similar Work
GUNTUR, ANDHRA PRADESH
1 document required · 1 mandatory
₹3,136
₹88,568
22 Sept 2026
22 Sept 2026
22 Sept 2026
Digging of 0.6x0.6x0.6 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., and it including all operational, incidental, labour charges, required tools, overheads & contractors profit complete for finished item of work. (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt))
Hedge/shrub planting: Digging the trench of size 0.3 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc., (@20 gms/pit/sqmt) and it including all operational, incidental, labour charges, required tools, overheads & contractors profit complete for finished item of work, but excluding the cost of the fertilizers (@20 gms/pit/sqmt) and plant material etc., unit 1 Sqmt of work. ( 10 No./Sqm of sper data plants & bag size shall be arrived based on the spacing 0.3 c/c as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)
Cutting road B.T. road surface (as well as asphalt concrete up to 75 mm thick) including water bound macadam including stacking of excavated materials for pipe line trench work and complete as directed by the Departmental Authorities of the work, and it including all operational, incidentallabour charges, required tools, overheads & contractors profit complete for finished item of work
Carting away of excavated earth / debris to a lead of 1 KM. complete as directed by the Departmental Authorities of the work, and it including all operational, incidental, labour charges, required tools, overheads & contractors profit complete for finished item of work
Watering by pipe, weeding and soil working 1 Mt Dai around the plant, fertilizer application, pesticide application and watch and ward. and it including, labour charges, required tools, overheads & contractors profit complete for finished item of work.,( 24 Months Miantenance for shrub plantation)
Pruning, trimming, shaping of trees /shrubs (ht 15 feet and above) i/c removal of cut materials upto 50mt. lead and as per direction of officer in charge (necessary T&P shall be arranged by the contractor) and it including, labour charges, required tools, overheads & contractors profit complete for finished item of work( 24 Months Miantenance for shrub plantation)
Maintenance of hedge/shrub planting: Trimming of hedges/shrubs (once in 30 days) it including all operational, incidental, labour charges for complete of work,( 24 Months Miantenance for shrub plantation)
Maintenance of hedge/shrub planting : watering once in a 3 days @ 5 Lts/per sqmt shall be provide to maintain sub soil moisture continuously by manually (Watering by pipe) excluding cost of wateri ncluding all operational, incidental , labour charges for complete of work.( 24 Months Miantenance for shrub plantation)
Maintenance of hedge/shrub planting : watering once in a 3 days @ 5 Lts/per sqmt shall be provide to maintain sub soil moisture continuously by manually (Watering by pipe) excluding cost of wateri ncluding all operational, incidental , labour charges for complete of work.( 24 Months Miantenance for shrub plantation)
Hiring of the latest model 4 KL capacity vehicle-mounted water tankers with driver, helper, lubricants, fuel, and all vehicle-related charges for supplying water to unserved areas in Division Nos. 25, 28, 29, 30, and 31 under AE-3 Section (West) Constituency. The approved rate is ₹215.00 per trip as per TS No. 94/EE/GMC/2023-24, dated 12-06-2023. 240 waterings for 2 year ie. once in a three days @ 5 litres/per plant per each time (300No.s x240 x 5/4000) = 90 trips 240 waterings for 2 year ie. once in a three days @ 5 litres/per sqm per each time (500 sqm x240 x 5/4000) = 150 trips
Supply, deliveryand and fixing of HDPE Tree Guards confirming to ISI standards with following Technical specifications 1. The tree guard should be made of Virgin HDPE 2. Width – 1200 mm 3. Height – 1800 mm 4. Diameter – 375 mm 5. Horizontal regular filament average thickness should not be less than 4 mm. 6. Vertical regular filament average thickness should not be less than 4 mm. 7. All joints average thicknesses should not be less than 6 mm 8. Regular mesh gap should not be more than 45mm x 55mm.. 9. Longitudinal additional extra thick filament (two bars) shall be placed at 4 places along the height of 1800mm with a filament average thickness should not be less than 5 mm. 10. Circumference additional extra thick filament (two bars) shall be placed at 5 places along the width of 1200mm with a filament average thickness should not be less than 5 mm. 11. Weight of the sheet (1200mmX1800mm) should not be less than 1.50 kgs excluding display board and cable ties. 12. Melt Flow Index (MFI) should be as per Raw Material data sheet submitted by the contractor. (+ 20% allowable) 13. Supply of 18 Nos cable ties (100 mm length). 14. Color – Dark blue or Green variants 15. Suitable for outdoor use (Must be tested for presence of UV resistance material) 16. Display board of size 300mm x 150mm of plastic glow sheet blend of HDPP / tin plate/ACP with a suitable hole at each corner for tie up. The rates inclusive of loading, transportation to the site, unloading. complete for finished item of work.
Supply of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as per directions of officer in charge at site including cost of plants plants of bag size 7" x 8" of plant height not less than 1.0 feet, 8" x 10" of plant height not less than 3.0 feet, 13" x 13" of Tree/Palm height not less than 5 feet, 13" x 13" of plant (Hedges & Shrub) height not less than 2 feet, 15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet, 18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is 0.75'' and above, 21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the stem is 1'' and above. Heights mentioned above are excluding bag height. All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off. the rates inclusive of cost of plants and complete for finished item of work.
Euphorbia milii 7" x 8"
Pedilanthus variegated 7" x 8"
Erythrina indica 21 " x 21"
Loading and unloading of plants bag size (21"X21") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag) plants bag size (21"X21")
Loading and unloading of plants bag size (7"X8") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag) plants bag size (7"X8")
Transportation of bag plants from kadiyam to Lalpuram .( Actual payment will paid for the actual work done subjected to approval of the weight by the competent authority )
Seignorages @ 1 %
Add 2 % on Administrative Charges for preparation of designs and detailed estimates
Add 1 % on estimated cost for Supervision of works
Unforeseen item
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Document F.doc
TENDER_DOCUMENT • 0.46 MB
470753.xlsx
TENDER_DOCUMENT • 0.02 MB
NIT.doc
TENDER_DOCUMENT • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .