Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-AOC VILLAGE DALOG P O NARAIN TEHSIL RAMPUR BUSHAHR DISTT SHIMLA H P | SHIMLA | HIMACHAL PRADESH | 171001 | 1 | Accepted-AOC 1st lowest | |
| 2 | 2₹2.1 L−₹4,910.16 (2.34%)Rejected-Finance | 2 | Rejected-Finance 2nd lowest |
Tender Value
₹2.0 L
EMD Value
₹3,900
Closing Date
23 Jan 2026, 9:00 amClosed
EE Rampur
EE B and R Division HPPWD Rampur
SH C.O PCC V Shape drain at RD 37.870 to 38.300
2026_PWD_126010_1
PW/RMP/TA/2025-10322 dated 14.01.2026
Open Tender
Civil Works - Roads
Percentage
EE B and R Division Rampur
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
Yes
₹3,900
Yes
7 Apr 2026
17 Jan 2026
23 Jan 2026
17 Jan 2026
23 Jan 2026
17 Jan 2026
17 Jan 2026 - 23 Jan 2026
Earth work in excavation for structure in all depth as per drawing and technical specification Clause 305-1 including setting out, construction of shoring and bracin , removal of stumps and other deleterious material and disposal in all lead and lift including dressisng of sides and bottom and back filling in trenches with excavated suitable material . All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out of rock( where blasting is prohibited) as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Providing concrete for plain/reinforced concrete in open foundation complete as per drawing and technical specification clause 802,803,1202 & 1203. P.C.C. M-10 (1) (mechancial mix and vibrated graded crushed stone aggregate) 1:3:6 including carriage of material through all modes of transporation with in all leads and lifts, as per the entire satisfaction and direction of Engineer-in-Charge.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
SBD.pdf
Tender Documents • 2.73 MB
BOQ_185691.xls
BOQ • 1.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .