Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC ATHIRA MA THRIKKAKARA MUNICIPALITY KAKKANAD | THRISSUR | KERALA | 680667 | ₹14.2 L | L1 | Accepted-AOC Agreement executed vide agreement no.357/25-26 |
| 2 | L2₹14.6 LRejected-Finance | ₹14.6 L | L2 | Rejected-Finance Agreement executed by L1,hence L2 is rejected |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-E-PAYMENT FORM IS NOT VALID |
| 4 | Rejected-Technical VALIYA VEED THRIKKAKARA P O LSGD THRIKKAKARA MUNICIPALITY KAKKANAD | THRISSUR | KERALA | 680667 | - | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | HASHIM P A L2 | PRABHUKUMAR CONSTRUCTIONS L1 | POTHUMARAMATH NIRMANA THOZHILALI CO OPERATIVE SOCIETY LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00building | ||||||
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.69 | cum | 11,000 ₹95,568 | 10,728.63 ₹93,210.34 | 12,200 ₹1.1 L |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 25.17 | cum | 11,600 ₹2.9 L | 11,291.4 ₹2.8 L | 13,000 ₹3.3 L |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 134.75 | sqm | 820 ₹1.1 L | 807.44 ₹1.1 L | 750 ₹1.0 L |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 54.75 | sqm | 659 ₹36,081.57 | 640.82 ₹35,086.18 | 500 ₹27,376 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 67.2 | sqm | 870 ₹58,464 | 847.18 ₹56,930.50 | 800 ₹53,760 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,779.73 | kilogram | 95 ₹1.7 L | 94.44 ₹1.7 L | 100 ₹1.8 L |
| 1.01 | 50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 39.77 | cum | 6,280 ₹2.5 L | 6,114.39 ₹2.4 L | 7,000 ₹2.8 L |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 529.72 | sqm | 320 ₹1.7 L | 310.6 ₹1.6 L | 300 ₹1.6 L |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 13.92 | sqm | 270 ₹3,758.40 | 266.54 ₹3,710.24 | 250 ₹3,480 |
Tender Value
₹16.9 L
EMD Value
₹42,316
Closing Date
28 Oct 2025, 6:00 pmClosed
THE ASSISTANT EXECUTIVE ENGINEER
O/o THE ASSISTANT EXECUTIVE ENGINEER,THRIKKAKARA MUNICIPALITY
PROJ.NO- 60/2025-26 WARD 14 -Construction of Public Library Renovation of Municipal Ground in ward- 14 thrikkakara municipality
2025_LSGD_808718_24
LIDEW/AEE/ET/35/2025
Open Tender
Civil Works - Others
180 days
THRIKKAKARA
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
₹42,316
Yes
27 Jan 2026
23 Oct 2025
30 Oct 2025
23 Oct 2025
28 Oct 2025
23 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1359812.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.18 MB
Tendernotice_3.pdf
PDF • 0.10 MB
Tendernotice_4.pdf
PDF • 0.18 MB
Tendernotice_5.pdf
PDF • 0.30 MB
viewsbd.pdf
Tender Documents • 1.77 MB
BOQ_1359812.xls
BOQ • 0.32 MB
viewnit.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid