| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAdmitted-Finance HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | ₹3.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.3 Cr+₹16.5 L (5.34%)Admitted-Finance 56 ARUNACHALAM MAIN ROAD AMBAL NAGAR PORUR CHENNAI TAMIL NADU 600116 | THIRUVALLUR | TAMIL NADU | 600116 | ₹3.3 Cr+₹16.5 L (5.34%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical 90 POR INDUSTRIAL PARK POR POR VADODARA GUJARAT 391243 | VADODARA | GUJARAT | 391243 | - | - | Rejected-Technical Does not meet quyalifying criteria |
| Sl No | Description | Qty | Unit | SHREE ABIRAMI ENGGINEERING WORKS L2 | ASSOCIATED ELECTRICALS (GZB) PVT. LTD. L1 |
|---|---|---|---|---|---|
| 1.00Fixed Charges for 132/33kV 40 MVA Transformers | |||||
| 1.01 | Dismantling of Transformer’s including core.
-Cleaning of all healthy parts , including coils, laminations, tap changer radiator tubes, conservator, breather etc. Rebuilding of core laminations.
-Re-assembly of core and winding with new ones including brazing, soldering and insulating.
-Vacuum drying/vapour phase drying.
-Re-assembly of complete Transformer including accessories.
-Changing of all gaskets and making terminal connections including all accessories of transformer.
-Oil filling and filtration. | 2 | Nos | 38,40,000 ₹45,31,200 | 28,00,000 ₹33,04,000 Lowest |
| 1.02 | Internal painting of transformer | 2 | Nos | 72,000 ₹84,960 Lowest | 1,00,000 ₹1,18,000 |
| 1.03 | External spray painting of transformer. | 2 | Nos | 72,000 ₹84,960 Lowest | 1,00,000 ₹1,18,000 |
| 1.04 | Labour charges for overhauling of OLTC. | 2 | Nos | 72,000 ₹84,960 Lowest | 1,00,000 ₹1,18,000 |
| 1.05 | Cost of providing new insulation for leads (phase and neutral), tap leads, inter winding connections and inter coil connections. Filling of nitrogen gas for transportation & storage. | 2 | Nos | 5,40,000 ₹6,37,200 | 2,00,000 ₹2,36,000 Lowest |
| 1.06 | Cost of all tests as per clause 8.4 , Section II, after repairs of transformer including heat run test & pressure test. | 2 | Nos | 5,40,000 ₹6,37,200 | 2,60,000 ₹3,06,800 Lowest |
| 1.07 | Total(Sum of 1.01 to 1.06) for 40MVA Transformer to be entered by the bidder | 2 | Nos | 51,36,000 ₹60,60,480 | 35,60,000 ₹42,00,800 Lowest |
| 1.08 | TRANSPORTATION CHARGES :
To & fro transportation charges including loading & unloading and requisite dragging applicable on average basis from and to anywhere in MP | 2 | Nos | 14,00,000 ₹16,52,000 Lowest | 16,00,000 ₹18,88,000 |
Tender Value
Refer Docs
EMD Value
₹3.2 L
Closing Date
14 Jan 2021, 3:30 pmClosed
CE (Procurement)
Block No 3 Shakti Bhawan MPPTCL Rampur Jabalpur
Repair of 02 Nos. 132kV Power Transformers
2020_MPPTC_115554_1
TR-38/2020
Open Tender
Miscellaneous Services
Item Wise
400 days
Jabalpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,600
₹3.2 L
Yes
5 Apr 2021
24 Nov 2020
15 Jan 2021
24 Nov 2020
14 Jan 2021
7 Dec 2020
Fixed Charges for 132/33kV 40 MVA Transformers
Dismantling of Transformer’s including core. -Cleaning of all healthy parts , including coils, laminations, tap changer radiator tubes, conservator, breather etc. Rebuilding of core laminations. -Re-assembly of core and winding with new ones including brazing, soldering and insulating. -Vacuum drying/vapour phase drying. -Re-assembly of complete Transformer including accessories. -Changing of all gaskets and making terminal connections including all accessories of transformer. -Oil filling and filtration.
Internal painting of transformer
External spray painting of transformer.
Labour charges for overhauling of OLTC.
Cost of providing new insulation for leads (phase and neutral), tap leads, inter winding connections and inter coil connections. Filling of nitrogen gas for transportation & storage.
Cost of all tests as per clause 8.4 , Section II, after repairs of transformer including heat run test & pressure test.
Total(Sum of 1.01 to 1.06) for 40MVA Transformer to be entered by the bidder
TRANSPORTATION CHARGES : To & fro transportation charges including loading & unloading and requisite dragging applicable on average basis from and to anywhere in MP
Description of Work / Item(s)
For 40 MVA Transformer
Cost of new copper coil with paper covering insulation only of all the limbs of power transformers i.e HV, & LV side of transformers. (Approx wt of copper used 40MVA - 15000Kg)
Cost of lamination that may be required to be replaced. (Approx wt 40MVA - 5000Kg)
Scrap salvage value of HV & LV copper with paper covering insulation, which will be retained by Bidder .
Scrap salvage value of laminations which will be retained by Bidder .
Description of Work / Item(s)
Repairing of OLTC
Cost of Major repair work including replacement of defective parts
Cost of Minor repair work including replacement of defective parts.
Cost of following parts of OLTC indicating freight charges, rate of taxes and duties etc for 132 KV Power Transformers
Transition Resistance
Main moving contact assembly.
Fixed contact assembly
Half assembly right
Half assembly left
Oil seal of OLTC.
Gasket for top & bottom cover
Cost of new OLTC for 132/33KV, 40 MVA Power Transformer (three phase unit)
Prices of Accessories
145KV, 1250A OIP Condenser Bushing.
72.5 KV, 1250A OIP Condenser Bushing.
OTI with repeater.
WTI with repeater
Buchholz relay
Magnetic coil level guage
Silica gel breather
Raditor
Cooling fans
Pressure relief device
OSR relay
Main conservator for 40MVA Transformer
Pronal make air cell for 40MVA Transformer
Charges towards conducting following tests on repaired 132kV transformer already included in A(6) of Schedule-I (Part-A)
Heat Run Test
Pressure Test on Tank
Additional charges towards conducting impulse tests as per CL8.4.2 of Section II , on repaired 132kV transformer to be paid if required to be carried out .
SHREE ABIRAMI ENGGINEERING WORKS
ASSOCIATED ELECTRICALS (GZB) PVT. LTD.
SHREE ABIRAMI ENGGINEERING WORKS
Cost of lamination that may be required to be replaced. (Approx wt 40MVA - 5000Kg)
Cost of Major repair work including replacement of defective parts
Cost of new copper coil with paper covering insulation only of all the limbs of power transformers i.e HV, & LV side of transformers. (Approx wt of copper used 40MVA - 15000Kg)
Cost of new OLTC for 132/33KV, 40 MVA Power Transformer (three phase unit)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .