Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹5.5 L
EMD Value
₹5,505
Closing Date
27 Nov 2026, 4:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, PH Division, Karimnagar
Near Ujwala Park, Karimnagar
Supply and laying of sewer pipeline from Siddartha High school to Existing open drain near Kolimikunta (v), Choppadandi (M) under DMF funds.
749487
2007/TS/NIT/EEPHKNR/Choppadandi/SewerPipeline/1st call/2026-27, Dt:18-11-2026
OPEN
Civil Works
KARIMNAGAR, TELANGANA
12 documents required · 12 mandatory
₹1,180
₹5,505
18 Nov 2026
18 Nov 2026
19 Nov 2026
90 days
RBR-FNDN-1 - In ordinary soils by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including diversion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by mechanical means. For pipeline trenches upto 3m depth below GL by Mechanical Means
RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means. For pipeline trenches upto 3m depth below GL by manual means where depth is less than 1.5 times the width
RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means. For pipeline trenches upto 3m depth below GL by manual means where depth is less than 1.5 times the width
RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) : (Using Air Compressor and Jack Hammers) : Excavation in Hard Rock in habitant areas where conventional blasting can not be done for Pipe line trenches as per drawings and technical specifications including setting out, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete as directed by the Engineer in charge.
PHE-BHLW-26 : Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches of depths upto 6’-0” (2 Meter) below G.L as directed by the departmental officers Pipe line trenches and main road junctions
BLD-CSTN- 2-8 modified in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) Bedding under RCC pipes
Manufacture, supply, & delivery of (DWC) structured wall polyethylene/polypropylene piping system class SN-8 with non smooth external annular corrugated and smooth internal surface (Double Wall) for non pressure sewage & Drainage application pipes of standard length 6 m, grade conforming to IS 16098 (part-II: 2013) including rubber gasket, transportation to anywhere in Telangana, loading, unloading charges but excluding all taxes etc complete
Supply ,Lowering and laying in ready made trench true to alignment and gradient, jointing, and testing of SWG (Stone Ware Glazed Pipes) including cost of jointing material such as cement mortar (1:1) proportion and spun yarn including cost and conveyance of pipe. (Reference to specifications BIS No. 6530/72). complete as per drawing and/ or as directed by Engineer.
Construction of sewer conical manhole as per type design using Flyash Cement Solid Blocks of size 225x 100 x 60 Cum and brick masonary in CM (1:5) prop; including PCC M10 grade using 20mm graded for bed in foundation and PCC M15 grade concrete using 20mm graded HG metal for benching and channels, inside plastering 20mm thick in single coat of CM (1:3) prop. with Sulphate Resistant Cement; and outside plastering 20mm thick in single coat of CM (1:3) prop with Ordinary Portland Cement; and supporting incoming pipes with concrete block / masonry wherever necessary including finishing the gap with CM (1:3) prop; on both the sides including supply and fixing of manhole frame and cover (HD-20) 560mm dia and Encapsulated Plastic steps including cost and conveyance of all other incidental and operational charges etc., complete as per drawings and specifications and as directed by the Engineer in Charge. Man holes of 0.90m dia and 1.10m depth (1.10m to 1.60m)
0.90m dia manhole up to 1.10m
0.90m dia manhole extra lifts of 0.1m depth up to 1.60m depth
Carting of surplus excavated earth/soils/ rock/ debris or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ - CPD 250 dia Pipeline Kolimikunta.xlsx
TENDER_DOCUMENT • 1.05 MB
Tender Doc CPD 11-2026.doc
TENDER_DOCUMENT • 0.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .