Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹12.2 L+₹18,617.82 (1.55%)Admitted-Fee/PreQual/Technical/Finance EDAVANNUR P O KANNUR | KANNUR | KANNUR | KERALA | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹12.4 L+₹39,716.81 (3.31%)Admitted-Fee/PreQual/Technical/Finance ROADARIKATHU VEEDU ALAMUKKU | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹12.4 L+₹39,718.17 (3.31%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹13.0 L+₹1.0 L (8.42%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | KS JOSEPH L5 | VIJESH. K L2 | BABU P L3 | Benny. K.A L1 | Mathew P M L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Gabion Side Protection Wall 2 M Height | ||||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 137.25 | cum | 250 ₹34,312.5 | 236.36 ₹32,440.41 | 240.15 ₹32,960.59 | 232.47 ₹31,906.51 Lowest | 240.45 ₹33,001.76 |
| 1.00 | 16.95:Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinic+PVC coated, Mesh wire diameter2.7/3.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge. | 167.75 | cum | 4,700 ₹7,88,425 | 4,437.77 ₹7,44,435.92 | 4,514.52 ₹7,57,310.73 | 4,370.06 ₹7,33,077.57 Lowest | 4,514.52 ₹7,57,310.73 |
| 2.00Gabion side protection wall 1.5m hight | ||||||||
| 2.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 62.5 | cum | 250 ₹15,625 | 236.37 ₹14,773.13 | 240.15 ₹15,009.38 | 232.47 ₹14,529.38 Lowest | 240.45 ₹15,028.13 |
| 2.00 | 16.95:Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinic+PVC coated, Mesh wire diameter2.7/3.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge. | 87.5 | cum | 4,700 ₹4,11,250 | 4,437.77 ₹3,88,304.88 | 4,514.52 ₹3,95,020.5 | 4,370.05 ₹3,82,379.38 Lowest | 4,514.52 ₹3,95,020.5 |
| 3.00Coir geo textile | ||||||||
| 3.00 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 183 | sqm | 50 ₹9,150 | 32.38 ₹5,925.54 | 32.94 ₹6,028.02 | 31.89 ₹5,835.87 Lowest | 32.94 ₹6,028.02 |
| 3.00 | OD144/2026-2027:Coir geo textiles with grass/ vegetation on levelled earth surface including all cost of materials,
labour charges etc complete. | 183 | 1 sqm | 240 ₹43,920 | 186.94 ₹34,210.02 | 190.49 ₹34,859.67 | 184.39 ₹33,743.37 Lowest | 190.17 ₹34,801.11 |
Tender Value
₹12.4 L
EMD Value
₹31,030
Closing Date
22 Sept 2026, 11:00 amClosed
DISTRICT SOIL CONSERVATION OFFICER
DISTRICT SOIL CONSERVATION OFFICE , CIVIL STATION, B BLOCK , KANNUR
Construction of gabion retaining wall for 111 metre and laying of coirgeotextile in the drain bank around 200 sq m at immatikkal thodu
2026_DSSC_866794_1
DSCO/KNR/LSS/2026-K2-2
Open Tender
Civil Works - Others
Item Rate
210 days
Ayyankunnu
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,760
Yes
₹31,030
Yes
24 Sept 2026
1 Sept 2026
23 Sept 2026
1 Sept 2026
22 Sept 2026
1 Sept 2026
1 Sept 2026 - 21 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Gabion Side Protection Wall 2 M Height | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.002 | 16.95:Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinic+PVC coated, Mesh wire diameter2.7/3.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge. | - | cum | - | - |
| 2Gabion side protection wall 1.5m hight | |||||
| 2.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 2.002 | 16.95:Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinic+PVC coated, Mesh wire diameter2.7/3.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge. | - | cum | - | - |
| 3Coir geo textile | |||||
| 3.001 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | - | sqm | - | - |
| 3.002 | OD144/2026-2027:Coir geo textiles with grass/ vegetation on levelled earth surface including all cost of materials,
labour charges etc complete. | - | 1 sqm | - | - |
stage.html
html • 0.02 MB
finance_1467323.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1467323.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.73 MB
contractdata.pdf
Tender Documents • 0.01 MB
tenderforms.pdf
Tender Documents • 0.04 MB
drawings.pdf
Other Document • 1.48 MB
corrigendumextension.pdf
PDF • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .