| # | Company | Amount |
|---|---|---|
| 1 | ₹26.2 Cr Per unit ₹2,17,12,000–₹2,21,84,000 | ₹26.2 Cr Per unit ₹2,17,12,000–₹2,21,84,000 |
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
26 Jun 2026, 2:15 pmClosed
Single Packet
Normal Tender
No
Not Applicable
Total Value Wise
Lowest to Highest
Please see item details
Not Applicable
120 days
Expenditure
General
P8
2 conditions
Tenderer please refer Eligibility Conditions for procurement as per Annexure attached as Tender Document.
As per Public Procurement (Preference to Make in India) Order 2017, as amended, tendered item is to be procured from Class-I Local suppliers only and the vendors who do not qualify to be Class-I local supplier should not quote in the tender as their offers shall not be considered for any ordering.
66 conditions · 4 needing a document upload
In case of indigenous bidders, whether you are Large scale Industry or consortia of MSEs formed by NSIC, if yes, have you indicated quantum of sub contracts given to Micro and Small Enterprises (in percent of order value)?
Have you gone through the Eligibility Criteria and submitted all the documents mentioned therein?
Have you submitted the EMD or claimed exemption duly uploading documentary evidence in support of your claim along with Bid securing declaration as per clause 6.1 of section-I of Instructions to Tenderers of ICF Bid Document?
Have you confirmed for compliance of Public Procurement orders of Department of Expenditure regarding countries sharing land border with India?
Have you furnished the statement of Equipment & Quality Control?
Have you furnished tender specific letter of authority (if manufacturer has not quoted directly) to bid on behalf of manufacturer as per Annexure -lI of ICF bid document attached with tender.
Have you kept your offer valid for the validity period as mentioned in NIT header?
Have you submitted detail of location(s) at which local value addition is made/proposed?
Have you submitted self-declaration with respect to non- debarment under any provisions of DPIIT rules?
Have you submitted translated copy into English, for all documents in language other than English and all such documents should be signed by the authorised translator and notarized in India?
Have you submitted declaration for passing on the input tax credit as per para 2.8 and 2.9 of section-II of ICF Bid Document.
Have you submitted authenticated copy of the document authorizing the signatory to submit offer and commit on behalf of tenderers?
Public Procurement (Preference to Make in India) policy is applicable as per Clause 16 of Section-I of ICF Bid Document attached with tender. The procurement shall be done in accordance with the extant instruction of DPIIT (Department of Promotion of Industry and Internal Trade) for Make in India policy.
The bidders shall be required to provide a self certificate for the local content at the time of tendering as per provisions in Public procurement (Preference to Make in India) order. However, at the time of execution of the contract, a certificate from the statutory auditor or cost auditor of the company (in the case of companies) or from a practising cost accountant or practising chartered accountant (in respect of suppliers other than companies) giving the percentage of local content shall be provided. Please refer clause 16.1.3 and 16.1.4 of section-I of Bid document for further details and Annexure VII of Bid document for the format of Certificate of local content.
The certificate for local content shall have valid UDIN and Purchaser reserves the right to verify the authenticity of CA certificate from the following links. a.For Chartered Accountants https://udin.icai.org/search-udin b.For Cost Accountants https://elcmal.in/udin/VerifyUDIN.aspx c.For Company Secretaries https://stimulate.icsi.edu/udin/Home/UDINVerification
EARNEST MONEY DEPOSIT (EMD): - : i) Regarding EMD, please refer to clause 6.1 of section I Instructions to tenderer of ICF Bid Document attached to the tender. . Tenderers seeking exemption from payment of EMD must upload the requisite documentary evidence in support of their claim for exemption from payment of EMD along with the offer. ii).Traders/Distributors/sole agent/works contract are not exempted from payment of EMD as they are excluded from the purview of the MSE policy. iii). In reference to condition No.6.1 (vi) of Section I of ICF Bid Document, the exemption of EMD is applicable only to the vendors having current and valid registration with Zonal Railways/Production Units for any of the (trade Group 3401- Equipments, spares and components required for trainsets). Firm should submit valid registration certificate for proof.
(i) In case of MSE firm willing to claim the benefits under Public Procurement Policy (Preference to MSE) order 2012, the firm should upload with their offer, the proof of their being MSE registered with the agency mentioned in clause 13.1 of section-I of ICF Bid document, failing which such offers will not be liable for consideration of benefits detailed in para 13.3 of section-I of ICF Bid document. (ii) As per Gazette notification no. S.O.4926(E) dated 18.10.2022 amending notification no. S.O.2119(E) dated 26.06.2020 circulated vide Railway Board letter no. 2020/RS(G)/363/1 dated 03.11.2022 regarding re-classification of enterprises and Udyam registration, " In case of an upward change in terms of plant and machinery or equipment or turnover or both, and consequent reclassification, an enterprise shall continue to avail of all non-tax benefits of the category it was in before the re-classification, for a period of three years from the date of such upward change." In such cases, the tenderer claiming such benefits shall submit necessary documentary evidence along with offer. (iii) Tenderers shall upload Udyam Registration detail showing that the enterprise is owned by Scheduled Castes (SC)/ Scheduled Tribes (ST)/ women entrepreneurs to claim the benefit under this subclassification.
The bidders should quote the applicable HSN codes and it is the responsibility of the tenderer t o quote the correct HSN code and upload the document.
Goods & Services Tax (GST): Will be applicable as per Clause 2.0 and all sub clauses of Section-II of ICF Bid Document attached with tender.
Passing the benefits of ITC: I hereby confirm following: 'We hereby declare that in quoting the above price, we have taken into account the full effect of Input Tax Credit available under GST. We, further agree to pass on any financial gain/benefit as may become available in future in respect of all the input tax credit on the date of supply by way of reduction in price and advise the purchaser accordingly. We also undertake that we are aware of the provisions of section 171 of the CGST Act and consequences thereof if we fail to comply with the same."
This tender is f o r supply and Installation, f o r PL 31362229 (MBU) and P L 3136 2217 ( E B U ) Firms should quote supply and installation charges separately. TENDERERS ALSO PLEASE REFER CLAUSE 27.0 OF ICF BID DOCUMENT REGARDING SPECIAL CONDITION FOR ALL SUPPLY AND INSTALLATION CONTRACT
Tenderer to note that basic equipment (EBU & MBU) includes laptop for every 2 rakes, Tenderer to quote basic equipment and laptop separately as Annexure.
It will be presumed that the firms who have submitted the e- bid have gone through and accepted all the terms and conditions of tender, until and unless firms specify the deviations from those conditions and so indicated specifically, under the headings - "Technical Deviation Statement" and "Commercial Deviation Statements". And if space available is not adequate, tenderers can upload a Statement of Deviations and a reference of uploaded deviation statement shall be given in "Technical or Commercial Deviation Statement". If there is any contradiction between any techno commercial terms and conditions quoted in e-offer and documents attach e d along with the e-offer, the terms & conditions quoted in e-offer will prevail over that of quoted in attached documents. Tenderers in their own interest are advised not to quote any techno commercial terms & conditions in attached documents.
Please submit the details of the location at which the local value addition is being made.
It is certified that the item offered meets the local content requirement for Class-I local supplier.
JIT Delivery Conditions: Applicable only for EP BRAKE SYSTEM i.e, EBU to PL 31362217 and MBU to PL 31362229 i) Being "As and When/JIT" required item(s),tentative delivery completion time for tendered/PO quantity is given in Tender/PO. The firm has to supply material as per monthly/weekly allotment of quantity as per schedule, which will be advised minimum 30 Days in advance through meeting minutes/letter. It may be noted that 30 days will be counted from the date of modification advice. This allotted quantity shall be required to be supplied as per the schedule advised through letter/Modification advice. For the first allotment after placement of PO,minimum time of 45 days/as per P.O will be allowed since firms may require additional time for procurement of raw materials/bought out items.However,in subsequent allotments minimum time of 30 days only will be allowed. ii) Every allotment shall be considered a severable contract. Notwithstanding the facts that terminal delivery period for complete supplies is at a later date, performance of the contract by the vendor will be dependent on the successful supplies against weekly/monthly requirements advised to the firm as severable contracts. If the firm fails to supply the allotted requirement as per schedule, ICF reserve the right to cancel the order of unsupplied allotted quantity by levying the damages including forfeiture of proportionate security deposit as applicable in the event of failure of the contract as per the terms and conditions. iii) In case of two continuous failures against allotments, ICF reserves the right to cancel the balance (unallotted) quantity of the contract also as per the terms and conditions applicable for cancellation duly noting poor performance irrespective of the final delivery date as per the original P.O. In case of continuous failures as above, the terminal delivery period shall not be the binding for cancellation of balance quantity of the contract. iv) In case of failure of supply by firm in the allotted week/month as per Schedule and if ICF decides to accept the delayed supply, ICF reserve the right to levy LD on such delayed quantity, as applicable in the event of delayed supplies, as per the terms and conditions. v) Allotment will only be given "as and when"required by the ICF as per production requirement and ICF does not guarantee that quantity allotment will be given every week/month. vi) Material should be offered for third party inspection as mentioned in PO for the quantity allotted through M.A.and within the DP given for the allotted quantity in the modification advice of contract.Terminal delivery period shall not be taken as granted for inspection purpose.
For the purpose of allotment being JIT item, firm to inform their maximum monthly rate of supply while submitting offer, failing which firm has to supply quantity allotted by ICF.
For the purpose of allotment being JIT item, firm to inform lead time required by them for supplying monthly rate of quantity, failing which firm has to supply as per lead time decided by ICF.
The tenderers shall indicate the details of their jurisdictional Assessing Officers (Designation, address & email id) for GST
SVC: Statutory Variation in taxes and duties, or fresh imposition of taxes and duties by State/ Central Governments in respect of the items stipulated in the contract (and not the raw materials thereof), within the original delivery period stipulated in the contract, or last unconditionally extended delivery period shall be to Railways' account. Only such variation shall be admissible which takes place after the tender opening date. No claim on account of statutory variation in respect of existing tax/duty will be accepted unless the tenderer has clearly indicated in his offer the rate of tax/duty considered in his quoted rate. No claim on account of statutory variation shall be admissible on account of miss classification by the supplier/ contractor.
Evaluation criteria : This tender is for supply and installation of EBU and MBU and Maintenance Schedules for EP brake system after initial warranty. Te n d e r e r t o q u o t e r a t e s f o r EBU, MBU and Maintenance Schedules separately. Evaluation will be based on total value.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
1 condition
Validity of Offer: No deviation from the offer validity period stipulated in the NIT header of this tender document is permitted. For additional conditions please refer Clause 12.0 of Section -I of ICF Bid Document.
1 location across Tamil Nadu · 300 Set total
Supply, Installation and Commissioning of Electro Pneumatic Wheel Mounted Brake System i.e. BRAKE EQPT-MIDDLE BASIC UNIT (MBU), END-BASIC UNIT (EBU) AND ITS MAINTENANCE SCHEDULE FOR Vande Bharat Sleeper Rakes
08261045
08261045
Open - Indigenous
Mixed (Goods/Service/AMC)
Chennai, Tamil Nadu
₹0
₹50 L
21 Sept 2026
20 May 2026
3 items · 300 Set total
SUPPLY, INSTALLATION AND COMMISSIONING OF ELECTRO PNEUMATIC WHEEL MOUNTED BRAKE SYS TEM FOR END BASIC UNIT OF 160 KMPH EMU TRAIN SET AS PER RDSO SPECIFICATION No.RDSO/CG/S/25010(Rev-00 )(LATEST REVISION/AMENDMENT) ALONG WITH ANNEXURE TO RDSO SPEC RDSO/CG/S/25010-REV-00(SCHEDULED MAINTENANCE RATE CONTRACT OF BRAKE SYSTEM FOR 160 KMPH TRAINSET),ANNEXURE TRAINSET-AJ,REV-02,DAT ED-22-04-2026. Note : 1. Auxiliary Air Supply unit is not part of scope of supply. 2. The firm shall supply one laptop f or every 2 rakes (assuming 24 cars per rake) as per RDSO/CG/S/25010, REV-0, Annexure TRAINSET-AJ, REV-02. 3. B RAKE PAD SHALL COMPLY WITH RDSO SPECIFICATION NO.RDSO/2013/CG-01,LATEST REVISION/AMENDMENT. 4.BRA KE DISC SHALL COMPLY WITH RDSO SPECIFICATION No.RDSO/2017/CG-02,LATEST REVISION/AMENDMENT. 5. PACKI NG CONDITION SHALL BE AS PER DOC.No.PC-052 OF ICF/MD/SPEC-485. 6. Quantity required for End Basic unit (EBU) per rake : 2 sets [ Warranty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| FURNISHING DEPOT/ICF,Chennai, ICF | Tamil Nadu | 100.00 Set |
| Total | 100 Set | |
SUPPLY, INSTALLATION AND COMMISSIONING OF ELECTRO PNEUMATIC WHEEL MOUNTED BRAKE SYS TEM FOR MIDDLE BASIC UNIT OF 160 KMPH EMU TRAIN SET AS PER RDSO SPECIFICATION No. RDSO/CG/S/25010-RE V-00,(LATEST REVISION/AMENDMENT) ALONG WITH ANNEXURE TO RDSO SPEC RDSO/CG/S/25010-REV-00(SCHEDUL ED MAINTENANCE RATE CONTRACT OF BRAKE SYSTEM FOR 160 KMPH TRAINSET),ANNEXURE TRAINSET-AJ,REV-02,D ATED-22-04-2026. Note : 1. Auxiliary Air Supply unit is not part of scope of supply. 2. The firm shall supply one lapto p for every 2 rakes (assuming 24 cars per rake) as per RDSO/CG/S/25010, REV-0, Annexure TRAINSET-AJ, REV-02. 3. BRAKE PAD SHALL COMPLY WITH RDSO SPECIFICATION NO.RDSO/2013/CG-01,LATEST REVISION/AMENDMENT. 4.BR AKE DISC SHALL COMPLY WITH RDSO SPECIFICATION No.RDSO/2017/CG-02,LATEST REVISION/AMENDMENT. 5. PACK ING CONDITION SHALL BE AS PER DOC.No.PC-052 OF ICF/MD/SPEC-485. 6. Quantity required for MBU per rake : 4 se ts [ Warranty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| FURNISHING DEPOT/ICF,Chennai, ICF | Tamil Nadu | 200.00 Set |
| Total | 200 Set | |
SCHEDULE MAINTENANCE WITH SUPPLY OF MUST CHANGE ITEMS AND CARRYING OUT SCHEDULE MAI NTENANCE AT 27 MONTHS , 36 MONTHS (SS2) ,45 MONTHS , 54 MONTHS(SS1) , 63 MONTHS AND 72 MONTHS (SS3 ) FOR COMPLETE RAKE OF EP BRAKE SYSTEM OF 160KMPH TRAIN SET COMPRISING OF 2 END BASIC UNITS AND 4 MI DDLE BASIC UNITS TO RDSO SPEC. RDSO/CG/S/25010 REV.0)LATEST REVISION / AMENDMENT (WITHOUT AUXILIARY AIR SUPPLY UNIT) FOR TRAINSET VB SLEEPER. NOTE: 1. SCHEDULE SHALL CONFIRM TO CORRECTION SLIP-1 FOR VA NDE BHARAT EXPRESS TRAINSET (V2.0) MAINTENANCE MANUAL, VOLUME-II PUBLISHED BY CAMTECH AND ANNEXU RE TO RDSO SPEC. NO. RDSO/CG/S/25010(REV.0) LATEST REVISION / AMENDMENT. 2. ANY UPDATES OR MODIFICATI ONS ISSUED BY RDSO/CAMTECH/ICF FROM TIME TO TIME SHALL BE BINDING ON THE SUPPLIER WITHOUT ADDITION AL COST IMPLICATIONS. 3.TENDERER TO QUOTE ALL INCLUSIVE COST IN THE COLUMNS CREATED FOR MAINTENANCE SCHEDULES FOR 6 YEARS (YEAR1 MEANS -27 MONTH SCHEDULE, YEAR2 MEANS 36 MONTHS (SS2), YEAR 3 MEANS 45 MONTHS ,YEAR 4 MEANS 54 MONTHS(SS1), YEAR 5 MEANS 63 MONTHS and YEAR 6 MEANS 72 M ONTHS (SS3)) AS PER DETAILS IN THE ANNEXURE ATTACHED .Note:-YEAR 1 will be counted from Date of Commissio ning of the respective Rake and in case 27TH MONTH SCHEDULE FALLS WITHIN WARRANTY PERIOD, NO PAYMENT W ILL BE PAID FOR YEAR 1. 4. QUANTITY IN SET MENTIONED IN THE UNIT COLUMN IS FOR RAKE SET ONLY [ Warranty Period: 2 years, AMC Period: 6 years, Rate of Discounting: 10 % ] ]
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5772613.pdf
ATTACHMENT
5736175.pdf
ATTACHMENT
5778956.pdf
ATTACHMENT
5778960.pdf
ATTACHMENT
5754380.pdf
ATTACHMENT
5772488.pdf
ATTACHMENT
5779473.pdf
ATTACHMENT
5772659.pdf
ATTACHMENT
5772665.pdf
ATTACHMENT
5779263.pdf
ATTACHMENT
5779267.pdf
ATTACHMENT
5779270.pdf
ATTACHMENT
5779274.pdf
ATTACHMENT
5772640.pdf
ATTACHMENT
VERSION-13.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .