Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance KOTTAYAM | KERALA | 686001 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.5 L+₹5,328.89 (2.22%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹6,344
Closing Date
30 Oct 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
office of AEE LIDEW sub divi Lalam BP
AE office of AEE LIDEW sub divi Lalam BP
Annual Plan-2026 27 Lalam Block panchayath project number S0146 27 Inchikavu Anikkuzhi DWSS Maintenance in Ullanad divisionGeneral Civil Work
2026_LSGD_881010_1
ET05-03/AE/LALAM/LIDEW/2026-27
Open Tender
Civil Works - Canal
Percentage
120 days
Lalam BP
Please refer Tender documents.
8 documents required · 8 mandatory
₹560
₹6,344
31 Oct 2026
22 Oct 2026
31 Oct 2026
22 Oct 2026
30 Oct 2026
22 Oct 2026
22 Oct 2026 - 30 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Side wall | |||||
| 1.001 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 18.2 | cum | 9,963.93 | ₹1,81,343.53 |
| 1.002 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 240.32 | kilogram | 112.43 | ₹27,018.95 |
| 1.003 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 47.9 | sqm | 386.16 | ₹18,497.06 |
| 1.004 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 11.48 | cum | 359.72 | ₹4,129.59 |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.87 | cum | 7,932.89 | ₹22,767.39 |
stage.html
html • 0.02 MB
finance_1498516.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1498516.xls
BOQ • 0.31 MB
146SBD.pdf
Tender Documents • 1.81 MB
146NIT.pdf
Tender Documents • 0.03 MB
TomeExtensionCorrigendumET05.pdf
PDF • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .