Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | L1 | Accepted-AOC L1 |
Tender Value
Refer Docs
Closing Date
12 Jan 2022, 4:00 pmClosed
Sunilkumar K A
Deputy General Manager (Projects and Planning), FACT (Cochin Division), Ambalamedu Ernakulam
Annual Maintenance Contract (AMC) (2021-22) for 60T Electronic Weighbridge at Phase-II and for 50T Electro-Mechanical Weighbridge at Phase-I, FACT-CD, Ambalamedu.
2021_FACT_664611_1
04028/2021-2022/E24536
Open Tender
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
15 Mar 2022
22 Dec 2021
13 Jan 2022
22 Dec 2021
12 Jan 2022
22 Dec 2021
Annual Maintenance Contract (AMC) (2021-22) for 60T Electronic Weighbridge at Phase-II & for 50T Electro-Mechanical Weighbridge at Phase-I, FACT-CD, Ambalamedu.
CAMC for 60T Electronic Weigh Bridge PH-II Comprehensive Annual Maintenance and Service (AMC) for 60T Electronic weighbridge at Phase II CD. CAMC includes the following works:- Comprehensive Annual Maintenance Contract for 60T Electronic Weighbridge at Phase II, Ambalamedu. The work includes on-call visit/ Breakdown visit/ service visit for routine service / calibration /preventive maintenance of weighbridge throughout the AMC period as per Annexure II –Special Terms and condition of the work.
LIFT UP/DOWN,L/D CELL R&R,P/F ALIGN, WB Lifting-up& Descending down of the Weighbridge Platform for Inspection works/Refurbishment/ Painting etc. The work involves:- i) Lifting of the entire Weighbridge platform using hydraulic jack/lifting tools to a specified height (upto 1m) as needed for any Mechanical inspections underneath the platform structure. The platform then shall be supported on Blocks/Supports provided by FACT. ii) Removal of all Load cells (max 6 numbers) from the Weighbridge after proper disconnections at the Load cell junction Box. iii) After the inspection & subsequent related works by FACT, descending the uplifted Weighbridge platform using hydraulic jack/lifting tools. All load cells to be fixed back along with proper connections at the junction Box and routing through the cable pipes. The platform shall be descended to a level just above all the Load cell corners as required for further final alignments. iv) Performing calibration check, corner test v) Checking/ ensuring normal functionality . After completion, the weighbridge should be handed –over to FACT for stamping.
L&C LMD STAMPING WB 60T PH-2, CD Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the 60T weighbridge at phase-II. Contractor`s scope of work: (i) The scope of work includes minor preparatory works, Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the specified weighbridges. (ii) All the transportation arrangements & related costs incurred shall be borne by the contractor. (iii) The contractor shall meet all the incidental expenses in connection with verification & stamping. (iv) All necessary tools & tackles required for the work. (v) The contractor shall complete the annual re-verification and stamping works before the due dates of Stamping for Electronic Weighbridge at Phase-II area, Ambalamedu (60T). (vi) After the completion of the work, the Contractor shall collect the verification/stamping certificates from the Legal Metrology Department and hand over to FACT, without delay. FACT’s scope of work: (i) The Stamping fees for the Annual re-verification and stamping of the specified Electronic Weighbridges shall be in the scope of FACT.
On-Call maintenance visit for 50T Electro-Mechanical Weighbridge PHI. The Job includes servicing of 50T Electro-Mechanical Weighbridge on demand/ or on breakdown as per Scope of Work and Terms & condition of this contract. as perAnnexure II –Special Terms and condition of the work
L&C LMD STAMPING WB 50T PH-I, CD Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the 50T Electro Mechanical weighbridge at phase-I. Contractor`s scope of work: (vii) The scope of work includes minor preparatory works, Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the specified weighbridges. (viii) All the transportation arrangements & related costs incurred shall be borne by the contractor. (ix) The contractor shall meet all the incidental expenses in connection with verification & stamping. (x) All necessary tools & tackles required for the work. (xi) The contractor shall complete the annual re-verification and stamping works before the due dates of Stamping for Electro Mechanical Weighbridge at Phase-I area, Ambalamedu (50T). (xii) After the completion of the work, the Contractor shall collect the verification/stamping certificates from the Legal Metrology Department and hand over to FACT, without delay. FACT’s scope of work: The Stamping fees for the Annual re-verification and stamping of the specified Electronic Weighbridges shall be in the scope of FACT.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .