Loading…
Loading…
Tender Value
₹2.8 L
EMD Value
₹1 L
Closing Date
16 Jun 2026, 6:00 pmClosed
Exeuctive Engineer, Panchayat, R. & B. Division, Patan
ANNUAL RATES FOR MAINTENANCE AND REPAIRS (ROAD WORK) TA- CHANASMA UNDER JURISDICTION OF R & B (PANCHAYAT) SUB DIVISION CHANASMA.
312683
05/2026-2027
Open
Civil Works - Roads
Works
Patan
5 documents required · 5 mandatory
₹1,500
Executive Engineer, Road &Building (Panchayat) Division, Patan
₹1 L
9 Jun 2026
9 Jun 2026
9 Jun 2026
16 Jun 2026
9 Jun 2026
Name of work : Annual Rates for Maintenance and repairs (Road work) Ta- Chanasma under jurisdiction of R & B (Panchayat) Sub Division
Memorandum showing items works to be carried out :
Items Quantities item of work Tendered Rates Unit Total amount
Items Quantities item of work Tendered Rates Unit Total amount
No. estimated Qty In Figure In words according to
may be more Rs. Ps estimated quantities
1 Earthwork for embankment including breaking clods,
dressing with all lead and lift (excluding watering and
consolidation)(S.O.R P.No 187 Code No 26001)
A 1.00 Cu.M. (A)From Borrow pits within land width (S.O.R P.No 187 114.44 Rupees One Hundred Cu.M.
Code No 26001A Sr.No 1) Fourteen Paise
FourtyFour Only
B 1.00 Cu.M. (B)From Borrow area within 0.5 Km.lead (upto 10 162.25 Rupees One Hundred Cu.M.
ton)(S.O.R P.No 187 Code No 26001BA Sr.No 2) SixtyTwo Paise
TwentyFive Only
C 1.00 Cu.M. (C)From Borrow area within 1.0 Km.lead (upto 10 ton) 165.43 Rupees One Hundred Cu.M.
(S.O.R P.No 187 Code No 26001CA Sr.No 3) SixtyFive Paise
FourtyThree Only
D 1.00 Cu.M. (D)From Borrow area within 2.0 Km. lead (upto 10 171.49 Rupees One Hundred Cu.M.
ton)(S.O.R P.No 187 Code No 26001DA Sr.No 4) SeventyOne Paise
FourtyNine Only
E 1.00 Cu.M. (E)From Borrow area within 3.0 Km. lead (upto 10 177.34 Rupees One Hundred Cu.M.
ton)(S.O.R P.No 187 Code No 26001EA Sr.No 5) SeventySeven Paise
ThirtyFour Only
2 1.00 Cu.M. Earthwork in cuting in all sorts of soil and soft murrum 140.87 Rupees One Hundred Cu.M.
including conveying and spreading the stuff, embankment Fourty Paise
as and where directed within 200meters from the end of EightySeven Only
the cutting with all required lead and lift.(S.O.R P.No
It.Code No. 26005, Sr.No 13)
3 Pinting and lettering with enamel paint 3- coats etc
complete.(i) Ordinary K.M. Stone for N.H. S.H. and M.D.R.
A 1.00 No (i) Ordinary K.M. Stone for N.H. S.H. and M.D.R. (S.O.R 205.29 Rupees Two Hundred Each
P.No 196,It Cd.26058A, Sr.No 99) Five Paise TwentyNine
B 1.00 No (ii) Ordinary K.M. Stone for O.D.R. and V.R. (S.O.R P.No 158.37 Rupees One Hundred Each
196,It Cd No.26058B, Sr.No 100) FiftyEight Paise
ThirtySeven Only
C 1.00 No (iii) Fifth K.M. Stone .(S.O.R P.No 196, It Cd. 26058C,Sr.No 392.99 Rupees Three Hundred Each
101) NinetyTwo Paise
NinetyNine Only
D 1.00 No (iv) Hectometer stone.(S.O.R P.No 196, It Cd No.26058D 52.79 Rupees FiftyTwo Paise Each
Sr.No 102) SeventyNine Only
E 1.00 No (v) Road sign board. (S.O.R P.No 196,It Cd No.26058E 469.25 Rupees Four Hundred Each
Sr.No 103) SixtyNine Paise
TwentyFive Only
F 1.00 No (vi) Village name board.(S.O.R P.No 196, It Cd NO.26058F 469.25 Rupees Four Hundred Each
Sr.No 104) SixtyNine Paise
TwentyFive Only
G 1.00 No (vii)Junction board.(S.O.R P.No 196, It Cd No.26058G, Sr.No 1466.40 Rupees One Thousand Each
105) Four Hundred SixtySix
Paise Fourty Only
4 Charges for Clearing Road site by removing by ganda baval
akadas, bordies etc. upto 1.5 mt On Both sides from edge of
B.T. surface including serooting by Excavator machine
&throwing away all stuff branches etc. with all lead and lift
with all material,labour etc.comp.as directed.
4.1 1.00 Km dense forest BY MECHANICAL MEANS (R.A. ) 13955.76 Rupees Thirteen Km
Thousand Nine Hundred
FiftyFive Paise
SeventySix Only
4.2 1.00 Km Scattered Forest MECHANICAL MEANS(R.A.) 11381.99 Rupees Eleven Thousand Km
EightyOne Paise
NinetyNine Only
4.3 1.00 Km dense forest By manual means (R.A. ) 47076.59 Rupees FourtySeven Km
Thousand SeventySix
Paise FiftyNine Only
4.4 1.00 Km Scattered Forest By manual means (R.A. ) 35307.27 Rupees ThirtyFive Km
Hundred Seven Paise
TwentySeven Only
5 1.00 No Geru/Chuna of road side trees including 30 cm wide patta 44.14 Rupees FourtyFour Paise No
of 3 coats of white bwashing at top & 90 cm wide patta of 3 Fourteen Only
coats of sona geru at bottom using saresh including
cleaning the surface etc as directed (R.A)
6 1.00 Hrs Engaging earth Excavator incl. cleaning sites for hire 860.64 Rupees Eight Hundred Hrs
charges of excavator incl diesel,1 labour and 1drivers etc Sixty Paise SixtyFour
complete as directed.(Hydraulic Excavator 1 cum bucket Only
capacity @ 60 cum per hour)(RA)
7 Supplying and fixing reinforced concrete heavy duty non-
pressure pipes with collars for culverts carrying heavy
traffic as per IS 458-1991 specifications including setting
the pipes in C.M. 1:2 watering and laying (to level or
slopes) of class NP3 of following internal daimeters (S.O.R
1.00 Rmt (i) 300mm dia. (upto 10 ton)(S.O.R P No.238 It Cd.26131) 1095.18 Rupees One Thousand Rmt
NinetyFive Paise
1.00 Rmt (ii) 450mm dia. (upto 10 ton)(S.O.R P No 238 It Cd 26132) 1462.01 Rupees One Thousand Rmt
Four Hundred SixtyTwo
1.00 Rmt (iii) 600mm dia. (upto 10 ton)(S.O.R P No 238 It Cd 26134) 2108.86 Rupees Two Thousand Rmt
One Hundred Eight Paise
1.00 Rmt (v) 900mm dia. (upto 10 ton)(S.O.R P No 238 It Cd 26135) 3271.56 Rupees Three Thousand Rmt
SeventyOne Paise
1.00 Rmt (vii) 1200mm dia. (upto 10 ton)(S.O.R P No238 It Cd 5516.63 Rupees Five Thousand Rmt
26137) Five Hundred Sixteen
Paise SixtyThree Only
8 1.00 Cu.M. Supplying and Stacking of quarry spall of hard stone free of 1243.02 Rupees One Thousand Cu.M.
dis integrated Pieces, deleterious and organic matter Two Hundred
including royalties & filling measure boxes with all lead FourtyThree Paise Two
and lift etc completed for road work (R.A.) Only
9 1.00 Cu.M. Supplying and stacking of machine crushed stone coarse 1384.47 Rupees One Thousand Cu.M.
aggregate chippings etc of hard stone of size 40mm to Three Hundred
63mm size free of disintegrated pieces,deleterious and EightyFour Paise
orgenic matter including royalties & filling measure boxes FourtySeven Only
with all lead and lift etc. completed for road work (R.A)
10 1.00 Cu.M. Supplying and stacking of hard morrum/sand/yellow 289.87 Rupees Two Hundred Cu.M.
earth/ binding materialapproved quality on road site EightyNine Paise
including royalties & filling measure boxes with all lead EightySeven Only
and lift etc. road work (R.A)
11 1.00 Cu.M. Spreading the stone aggregate for solling & W.B.M. 274.73 Rupees Two Hundred Cu.M.
including filling the interstices forming the road surface to SeventyFour Paise
required camber & Gradient (i) 45mm to 63mm size M.C. SeventyThree Only
aggregete (S.O.R. P.No 191 It Cd.26018A)
12 1.00 Cu.M. Spreading the binding material on road crust filling the 162.22 Rupees One Hundred Cu.M.
gaps in metal and leveling to camber and gradient as SixtyTwo Paise
directed.(S.O.R. P.No 191 It Cd.26020A) TwentyTwo Only
13 1.00 Smt Providing and fixing pre-cast Rubber Dye / steel Dye inter 700.74 Rupees Seven Hundred Smt
locking concrete block 60mm thick with grade of concrete Paise SeventyFour Only
M300 pnumatic compressed / vibrated mechanically and
as per approved design Confirming to IS 15658 :
including 35 mm Sand layer for levelling and filling the
joint with sand in proper line and level as per guidlines of
IRC : SP 63-2018 etc. Complete.(S.O.R P.No.135 It Cd
14 1.00 Sq.M. Providing and laying 23cm thick rubble stone pitching on 780.40 Rupees Seven Hundred smt
side slope on existing earthwork as per detailed drawing Eighty Paise Fourty Only
with pointing in CM 1:3 on rubble pitching and providing
coarse sand bedding 10 thick as filter media cm etc
15 1.00 Smt Rolling and consolidation of soling including filling in 22.75 Rupees TwentyTwo Sq.M.
depression which occur during the process, with power Paise SeventyFive Only
roler 8 tonne to 12 tonne.(S.O.R. P.No 191 It Cd.26021)
16 1.00 No 3787.50 Rupees Three Thousand Nos
Flood gauge sign Providing and fixing sign board made out
of 4mm aluminium composite sheet size200x43 cms
EightySeven Paise Fifty
rectangle as per design of IRC -67-2012 3.1 mtr long stand
posted frame fabricated from suitable size iron angle
,coated with one coat of epoxy primer and two coat of best
quality epoxy paint ,refectories with retro reflective
engineering grade sheeting as per latetest M.O.S.T
specification the fixing at site shall be in 1:2:4 cc block of
size 45x45x60 cms including excavation ,curing etc.comp.B-
high intensity grade sheeting(MR)
17 1.00 Cu.M. Excavation for foundation upto 1.5 m depth 128.79 Rupees One Hundred Cu.M.
including sorting out and stacking of useful TwentyEight Paise
SeventyNine Only
materials and disposing off the excavated stuff
upto 50 Meter lead.(A) Loose or soft soil
( A ) Loose or soft soil.
18 1.00 Cu.M. Providing and laying cement concrete 1:4:8 (1 2749.06 Rupees Two Thousand Cu.M.
Cement : 4 coarse sand :8 stone aggregates 40 mm Seven Hundred
FourtyNine Paise Six
nomial size) and curing complete excluding cost of
form work in (A) Foundation and plinth(R.A)
19 1.00 Cu.M. Demolition including stacking of serviceable 1133.89 Rupees One Thousand Cu.M.
materilas and disposal of unserviceable materials One Hundred
ThirtyThree Paise
with all lead and lift. (i) R.C.C. work
EightyNine Only
Sor Pg No153, It Cd NO.20002
20 1.00 MT Providing and fixing in position Fe 500D TMT for 73656.44 Rupees SeventyThree MT
R.C.C. bored piles as per detailed drawing, Thousand Six Hundred
including cutting, bending hooking tying and
FourtyFour Only
welding complete and including forming the cage
and lowering it in position.
(S.O.R. Page no.260, It.No.27043C )
21 1.00 Cu.M. Providing and casting in situ ordinary cement 4093.58 Rupees Four Thousand Cu.M.
concrete M 200 mix and providing necessary pin NinetyThree Paise
FiftyEight Only
headers including shuttering scaffolding, laying,
vibrating and finishing without V grooves
etc.complete. 0.0 to 5.0 mts . (SOR P No 262 It
22 1.00 Hour Hire Charges Tipper Truck/Dumper of minimum 1515.00 Rupees One Thousand Hour
15 ton or more capacity including operator, Fuel, Five Hundred Fifteen
oil, Grease etc. all such complete. (MR)
23 1.00 NosEngaing Labours for various Work on road site & 491.87 Rupees Four Hundred Nos
building as per instruction of engineering in NinetyOne Paise
EightySeven Only
charge SOR 2023-24 L037)
24 1.00 km Hire Charges Tipper Truck/Dumper of approx 25 54.54 Rupees FiftyFour Paise km
ton capacity including operator, Fuel, oil, Grease FiftyFour Only
and taking Hot mix material from Batch mix or hot
mix Bitumin plant and spreading the same on site
as directed by Engineer Incharge etc. (R.A.)
25 1.00 MT Spreading the material of It no 14 on site as 223.34 Rupees Two Hundred Cumt
directed by Engineer Incharge etc. (R.A.) TwentyThree Paise
ThirtyFour Only
26 1.00 Hour Clearing of CD works pipe for monsoon treatment
including removing the jungle up to 15 mt on
boths sides U/S & D/S of CD work by JCB machine
providing the gutter on boths side up to 10 mt
opening the pipes by labour & opening the water
way etc complete
A 1.00 Nos 1 Row CD work Cleaning 3254.22 Rupees Three Thousand No
Two Hundred FiftyFour
Paise TwentyTwo Only
B 1.00 km 2 Row CD work Cleaning 4753.06 Rupees Four Thousand No
FiftyThree Paise Six Only
C 1.00 MT 3 Row CD work Cleaning 6252.91 Rupees Six Thousand No
Two Hundred FiftyTwo
Paise NinetyOne Only
D 1.00 Nos 4 Row CD work Cleaning 7751.75 Rupees Seven Thousand No
Seven Hundred FiftyOne
Paise SeventyFive Only
E 1.00 km 5 Row CD work Cleaning 9251.60 Rupees Nine Thousand No
Two Hundred FiftyOne
Paise Sixty Only
F 1.00 MT 6 Or More Row CD work Cleaning 10750.44 Rupees Ten Thousand No
Seven Hundred Fifty
Paise FourtyFour Only
27 1.00 km Clearing Of Box Culvert works for monsoon 6619.54 Rupees Six Thousand Six Cell
treatment including removing the jungle up to 50 Hundred Nineteen Paise
mt on boths sides U/S & D/S of Box Culvert / by
JCB machine,Removing unncesesarry
soil,grass,Vegitation etc cleaning and disposing
incluidng all labour and machinery etc complete
below box - culvert as per direction and
instruction of engineer incharge.
28 1.00 MT Clearing Of Slab Drain or Major Bridge works for 7497.23 Rupees Seven Thousand Span
monsoon treatment including removing the jungle Four Hundred
NinetySeven Paise
up to 50 mt on boths sides U/S & D/S of Slab
TwentyThree Only
Drain by JCB machine,Removing unncesesarry
soil,grass,Vegitation etc cleaning and disposing
incluidng all labour and machinery etc complete
below Slab Drain as per direction and instruction
of engineer incharge.
29 1.00 MT Providing Before/After photography of any type of 20.20 Rupees Twenty Paise No
work at any site of taluka including Soft copy & Twenty Only
Hard Photo Copy . as per directed by incharge
TOTAL AMOUNT PUT TO TENDER=
TOTAL AMOUNT PUT TO TENDER=
Dy.Executive Engineer
R. & B (P)Sub-Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
04 GR.pdf
Valid EMD.pdf
01 SBD Mandli CR Road Work.pdf
DTP CERTIFICATE-CR Road Works.pdf
Schedule B.pdf
Sharto.pdf
SPECIFICATION ANNEXURE (mandali).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .