Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.5 LAccepted-AOC BALASORE R B DIVISION II BALASORE | NUAPADA | ODISHA | 766104 | L1 | Accepted-AOC Awarded | |
| 2 | L2₹65.4 L+₹91,417 (1.42%)Rejected-AOC | L2 | Rejected-AOC Cancelled | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹68.0 L
EMD Value
₹68,035
Closing Date
5 Dec 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE RWSS DIVISION BALASORE
O/O EE RWSS DIVISION BALASORE
RPWS WORKS
2020_RWSS_64141_1
TCN NO. 14 DT. 17-11-2020
National Competitive Bid
Civil Works - Water Works
Lump-sum
330 days
BALASORE
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹68,035
Yes
O/O EE RWSS DIVISION BALASORE
17 Feb 2021
26 Nov 2020
11 Dec 2020
26 Nov 2020
5 Dec 2020
26 Nov 2020
26 Nov 2020 - 30 Nov 2020
26 Nov 2020
90 days
Amount
Laying and Jointing PVC Pipe. Heading
Supplying all materials , labour , T&P , design , drawing , soil testing etc. completein all respectfor construction of RCC Roof building pump house and construction of compound wall for pump house and construction of approach road alongwith site Development including laying , testing and commissioning of Rising main & Distribution system pipe line such as UPVC , HDPE , ASTM , GI pipe lines etc. along with required fittings & specials and construction of RCC Valve chambers(water proof), public stand posts , individual house hold connection , stand alone , storage tank , installation of Chlorination system , installation of asubmersible pump withmotor in deep Tube well etc. ( Including supply of stand by pump motor ) , internal wiring of pump house & installation of Servo Stabilizer , External Electrification etc. as per supplied Drawing in section - 7 and detail scope of work & Technical specification , Quantity of work mentioned in section - 5 and in ( Annexure - A to G ) of village PARIVILLA . All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimentions are as per supplied drawings and as per direction of Engineerr- in -charge. All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7.00 mtr and residual chlorine of 0.20 mg/ ltr without any leakage in the entire PWS System.
Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing approved from(State Technical Sanction Agency ), construction,errection,testing & commissioning etc. of 50,000 ltr RCC elevated storage reservoir with necessary staging height of 15 mtr cosisting of minimum 6 nos RCC columns and circular dome using CC M-25 , ISI marked CI sluice valve, butter fly valve & it's RCC valve chambers,supplying, fitting & fixing of medium grade GI pipe of required dia & length from source to ESR , ESR to sluice valves ,for in-let,out-let,over flow & washing line, R.C.C. stair case with S.S. hand rail at dome and landing etc. and stainless steel ladder inside and outside the ESR,lightening arrester,water level indicator,CI puddle collar,0.6 m dia CI manhole cover 2 nos. at dome , RCC vent with brass jally etc. complete as per detailed scope of work & technical specification mentioned & as per terms and condition of DTCN as mentioned at Sl. No. 2.5 of Section 5 and in Annexure - H including testing of soil etc. complete as per direction of Engineer in charge.
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date of defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical specification mentioned at Sl. No. 2.9 of section - 5 & in Annexure - I.
BATA KRUSHNA ROUT
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .