Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.9 L
Closing Date
28 Dec 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer IFC DIvision Ganderbal
Irrigation and FC DIvision Ganderbal
Construction of Lining Wall D/S RD 1000 Mtrs on R/S near the land of Mohd Ramzan Mir at Manigam on Lar Canal Serial No 05
2021_IFC_154430_5
e_NIT NO 09 OF 2021-22
Open Tender
Civil Works
Item Rate
15 days
Irrigation and FC DIvision Ganderbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer IFC DIvision Ganderbal
Exempted
29 Dec 2021
21 Dec 2021
29 Dec 2021
21 Dec 2021
28 Dec 2021
21 Dec 2021
90 days
Amount
Earth –work in excavation by manual means over areas (exceeding 30cm & upto 1.5m in depth, 1.5 mtrs in width as well as 10 sq m on plan ) including disposal of excavated earth upto 1m for cutting edges, disposed earth to be levelled and neatly dressed. All kinds of soils.
Providing and laying stone soling in horizontal on level incl.cost of stones
Providing and laying in position cement conc. of specified grade excluding the cost of centering and shuttering. All work up to plinth-level. a) 1:4:8 (1 cement ,4 Coarse sand, 8 graded-stone. aggregate) 40mm nominal size (crushed)
Providing and laying in position cement conc. of specified grade excluding the cost of centering and shuttering. All work up to plinth-level in:- a) (1:3:6) 1 cement, 3coarse sand,6 graded-stone. aggregated 20mm nominal size (crushed)
Centering and shuttering including shuttering , Propping etc and removal of form work for:- a) Foundations footings bases of columns etc for mass conc. & access platform
12mm cement plasters of mix (1:4) 1cement,4 fine sand)
Carriages of different materials from source to road site of work by mechanical transport incl. loading, unloading and stacking:
40mm stone agg. from Wussan for Avg.lead 10kms
20mm stone agg. From Wusan 10 kms avg.
Sand From Gbl. 12 kms avg
Cement from divi. Store Gulabagh for av.20 kms
Soling stone from Wusan Avg.lead 11 kms
ABID SHAMS RATHER
MOHD HUSSAIN BHAT
RAMEEZ UL KHALIQ
Mr. Aijaz Ahmad Mir
MOHD YOUSUF LAWAY
stage.html
html • 0.03 MB
finance_344305.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .