Tender Value
₹2.5 Cr
EMD Value
₹7.5 L
Closing Date
7 Sept 2026, 3:00 pm6d left
Chief Engineer
LDA Gomti Nagar Lucknow
Hussainganj estith Vikasdeep Complex ke Retrofitting ka karya
2026_LDAUP_1172278_1
75/E-Tender/CE/2026-27
Open Tender
Civil Works
Fixed-rate
270 days
LDA Gomti Nagar Lucknow
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,366
Secretary LDA
₹7.5 L
7 Sept 2026
25 Jul 2026
8 Sept 2026
25 Jul 2026
7 Sept 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. | 7,020 | SQM | 267.2 | ₹18,75,744 |
| 2 | Providing and fixing Scaffolding net of required width made of high density Polyethylene UV stabilized knitted on warp knitting machines having density 100 gram/sqm and shading coefficient minimum 75% around the construction site/ for vertical extension as per requirement including fastening/tying with building/scaffolding pipes or with any other fixtures etc. complete as per direction of Engineer-in-Charge. (One time payment shall be made for providing Scaffolding net from start of work till completion of work including shifting if any. The Scaffolding net shall be the property of the contractor on completion of the work) | 7,020 | SQM | 23.11 | ₹1,62,232.2 |
| 3 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 5,269 | SQM | 43.17 | ₹2,27,462.73 |
| 4 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge | 331 | SQM | 202.5 | ₹67,027.5 |
| 5 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge | 1,322 | SQM | 100.13 | ₹1,32,371.86 |
| 6 | "Polymer Modified Cement Mortar: Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75 mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2)." 12 mm average thickness. | 88 | SQM | 307.02 | ₹27,017.76 |
| 7 | "Polymer Modified Cement Mortar: Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75 mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2)." 25 mm average thickness in two layers | 700 | SQM | 463.98 | ₹3,24,786 |
| 8 | Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.Upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 46,392.76 | KG | 71.5 | ₹33,17,082.05 |
| 9 | "Rust Convertor : Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge." Bars upto 12 mm diameter (considering 30 % of the exposed steel to be of 12 mm dia) | 6,740.01 | RMT | 6.52 | ₹43,944.86 |
| 10 | "Rust Convertor : Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge." Bars above 12 mm diameter (considering 70 % of the exposed steel to be above 12 mm dia) | 15,725 | RMT | 12.99 | ₹2,04,267.75 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.01 MB
BID.pdf
Tender Documents • 2.54 MB
BOQ_2201584.xls
BOQ • 0.31 MB
corrigendum.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].