| 1 | L1₹2.9 LAccepted-AOC | L1 | Accepted-AOC Selected Contractor Kuttanpillai K | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 |
Tender Value
₹2.9 L
EMD Value
₹7,245
Closing Date
4 Nov 2023, 5:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, MI Subdivision, Chengannur
Painting, rewinding of pump, conveyance and re-conveyance etc.
2023_Irrig_617814_1
IRR/KP/TR/3885/2023_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
240 days
Thazhakkara
Please refer Tender documents.
9 documents required · 9 mandatory
₹640
Yes
₹7,245
Yes
1 Dec 2023
31 Oct 2023
8 Nov 2023
31 Oct 2023
4 Nov 2023
31 Oct 2023
Amount
Annual maintenance
OD8081/2023-2024:Charges for the dismantling the pump cleaning inside greasing , bearing , overhauling , assembling painting etc.
OD8084/2023-2024::Dismantling the 15 HP motor at the work shop for rectification such as removing the rotor ,damaged bearings, and varnishing the winding etc with great care and re assembling after rectification as per the direction of the officer
OD8083/2023-2024:"Conveyance of pump,motor , starter, main switch etc.from LI station / store, to work shop including loading,unloading,placing in position and lorry conveyance etc complete." and re conveyance after repair/rectification conveyance 0.5 day+ man 0.5+0.5 re conveyance 0.5 day+ man 0.5+0.5
OD8082/2023-2024::Man for cleaning , silt clearing suction pit, silt and debris deposited in & around pump house, in the suction pit ,other emergency works etc.
OD8085/2023-2024:Supplying rubber packing sheet for joining the pump with suction pipe
OD8086/2023-2024:Supply and providing bearing grease
OD8087/2023-2024::Supply and providing gland packing
OD8088/2023-2024:Supply and provide starter oil
OD8089/2023-2024:Supplying Insulation tape
OD8091/2023-2024:Supplying and installation of bulb
OD8092/2023-2024:Supplying and fixing new pulley and accessories including lathe work for making the pulley suit to axle , etc complete
OD8093/2023-2024:Supplying cotton waste
OD8094/2023-2024:Supplying iron nut and bolt
OD8095/2023-2024:Dismantling and overhauling 8'' foot valve including replacing the flap etc. complete
OD8096/2023-2024:Charges for fitting the pump with motor to checking the alignment setting on bed and trial running, including power supply connections and pipe connections etc. complete
OD8097/2023-2024:Conveyance of pump, motor and its accessories from murinjapuzha store to LI station including loading, unloading, placing in position and lorry conveyance etc complete. conveyance 0.5 day+ man 0.5+0.5 re conveyance 0.5 day+ man 0.5+0.5
OD8098/2023-2024:Re-Conveyance of pump, motor and its accessories from LI station to murinjapuzha store including loading, unloading, placing in position and lorry conveyance etc complete. conveyance 0.5 day+ man 0.5+0.5 re conveyance 0.5 day+ man 0.5+0.5
OD8100/2023-2024::Supplying 200 A electric cutout fuse
OD8102/2023-2024:Supplying and fixing 100Amp main switch
Side Protection Work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
OD23070/2023-2024:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
OD23072/2023-2024:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD23073/2023-2024:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. including through and bond stone complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
K J SIMON
Bidder Name
Kuttanpillai
K J SIMON
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_926868.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .