Tender Value
Refer Docs
EMD Value
₹27,000
Closing Date
30 May 2022, 3:00 pmClosed
Executive Engineer,EDD,Ranikhet
Office of the Executive Engineer,EDD,Ranikhet
Construction of line and substation for GSC under EDSD,Dwarahat udner head UERC
2022_UPCL9_44049_1
06/2022-23 EDD(R)
Open Tender
Electrical Works
Item Wise
365 days
Dwarahat
As per tender document
2 documents required · 2 mandatory
₹590
Executive Engineer,EDD,Ranikhet
₹27,000
27 Sept 2023
7 May 2022
31 May 2022
12 May 2022
30 May 2022
12 May 2022
Amount
Forwarded and Back Cartage of material by road transport from Haldwani/Almora/Masi Store Centre to Dump Store Including Loading-Unloading (Average distance 80 Km.)
Forward and Back Head Load Cartage of Poles Sp-10 From Road To Site 0 To 1 Km
Forward and Back Head Load Cartage of Poles Sp-21/Sp-23From Road To Site 0 To 1 Km
Forwarded and Back Head Load Cartage of Poles Sp-10 From Road To Site 1 To 3 Km
Forwarded and Back Head Load Cartage of Poles Sp-21/Sp-23From Road To Site 1 To 3 Km
Forwarded and Back Head Load Cartage of Small Materials Including Loading and Unloading 0 To 1 Km
Forwarded and Back Head Load Cartage of Small Materials Including Loading and Unloading 1 To 3 Km
Forwarded and Back Head Load Cartage of 25 kva T/F Including Loading and Unloading on Both Points 0 To 1 Km
Forwarded and Back Head Load Cartage of 63 kva T/F Including Loading and Unloading on Both Points 0 To 1 Km
Forwarded and Back Head Load Cartage of 100 kva T/F Including Loading and Unloading on Both Points 0 To 1 Km
Forwarded and Back Head Load Cartage of 25 kva T/F Including Loading and Unloading on Both Points 1 To 3 Km
Forwarded and Back Head Load Cartage of 63 kva T/F Including Loading and Unloading on Both Points 1 To 3 Km
Forwarded and Back Head Load Cartage of 100 kva T/F Including Loading and Unloading on Both Points 1 To 3 Km
Excavation of Foundation Pit for erection of SP-10 Single Pole Support in all type of soil and fixing all accessaries of pole and erection of support and grouting of pole in CC 1:4:8 block including cost of Ballast, Sand and Cement Back Filling of soil and Boulders in pit and proper alignment leveling as per RESPO Construuction Manual.
Excavation of Foundation Pit for erection of SP-21Single Pole Support in all type of soil and fixing all accessaries of pole and erection of support and grouting of pole in CC 1:4:8 block including cost of Ballast, Sand and Cement Back Filling of soil and Boulders in pit and proper alignment leveling as per RESPO Construuction Manual.
Excavation of Foundation Pit for erection of SP-23 Single Pole Support in all type of soil and fixing all accessaries of pole and erection of support and grouting of pole in CC 1:4:8 block including cost of Ballast, Sand and Cement Back Filling of soil and Boulders in pit and proper alignment leveling as per RESPO Construuction Manual.
Excavation of Foundation Pit for erection of SP-23 Double Pole Support in all type of soil and fixing all accessaries of pole and erection of support and grouting of pole in CC 1:4:8 block including cost of Ballast, Sand and Cement Back Filling of soil and Boulders in pit and proper alignment leveling as per RESPO Construuction Manual.
Excavation of Foundation Pit for erection of SP-23 Four Pole Support in all type of soil and fixing all accessaries of pole and erection of support and grouting of pole in CC 1:4:8 block including cost of Ballast, Sand and Cement Back Filling of soil and Boulders in pit and proper alignment leveling as per RESPO Construuction Manual.
Muffing of poles with cc 1:3:6 Block and 45 cm in Above Ground Level including cost of Ballast, Sand and cement etc.
Fabrication of MS Channel angle iron after cutting in required size with drilling of holes upto good finish of top channel, bracing and special type brackets etc. as per RESPO Drawing and local approved drawings.
Erection with digging of pits for stay as per RESPO manual in all type of soil, grouting of stay rod with cc 1:4:8 cement block including cost of Ballast, sand and cement, Back filling of soil and Boulders in the pit and ramming Nozzlling and fixing of stay wire with pole and stay rod as per drawing.
Erection and earthing of support with MS earth rod of 2500 mm long including excavation pit and digging of MS Rod to proper depth and connecting the earth electrod with the help of GI Wire as per RESPO
Laying, Spreading, Sagging and stringing of 11 KV line in 3 Phase (3 Phase 4 wire) of the ACSR Weassel wire with GI/weassel earth wire complete including fixing of all accesaries in 3 Nos conductors in Parallel with binding and jumpring as per profile and sagging chart.
Laying, Spreading, Sagging and stringing of 11 KV line in 3 Phase (3 Phase 4 wire) of the ACSR Rabbit wire with GI/weassel earth wire complete including fixing of all accesaries in 3 Nos conductors in Parallel with binding and jumpring as per profile and sagging chart.
Laying, Spreading, Sagging and stringing of LT line of the ACSR Weassel 3 Phase 5 Wire Length wire with GI earth wire complete including binding Jumpering as per RESPO.
Laying, Spreading, Sagging and stringing of LT line of the ACSR Weassel 3 Phase 4 Wire Length wire with GI earth wire complete including binding Jumpering as per RESPO.
Laying, Spreading, Sagging and stringing of LT line of the ACSR Weassel 2 Phase 3 Wire Length wire with GI earth wire complete including binding Jumpering as per RESPO.
Laying, Spreading, Sagging and stringing of LT line of the ACSR Weassel 1 Phase 2 Wire Length wire with GI earth wire complete including binding Jumpering as per RESPO.
Laying, Spreading, Sagging and stringing of LT line of the ACSR Rabbit 3 Phase 5 Wire Length wire with GI earth wire complete including binding Jumpering as per RESPO.
Laying, Spreading, Sagging and stringing of LT line of the ACSR Rabbit 3 Phase 4 Wire Length wire with GI earth wire complete including binding Jumpering as per RESPO.
Laying, Spreading, Sagging and stringing of LT line of the ACSR Rabbit 2 Phase 3 Wire Length wire with GI earth wire complete including binding Jumpering as per RESPO.
Laying, Spreading, Sagging and stringing of LT line of the ACSR Rabbit 1 Phase 2 Wire Length wire with GI earth wire complete including binding Jumpering as per RESPO.
Gaurding of Line Over ( Telephone/ Road/LT Line Crossing as per Drawing with 6/8 SWG GI Wireincluding fixing of Gaurding Channel/angle as per RESPO LT/11 KV Line.
Laying and Erection of LT PVC Cable Including Crimping of Lugs. 4X70, 150 and 240
Mounting and Fixing of TPMO and Fuse Set on Double Pole Structure Including making of connections and complete work
Mounting and Fixing of LA Set (3Nos.) onDouble Pole Structure Including making of connections and complete work
Installation and mounting of 25 kva Distribution transformer on Double Pole Structure and fixing of channel angle etc. and making all connections of HT and LT side and its complete commissioning.
Installation and mounting of 63 kva Distribution transformer on Double Pole Structure and fixing of channel angle etc. and making all connections of HT and LT side and its complete commissioning.
Installation and mounting of 100 kva Distribution transformer on Double Pole Structure and fixing of channel angle etc. and making all connections of HT and LT side and its complete commissioning.
Painting of SP-10Single Pole Support with angle and channels and all steel part by one coat of red Oxide Primer and two coats of Alluminium Paint and two Strip of Flouroscent alternate red and White Paint 30 cm Wide upto 1.5 Mtr From Groung Level.
Painting of SP-21Single Pole Support with angle and channels and all steel part by one coat of red Oxide Primer and two coats of Alluminium Paint and two Strip of Flouroscent alternate red and White Paint 30 cm Wide upto 1.5 Mtr From Groung Level.
Painting of SP-23Single Pole Support with angle and channels and all steel part by one coat of red Oxide Primer and two coats of Alluminium Paint and two Strip of Flouroscent alternate red and White Paint 30 cm Wide upto 1.5 Mtr From Groung Level.
Route Clearance By Cutting of Tree Branches Lopping and Chopping of trees for LT and 11 KV Lines.
T-Off Connection Complete 11 KV
Installation of 11 KV Metering Cubical in the Metering Room with grouting in CC 1:4:8 as per RESPO.
Making of Connections on both Sides in Metering Cubical including Tapping.
Loading and unloading Carriage of LT PRMC from Store to Pit Site and installation on Double Pole with the help of Nut and Bolt and clamp and making to pass LT Cable from Transformer to PRMC.
JAI LAKSHMI ASSOCIATE
TARA SINGH BISHT
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .