Loading…
Loading…
Tender Value
₹8.3 L
EMD Value
₹8,263
Closing Date
22 Jun 2026, 5:00 pm
Executive Officer, Jajpur Municipality, Jajpur
Executive Officer, Jajpur Municipality, Jajpur
Works
2026_ORULB_131633_3
2272/JM/08.06.2026
Open Tender
Civil Works - Others
60 days
Executive Officer, Jajpur Municipality, Jajpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
Executive Officer, Jajpur Municipality, Jajpur
₹8,263
Yes
11 Jun 2026
11 Jun 2026
25 Jun 2026
11 Jun 2026
22 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Dismentalling of cement concrete including removal of debris within initial lead and lift etc complete | - | cum | 1 | - | BI01010001010000000000000515BI0100001114 |
| 1.02 | Eathwork in excavation in foundation and trenches in hard soil including levelling and dressing the bed etc complete f | 1 | cum | 1 | ₹1 | BI01010001010000000000000515BI0100001115 |
| 1.03 | Supplying and filling Foundation and Plinth with sand including watering and ramming with cost,conveyance,royalities of sand etc complete. | - | cum | - | - | BI01010001010000000000000515BI0100001116 |
| 1.04 | Providing Cement Concrete (1:3:6) using 40mm size BHGCB Metal including cost,conveyance,royalities of all the materials with watering,curing etc complete. | - | cum | - | - | BI01010001010000000000000515BI0100001117 |
| 1.05 | R.C.C. work in M-25 using 20mm and down graded BHGCB chips including hoisting & laying the concrete, watering and curing etc. to required levels laid in layers including cost, conveyance to site , royalty , cess etc. all taxes of all materials & cost of all labour complete but excluding the cost & conveyance & labour charge for cutting , bending, binding etc. of M.S./ T.S. rod required for the RCC Items . | - | cum | 1 | - | BI01010001010000000000000515BI0100001118 |
| 1.06 | Cutting, Straightening coiled or bent up TOR steel, bending, binding, welding and jointing if necessary and tying the grills and placing in position including cost of binding wire 18 to 20 gauge as required for R.C.C. works and providing fan hooks, hoisting, lowering, and laying the grills in floors and others etc. including cost of steel, conveyances, labour, royalties taxes with T & P etc. all complete in all respect as per the Direction of the Engineer in charge | - | qntl | 1 | - | BI01010001010000000000000515BI0100001119 |
| 1.07 | Rigid and smooth Centering and shuttering including dismentalling the false work after casting etc complete. A. drain walls | 1 | cum | - | - | BI01010001010000000000000515BI0100001120 |
| 1.1 | Rigid and smooth Centering and shuttering including dismentalling the false work after casting etc complete. b. Roof slabs | - | sqm | - | - | BI01010001010000000000000515BI0100001123 |
| 1.11 | Disposal of excavated earth by truck load within 5km lead to outside of Municipality area including loading and unloading etc complete | 1 | cum | 1 | ₹1 | BI01010001010000000000000515BI0100001124 |
| 1.12 | Display Board and Photographs | - | no | - | - | BI01010001010000000000000515BI0100001125 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.11 MB
BOQ_595688.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid