| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-Finance | L1 | Accepted-Finance FIRST LOWEST | |
| 2 | L2₹16.0 L+₹61,069.01 (3.98%)Accepted-Finance 01 SORANA NAKUR SAHARANPUR UTTAR PRADESH 247232 | SAHARANPUR | UTTAR PRADESH | 247232 | L2 | Accepted-Finance SECOND LOWEST | |
| 3 | L3₹20.0 L+₹4.6 L (30.0%)Accepted-Finance SMVDU | L3 | Accepted-Finance THIRD LOWEST |
Tender Value
₹19.9 L
EMD Value
₹39,900
Closing Date
10 May 2022, 6:00 pmClosed
Project Officer
Project Officer CAD Samba HQ Jammu
Construction of Field Channel at Jamwal Hartiyan Khul and Neeli Nallah Bowli Village Hartiyan and Neeli Nallah Pyt Hartiyan and Neeli Nallah Block Udhampur
2022_APD_168248_10
e-NIT No. 05 of 2022-23
Open Tender
Civil Works
Item Rate
90 days
supwal
as per NIT
2 documents required · 2 mandatory
₹600
Project Officer CAD Samba HQ Jammu
₹39,900
Project Officer CAD Samba HQ Jammu
12 May 2022
2 May 2022
11 May 2022
3 May 2022
10 May 2022
3 May 2022
9 May 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Dumping stone including cost of stones. Stone Boulder 225 MM
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20 mm nominal size stone aggregate.
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Carriage of Material by Mechnical Ttransport a) Cement from 15 Km
Carriage of Material by Mechnical Ttransport b) Sand and Bajri from 40 Km
Carriage of Material by Mechnical Ttransport c) Stone from 40 Km
Carriage of Material by Head Load a) Cement from 200 Mtr.
Carriage of Material by Head Load b) Sand and Bajri from 250 Mtr.
Carriage of Material by Head Load c) Stone from 200 Mtr.
M/s SINGH CONSTRUCTION CO
Rajeev Kumar
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .