| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹2.1 Cr | L1 | Accepted-AOC DUE TO LOWEST RATE |
| 2 | L2₹2.2 Cr+₹7.5 L (3.57%)Rejected-Finance 0 272 273 1 | ₹2.2 Cr+₹7.5 L (3.57%) | L2 | Rejected-Finance BID REJECTED DUE TO HEIGHER RATE |
| 3 | L3₹2.2 Cr+₹12.6 L (5.96%)Rejected-Finance GRAM TINANHARI POST NATHNAGAR THANA MAHULI DISTRICT SANT KABIR NAGAR | AMROHA | UTTAR PRADESH | 244102 | ₹2.2 Cr+₹12.6 L (5.96%) | L3 | Rejected-Finance BID REJECTED DUE TO HEIGHER RATE |
| 4 | L4₹2.3 Cr+₹18.2 L (8.64%)Rejected-Finance 0 STATION ROAD PARICHHA PARICHHA NEAR BANK OF INDIA JHANSI UTTAR PRADESH 284305 | JHANSI | UTTAR PRADESH | 284305 | ₹2.3 Cr+₹18.2 L (8.64%) | L4 | Rejected-Finance BID REJECTED DUE TO HEIGHER RATE |
| 5 | L5₹2.3 Cr+₹20.5 L (9.71%)Rejected-Finance | ₹2.3 Cr+₹20.5 L (9.71%) | L5 | Rejected-Finance BID REJECTED DUE TO HEIGHER RATE |
Tender Value
₹2.6 Cr
EMD Value
₹5.1 L
Closing Date
12 Aug 2024, 12:00 pmClosed
Superintending Engineer
Irrigation Works Circle Sitapur
Restoration and demarcation of permanent land of Oel Dy. from Km. 0.000 to 11.250 in District-Lakhimpur Kheri (Lot-01)
2024_UPIDC_942818_1
03/SE/2024-25
Open Tender
Civil Works
Item Wise
180 days
Lakhimpur Kheri
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹5.1 L
18 Sept 2024
3 Aug 2024
12 Aug 2024
3 Aug 2024
12 Aug 2024
3 Aug 2024
Amount
Earth work in clearance (cutting/filling) of section of canal inclusive of manual compaction but excluding of mechanical compaction also including lead up to 100 Mtr & lift up to 1.50 Mtr and dressing of excavated soil (For Making theoritical Section with service Road)
Earth work in excavation including initial lead upto 30m & lift upto 1.5m ,excluding mechanical compaction but including manual compaction and dressing to profile. (For Guage site work)
Centering & shuttering for C.C.Bed Block including cost of Shuttering, T&P etc. for complete work. (For Guage site)
P.C.C. work in 1:3:6 in Foundation including all cost of material,labour T&P etc. for complete work. (For Guage site)
Centering & shuttering for R.C.C. work including rent of shuttering, material, labour and T&P Required for completion of work for slab, and wall etc. for complete work. (For Guage site)
Cement concrete with stone ballast in R.C.C. work 1:1.5:3 including cost of material but inclusive of labour charge and T&P etc complete. (For Guage site)
Steel reinforcement including cost binding wire and bending, cutting, binding and placing in position including T&P. (For Guage site)
10 to 15 mm thick Cement Plaster in 1:4 cement mortar single coat on rough side of single or half brick wall for interior plastring in single storey building finish even & smooth including all cost of material labour T& P etc for complete work. (For Guage site)
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: 13.47.1 New work (Two or more coats applied @ 1.43 lt l0 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) (For Guage site)
Earth work in excavation including initial lead upto 30m & lift upto 1.5m ,excluding mechanical compaction but including manual compaction and dressing to profile. (For Outlets)
Centering & shuttering for C.C.Bed Block including cost of Shuttering, T&P etc. for complete work. (For Outlets)
P.C.C. work in 1:3:6 in Foundation including all cost of material,labour T&P etc. for complete work. (For Outlets)
P.C.C. 1:1.5:3 in Coping including all cost of material labour T & P etc. for complete work. (For Outlets)
M-150 1st Class Brick work in 1:4 cement mortar including cost of material ,labour T&P etc for complete work. (For Outlets)
10 to 15 mm thick Cement Plaster in 1:4 cement mortar single coat on rough side of single or half brick wall for interior plastring in single storey building finish even & smooth including all cost of material labour T& P etc for complete work. (For Outlets)
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: 13.47.1 New work (Two or more coats applied @ 1.43 lt l0 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) (For all pucca structure)
Providing and Fixing 110 mm dia PVC pipe required for proper completion of work as per direction of Engineer-in-charge. (For Outlets)
Providing and fixing of Kilimeter stone as per attached drawinng and specification including earth work, P.C.C. work in foundation, R.C.C work, painting with premium acrylic smooth exterior paint and painting letters, material, labour charge and cartage at site lead and lift etc.
Levelling and dressing for preparing of subgrade for laying of brick soling (For Brick Soling)
Both side Edging with straight over burnt laid by lenghtwise including excavation, refiliing cosilidation with a hand packing and spreading nearly surplus earth with in a lead of 50 mtr. (For Brick Soling)
Laying Brick soling layer on prepared sub grade with brick on end edging according to lines, graded and cross section shown on the drawing filling joints with sand and earth , spreading 25 mm thick layer of earth over brick soling, watering and rolling the same with three wheel road roller 80-100 KN as per MORTH. (For Brick Soling)
Earth work in excavation including initial lead upto 30m & lift upto 1.5m ,excluding mechanical compaction but including manual compaction and dressing to profile. (For Lining Work)
Centering & shuttering for C.C.Bed Block including cost of Shuttering, T&P etc. for complete work. (For Lining Work)
Providing and laying in local sand in filter including cost of all material labour ,T&P etc. (For Lining Work)
Providing and laying M-15 Cement Concrete 1:2:4 in Sleeper Safety Ladder /Steps and coping/berm with 4.75 to 20 mm size graded hard stone grit and coaese sand including centering ,shuttering , dewatering cost of all material labour ,T&P required for proper completion of work. (For Lining Work)
Painting on top of sleeper with Sealing Compound including cost of all material , fuel for heating labour ,T&P required for proper completion of work. (For Lining Work)
Supplying and laying L.D.P.film including cost of all material labour ,T&P required for proper completion of work. (For Lining Work)
Providing 100 mm thick M-15 (1:2:4) Cement Concrete in lining with 4.75 to 20 mm size graded hard stone grit and coaese sand by paver machine and chemical curing on side slope with cost of all material , labour,centering and shuttering ,T&P required for proper completion of work. (For Lining Work)
Making sub grade in lining work incluing watering, compaction and preparation of surface. (For Lining Work)
Earth work in excavation including initial lead upto 30m & lift upto 1.5m ,excluding mechanical compaction but including manual compaction and dressing to profile. (For Tail Fall Work)
Centering & shuttering for C.C.Bed Block including cost of Shuttering, T&P etc. for complete work. (For Tail Fall Work)
P.C.C. work in 1:3:6 in Foundation including all cost of material,labour T&P etc. for complete work. (For Tail Fall Work)
P.C.C. 1:1.5:3 in Coping including all cost of material labour T & P etc. for complete work. (For Tail Fall Work)
M-150 1st Class Brick work in 1:4 cement mortar including cost of material ,labour T&P etc for complete work. (For Tail Fall Work)
10 to 15 mm thick Cement Plaster in 1:4 cement mortar single coat on rough side of single or half brick wall for interior plastring in single storey building finish even & smooth including all cost of material labour T& P etc for complete work. (For Tail Fall Work)
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: 13.47.1 New work (Two or more coats applied @ 1.43 lt l0 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) (For Tail Fall Work)
Providing and Fixing 110 mm dia PVC pipe required for proper completion of work as per direction of Engineer-in-charge. (For Tail Fall Work)
Providing and fixing of boundary pillar as per attached drawinng and specification including all rate, material, labour charge and cartage at site lead and lift etc.
Demolishing Brick Work in in cement mortar including all cost of material labour T&P etcfor complete work. ( For VRBs & Syphone Work)
Earth work in excavation including initial lead upto 30m & lift upto 1.5m ,excluding mechanical compaction but including manual compaction and dressing to profile. ( For VRBs & Syphone Work)
Earth work in making Diversion Road including all lead & lift,labour T&P etc. for complete work. ( For VRBs & Syphone Work)
Centering & shuttering for C.C.Bed Block including cost of Shuttering, T&P etc. for complete work. ( For VRBs & Syphone Work)
P.C.C. work in 1:3:6 in Foundation including all cost of material,labour T&P etc. for complete work. ( For VRBs & Syphone Work)
Ist class Brick work in 1:4 in cement mortar including all mateial, labour and T&P etc. for complete work. ( For VRBs & Syphone Work)
Struck deep cement Pointing in 1:2 cement mortar including all cost of material labour T&P etc. for complete work. ( For VRBs & Syphone Work)
Centering & shuttering for R.C.C. work including rent of shuttering, material, labour and T&P Required for completion of work for slab, and wall etc. for complete work. ( For VRBs & Syphone Work)
Cement concrete with stone ballast in R.C.C. work 1:1.5:3 including cost of material but inclusive of labour charge and T&P etc for complete. Work ( For VRBs & Syphone Work)
P.C.C. 1:1.5:3 in wearing coat ,floor including all cost of material labour T & P etc. for complete work. ( For VRBs & Syphone Work)
Steel reinforcement including cost binding wire and bending, cutting, binding and placing in position including T&P. etc. for complete work. ( For VRBs & Syphone Work)
Brick on Edge soling in floor including all cost of material,labour T&P etc for complete work. ( For VRBs & Syphone Work)
Earth work in Dismantling Diversion Road including all lead & lift ,labour T&P etc.for complete work ( For VRBs & Syphone Work)
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: 13.47.1 New work (Two or more coats applied @ 1.43 lt l0 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) ( For VRBs & Syphone Work)
Dressing of Daula
Supply and fixing of Sign Board including all cost of material ,labour T&P etc.
Replacement of old steel gate on head & X- regulators including all material, T&P and Labour charges.
Painting of gate by applying one coat of red oxide zinc chromate primer and second coat of high class synthetic enamel paint of standerd make after proper cleaning, scraping the surface i/c cost of all material labour T&P and scafolding with proper safety arrangement for proper completion of work.
Painting letters above 8cm and upto 15 cm size complete including supply of all material labour & T&P etc.
TRISHIRA CONSTRUCTION PVT LTD
SHIVANAND SHUKLA
M/S Singh Construction
DHARAM DEV CHAUHAN
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .