| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.8 LAccepted-AOC NICHE BAZAR CHIKUNDA P O CHIRKUNDA DIST DHANBAD 828204 | DHANBAD | JHARKHAND | 828204 | ₹3.8 L | L-1 | Accepted-AOC as per TC recommendation. |
| 2 | L-2₹3.8 L+₹324.03 (0.08%)Rejected-Finance | ₹3.8 L+₹324.03 (0.08%) | L-2 | Rejected-Finance as per TC recommendation |
| 3 | L-3₹3.9 L+₹3,463.65 (0.91%)Rejected-Finance 49 2 3 TALDANGA HOUSING COLONY MUGMA JHARKHAND INDIA | MUGMA | DHANBAD | JHARKHAND | 828202 | ₹3.9 L+₹3,463.65 (0.91%) | L-3 | Rejected-Finance as per TC recommendation |
| Sl No | Description | Qty | Unit | MOBIN ANSARI L2 | jabed khan L1 | BIJENDAR SINGH L3 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 2.00 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 17.96 | cum | 180 ₹3,232.8 | 170 ₹3,053.2 Lowest | 200 ₹3,592 |
| 3.00 | Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by Engineer –in- charge, including compacting each layer by rolling/ ramming and watering , all complete as per drawing and direction of Engineer -in - charge. | 16.7 | cum | 130 ₹2,171 Lowest | 130 ₹2,171 Lowest | 150 ₹2,505 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1.78 | cum | 8,040 ₹14,311.2 Lowest | 8,040 ₹14,311.2 Lowest | 8,200 ₹14,596 |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 3.93 | cum | 4,413 ₹17,343.09 Lowest | 4,413 ₹17,343.09 Lowest | 4,500 ₹17,685 |
| 6.00 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5mm nominal size). | 6.11 | sqm | 200 ₹1,222 Lowest | 200 ₹1,222 Lowest | 210 ₹1,283.1 |
| 7.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). | 4.71 | cum | 7,182 ₹33,827.22 Lowest | 7,182 ₹33,827.22 Lowest | 7,200 ₹33,912 |
| 8.00 | Centring and shuttering including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform. | 25.51 | sqm | 470 ₹11,989.7 Lowest | 470 ₹11,989.7 Lowest | 500 ₹12,755 |
| 9.00 | Centring and shuttering including strutting, propping etc. and removal of form for :Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 15.48 | sqm | 370 ₹5,727.6 Lowest | 370 ₹5,727.6 Lowest | 400 ₹6,192 |
| 10.00 | Centring and shuttering including strutting, propping etc. and removal of form for :Weather shade, Chajjas, corbels etc., including edges. | 6.02 | sqm | 510 ₹3,070.2 Lowest | 510 ₹3,070.2 Lowest | 520 ₹3,130.4 |
Tender Value
₹3.2 L
EMD Value
₹4,100
Closing Date
14 Jan 2020, 5:00 pmClosed
AE (C), Mugma Area
OFFICE OF THE GM, MUGMA AREA
Construction of two nos. transformer room near Shiv temple at Kumardhubi Colliery.
2020_ECL_160636_1
ECL/GM/MA/CE/2019/1403 DT-02.01.2020
Open Tender
Civil Works - Buildings
Item Rate
60 days
OFFICE OF THE GM, MUGMA AREA
Please refer Tender documents.
11 documents required · 11 mandatory
₹4,100
24 Jun 2026
4 Jan 2020
16 Jan 2020
4 Jan 2020
14 Jan 2020
4 Jan 2020
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .