Loading…
Loading…
Tender Value
₹15.1 L
EMD Value
₹15,140
Closing Date
25 Jun 2026, 4:00 pm
Superintending Engineer, Transmission Circle GETCO Jambuva
Hiring of Petrol / Diesel driven, A.C., SUV/MUV , Nine seater (8+1) and Nine plus seater close body vehicle for 12 Hrs /day for 3000 KM / Month for 24 Months on ARC basis for 132KV Vasedi S/S under Bodeli AM Division under Jambuva Circle.
311378
JTC/26-27/ n-43
Open
Electrical
Vadodara
16 documents required · 16 mandatory
₹1,180
Gujarat Energy Transmission Corporation Limited
₹15,140
4 Jun 2026
4 Jun 2026
4 Jun 2026
25 Jun 2026
4 Jun 2026
company viz. prior to the date of opening of technical bid of the tender, otherwise their bids will not be considered
eligible for technical scrutiny and their technical bids will not be opened.
Sr. Description
1 Tender No. JTC/26-27/ n-43
2 Purchase/Work of Hiring of Petrol / Diesel driven, A.C., SUV/MUV
Nine seater (8+1) and Nine plus seater close body
vehicle for 12 Hrs /day for 3000 KM / Month for
Months on ARC basis for 132KV Vasedi S/S under
Bodeli AM Division under Jambuva Circle.
3 Tender Fee ( non- refundable) Rs. 1,180.00 ( Rs. 1,000.00 + GST as applicable
4 Estimated cost incl. of GST in Rs. Lacs Rs.15,13,386.00
5 Earnest Money Deposit amount in Rs. Rs.
6 On line (E-tendering) Bid / offer submission last 25.06.2026
date up to 16.00 hours only (This is mandatory)
7 Date of opening of Tender fee, EMD and online 25.06.2026
technical bid at 16.10 hours
8 Tentative Date of on – line opening of Price bid, Shall be intimated separately.
9 Prices Firm basis
10 Validity of offer 180 days
11 Time limit 24 Months
1. All tender documents, scanned copies of original (Notarized / self-attested copies of original – as specified in
tender document) documents along with scan copy of transaction slip of payment made through RTGS/NEFT
for Tender Fee & EMD shall be uploaded through on line only (which is mandatory) on (n) procure Portal. No
any physical documents , Demand Draft / Banker’s cheque or Pay order for tender fee and EMD will be
2. Bidder shall have to made payment for Tender fee and EMD though RTGS / NEFT only on or before due date
and time of submission of tender. Tender fee and EMD paid though Demand Draft / Banker’s cheque or
Pay order will not be accepted and no any further communication in the matter will be entertained.
3. It is mandatory for all the bidders to upload their tender documents by on line (E-tendering) in scheduled time.
4. It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF form) remain legible
(readable) and should not be password protected.
5. All the Appendices, forms, formats, declaration, undertaking, etc (To be submitted on bidder’s letterhead),
Tender acceptance letter (on bidder’s letterhead), price bid, tender documents specified in the tender must be
submitted through online on n-procure portal (mandatory) (All the documents to be duly self attested by the
bidder). For any differences or wrong entry bidder shall be sole responsible for that documents.
6. Tender will be evaluated on the basis of Data / Details / Documents submitted by the bidders though online offer
7. The bidders are required to upload complete technical bid duly filled, sealed & signed by bidder ( all the
appendices (annexure)/forms etc). This is intended for transparency and speedy evaluation of the bids. Instead
of simply confirming/attached in bid/refer physical offer, the bidder shall fill in the particulars against appropriate
place in respect of each line appearing in Technical bid (In the absence of required details in uploaded tender
Seal & Signature of Bidder
documents, technical bid , the purchaser has every right to evaluate the bids accordingly and bidder cannot
raise any objection against any point during evaluation).
8. In case of short submission of documents with bid and / or clarification if any required from the bidder,the required
details / documents may be asked from the bidder in physical form.
9. Payment of Tender Fee and Earnest Money Deposit (EMD ) : The EMD and Tender fee plus GST as
applicable shall be paid through RTGS/NEFT only .
1) Payment of Tender fee , EMD through RTGS/NEFT : For the payment through RTGS/NEFT the scan copy
of payment made (transaction slip of payment made) shall be uploaded online with the Tender documents
on n-procure portal.
2) Bidder has to provide following detail on the same date of payment made so that receipt can be generated
at below mentioned e-mail ids:
Sr. No. Required Details
1 Name & Postal Address of the bidder
2 Contact Detail & e-mail id of the bidder
3 Tender No. with due date
4 Mode of Payment made
5 Ref. ID with Bank Details(UTR number)
6 Amount Paid for Tender fee in Rs.
7 Amount Paid for EMD in Rs.
8 GST Registration No.
3) GETCO Beneficiary Bank Details are as under:
Sr.No. Particulars Requisite Details
1 Name of Bank BANK OF BARODA
2 Name of Branch MAKARPURA VILLAGE BRANCH, VADODARA
5 IFSC Code BARB0MAKARP
6 Name of Account GETCO , JAMBUVA
8 GST No. 24AABCG4029R2ZC
10. Tender fee and EMD paid though Demand Draft / Banker’s cheque or Pay order will not be accepted.
Also, Tender fee and EMD received after due date and time as specified in the tender will not be
accepted/opened irrespective of delay due to any reasons and the Corporation shall not assume any
responsibility for late receipt of the same.
11. Tender without EMD and tender fee plus GST as applicable shall be rejected.
12. Bidders are requested to remain in touch with the n-procure portal for any amendment/corrigendum or
extension of due date etc.
13. The GETCO reserves the right to award the work to one or more bidders, considering their technical and
financial capacity OR to reject any or all tenders or accept any tender without assigning any reason thereof.
Any technical questions, information and clarification that may be required pertaining to this enquiry should be
referred to: The Superintending Engineer (TR), Gujarat Energy Transmission Corporation Limited, Circle office
GETCO reserves the right to reject any OR all tenders without assigning any reasons thereof.
Yours faithfully,
Superintending Engineer (TR)
C.O., GETCO, Jambuva
To view the PDF file please use “Acrobat Reader” software which can be downloaded from “Adobe” website
In case bidder needs any difficulty in accessing / submission of on line bid / clarification or if training
required for participating in online tender, they can contact the following office: (n) Procure Cell, (n)
code solutions-A division of GNFC Ltd., 403, GNFC Info tower, S.G. Road, Bodakdev Ahmedabad –380054
Email: [email protected]
Seal & Signature of Bidder
Seal & Signature of Bidder
(A) INSTRUCTIONS TO THE BIDDERS
A. INTRODUCTION
1.0 General Particulars
1.1 The Gujarat Energy Transmission Corporation Ltd., Jambuva hereinafter called ‘GETCO’/ ‘OWNER’
intends to receive bids for Hiring of Petrol / Diesel driven, A.C., SUV/MUV , Nine seater (8+1) and Nine
plus seater close body vehicle for 12 Hrs /day for 3000 KM / Month for 24 Months on ARC basis for
132KV Vasedi S/S under Bodeli AM Division under Jambuva Circle as detailed in the accompanying
specifications in accordance with Terms and Conditions herein. The bids shall be prepared and
furnished as per these Instructions.
2.0 Bidding Costs
All costs/expenses in the preparation and submission of the Bid (including any post Bid
discussions/presentations) shall be fully borne by the Bidder. Owner will not be responsible/liable for
these costs irrespective of the course and conclusion of this Bidding.
3.0 BID DOCUMENTS
Details of Documents
The following Bid documents apart from Invitation to Bid detail the material and equipment
specifications/characteristics, the bidding procedures and the terms & conditions of contract:
a. Instructions to Bidders (ITB-Part I)
b. General Conditions of Contract (GCC-Part I)
c. Special Conditions of Contract (SCC-Part I)
e. SPECIAL TERMS AND CONDITIONS
4.0 Knowing the Bid Documents
4.1 Every intending Bidder is to examine and understand all instructions, forms, terms, conditions and
specifications in the Bid Documents and fully know himself all the conditions and contents therein, which
may in any manner, affect the scope & content of work and the costs thereof. Submission of a Bid not
substantially responsive to the Bid Document in all respects and/or failure to furnish all information
required by the Bid Document may entail rejection of the Bid at the Bidder’s risk.
5.0 Clarifications on Bid Documents
5.1 In case an intending Bidder finds any discrepancy or omission in the documents and specifications or
is in doubt as to the true meaning of any part, he shall make a request, in writing not later than the date
of pre Bid discussion, to the owner in triplicate. The owner will issue explanations, interpretations and
clarifications as deemed fit in writing as a response to this request. On receipt of such
interpretations/clarifications, the Bidder may submit his Bid within the date and time stipulated in the Bid
invitation, All such explanations, interpretations and clarifications from the Owner shall be deemed as
part of Bid Documents and shall invariably accompany the Bidder’s proposal.
5.2 Any verbal/telephonic clarifications and information given by the Owner or his employee (s) or his
representative(s) will not in any way be binding on the Owner.
6.0 Amendment of bidding document:
6.1 At any time prior to the deadline for submission of Bids the Owner may, for any reason, whether at his
own initiative or in response to a clarification requested by the intending Bidder, modify the Bidding
Document with amendment(s).
6.2 The amendment will be notified in writing or Fax /web site to all intending Bidders who have received
the Bidding Document at the address contained in the letter of request for issue of Bidding document
from the Bidders. Owner will bear no responsibility or liability arising out of non-receipt of the same in
time or otherwise.
6.3 In order to afford prospective bidders reasonable time in which to take the amendment into account in
preparing their bids, the Owner may, at his discretion, extend the deadline for the submission of bids.
6.4 Such amendments, clarifications etc. shall be binding on bidders and will be given due consideration by
the Bidders while they submit their bids and shall invariably enclose such documents as a part of the
7.0 PREPARATION OF BIDS
7.1 Language of Bid:
Seal & Signature of Bidder
The Bid prepared by the Bidder and all correspondence and documents relating to the Bid, exchanged
by the Bidder and the Owner, shall be written in the English language, provided that any printed literature
furnished by the Bidder may be written in another language so long as accompanied by an English
translation of its pertinent passages. Failure to comply with this may disqualify a bid. For purposes of
interpretation of the bid, the English translation shall govern.
Bidders have to make the Bid in the formats furnished with this Document. Verbatim without adding any
printed/typewritten text of their own.
8.0 Local Conditions:
8.1 It will be imperative on each Bidder to fully inform himself of all local conditions and factors, which may
have any effect on the execution of the Contract covered under these documents and specifications.
The Owner shall not entertain any request for clarifications from the bidders, regarding such local
8.2 It must be understood and agreed that such factors have properly been investigated and considered
while submitting the proposals. No claim for financial adjustment to the Contract awarded under these
specifications and documents will be entertained by the owner. Neither any change in the time schedule
of the Contract nor any financial adjustments arising thereof shall be permitted by the Owner, which are
based on the lack of such clear information or its effect on the cost of the works to the Bidder.
9.0 Documents comprising the Bid:
furnished in the Bidding Documents, indicating, for the services to be rendered, a brief description of
services, quantity and price.
9.2 All tender documents, scanned copies of original (Notarized / self-attested copies of original –
as specified in tender document) documents along with scanned copy of original document for
Tender Fee & EMD shall be uploaded through on line only (which is mandatory) on (n) procure
Portal to establish that the Bidder meets the Qualification Requirements as detailed in
ANNEXURE -I. No physical documents to be submitted by the bidder
9.3 Complete technical bid / Tender Documents / formats are to be filled in all respects. Same shall
be sealed and signed by the Company Authorized Signatory wherever specified and scanned
copies of original (Notarized / self-attested copies of original – as specified in tender document)
documents along with scanned copy of original document shall be uploaded through on line
only (which is mandatory) on (n) procure Portal.
9.4 Bidder shall have to made payment for Tender fee and EMD though RTGS / NEFT only on or before
due date and time of submission of tender. Tender fee and EMD paid though Demand Draft / Banker’s
cheque or Pay order will not be accepted and no any further communication in the matter will be
9.5 In case of short submission of documents with bid & / or clarification if any required from the bidder, the
required details/ documents may be asked from bidder in physical form.
9.6 It shall be sole responsibility of the bidder that the uploaded scanned documents ( in PDF form) remain
legible & should not be password protected.
9.7 Bidder shall have to upload scanned copies of complete technical bid filled in all respect and
sealed and signed by Company Authorized Signatory through on line only (which is mandatory)
on (n) procure Portal
10.0 Bid Price:
10.1 The Bidder shall indicate percentage above/below of total bid price indicated in the appropriate price
Schedules, enclosed in bid proposal sheets for erection, testing and commissioning, and other
services it proposes to furnish under the contract. The % age above/below indicated shall be inclusive
of all taxes and duties applicable inclusive of GST applicable on required inputs and services.
10.2 The Bidder shall specifically note that the Tenders are invited on percentage rate increase/decrease
11.0 Price Basis:
11.1 The Price shall be quoted on firm basis.
11.2 The Price quoted by the bidder shall remain fixed during the bidder's performance of the contract and
shall not be subject to variation on any account save for change in quantity. A bid submitted with an
adjustable price quotation shall be treated as non-responsive and rejected.
12.0 Taxes and Duties:
12.1 Goods and Service Tax (GST):
(i) Contractor has to submit the GST Registration certificate.
Seal & Signature of Bidder
(ii) Contractor should be registered under GST laws
(iii) Any change in Tax applicability on this service will also apply to this tender.
(iv) At present GETCO adopts RCM (i.e. reverse charge mechanism) for the vehicle hiring service. So
GETCO is paying the GST @5% under RCM to the Government department. So, service provider has
not to pay GST in any case except service provider is body corporate ( i.e. any person other than a
private company, public company, one personal company, small company, Limited Liability Partnership,
foreign company etc.).If service provided by body corporate than GST will be paid by service provider.
(v) The Contractor has to submit invoice to GETCO indicating following.
Name, address and GST registration no. of the service provider
Name and address of person receiving the service i.e. GETCO
Description and value of service provided
Contractor has to also supply tax invoice as described under GST rules and Regulation indicating
12.2 In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the provision of
GUVNL’s statutory variation clause shall apply.
12.3 GST, other taxes and other levies and duties including custom duty solely in respect of the transaction
between the owner and the contractor under this contract, if any, shall be included in the bid price. These
shall also be indicated separately wherever applicable as mentioned in the Tender.
12.4 Notwithstanding the tax liabilities as per the sub-clause 12.1 above the owner shall have the right to
make deduction at source from the amounts payable to the contractor in respect of Income Tax (on the
cost of items of supply included in the works contract) as may be mandatory in terms of the law. The
owner shall not bear any liability in this regard but shall issue necessary certificate in respect of such
deduction made.
12.5 In case any tax or duty is newly introduced by the Government applicable for this contract with effect
from the next day of the date submission of the bid and if the contractor is required to pay additional tax
or duty, then the owner shall reimburse the contractor the additional tax or duty so paid by the contractor
against submission by the contractor of documentary evidence to the satisfaction of the owner. This
provision will not be applicable to transaction between the contractor and his sub-contractors and will
be applicable only to the direct transaction between the contractors and owner. Besides the said
statutory variation, no other statutory variation shall be payable by the owner.
12.6 If the cost to the Contractor during the performance of the ‘Contract’ shall be increased or reduced by
reasons of the making, passing or promulgation of any law after the date of submission of bid or by any
order, regulation or bye-law having the force of law the amount of such increase or reduction shall be
added to or deducted from the “Contract Price” as the case may be for direct transactions between
contactor & owner, and not for bought out items. It is the Bidders responsibility to furnish details of taxes,
duties, levies etc. applicable as on the date of submission of the bid.
12.7 No claim for any increase towards the statutory variation regarding enhancement of existing tax or duty
or introduction of a new tax or duty applicable shall be entertained by the Owner during the extended
period of contract, if any, provided the extension of the contract is required by causes attributable to the
12.8 The provision of statutory variation regarding enhancement of existing tax or duty or introduction of a
new tax or duty will be applicable only to the direct transaction between the contractor and the owner.
12.9 Before quoting, the bidder may ascertain from the concerned tax authorities of Government of Gujarat
the applicability of Entry Tax, GST in respect of this work and include the same in the quoted price. The
Owner in this regard will entertain no separate claim, as it is the responsibility of the Bidder to pay all
12.10 In addition, the conditions detailed under Special Conditions of Contract shall apply.
13.0 Time Schedule:
13.1 The basic consideration and the essence of the contract shall be strict adherence to the time schedule
for performing the specified works.
13.2 The Owner’s requirements of completion schedule for the Works are mentioned in the accompanying
Special Conditions of Contract.
13.3 The completion schedule as stated in the special conditions of contract shall be one of the major factors
in consideration of the bids.
13.4 The owner reserves the right to request for a change in the work schedule during pre- award discussions
with successful bidder.
14.0 Insurance:
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in Clauses titled
Insurance, in SPECIAL TERMS AND CONDITIONS of Contract. Bidder’s attention is specifically invited
to these clauses. Bid price shall include all the costs in fulfilling all the insurance liabilities under the
Seal & Signature of Bidder
15.0 Bid Security/EMD:
15.1 The bidder shall furnish, as a part of its bid EMD, bid security for an amount of one percent of estimated
cost to be paid as under:
a) Payment of Earnest Money Deposit ( EMD ) can be accepted by RTGS/ NEFT.
1. In case of payment through RTGS/NEFT the scan copy of payment made (transaction slip of
payment made) shall be uploaded online with the Tender documents on n-procure portal.
2. Bidder has to provide following detail on the same date of payment made so that receipt can be
generated at below mentioned e-mail ids:
Sr. Required Details
1 Name & Postal Address of the bidder
2 Contact Detail & e-mail id of the bidder
3 Tender No. with due date
4 Mode of Payment made
5 Ref. ID with Bank Details(UTR number)
6 Amount Paid for Tender fee in Rs.
7 Amount Paid for EMD in Rs.
3. GETCO Beneficiary Bank Details are as under:
Sr.No. Particulars Requisite Details
1 Name of Bank BANK OF BARODA
2 Name of Branch MAKARPURA VILLAGE BRANCH, VADODARA
5 IFSC Code BARB0MAKARP
6 Name of Account GETCO , JAMBUVA
8 GST No. 24AABCG4029R2ZC
15.2 The offer should be valid for a minimum period of 180 days from the date of opening of technical bid.
15.3 The bid security is required to protect the owner against the risk of Bidder’s conduct, which would
warrant the guarantee forfeiture, pursuant to relevant paras elsewhere The bid guarantee shall be made
payable to the Owner without any condition whatsoever.
15.4 The Owner as non-responsive will reject any bid not secured in accordance with Para 18.1 above. No
exemptions are made in the furnishing of the security.
15.5 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of tender or three
months from the date of submission of tender whichever is later.
15.6 The successful bidders, Bid Security will be discharged upon, furnishing the contract performance
15.7 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the bidder on the bid
b) If a bidder refuses to accept the contract or fails to commence the works including supplies
within thirty days of letter of award of contract)
15.8 If successful bidder fails to furnish the Security deposit to execute the contract for the work
offered to him, his EMD shall be forfeited.
16.0 Format of Bid:
16.1 The Bidder shall prepare in Single Copy of the bid, clearly marking each “Technical Bid” as appropriate.
16.2 The bid shall be typed or written in indelible ink and shall be signed by the Bidder or a person or persons
duly authorized by the Bidder to sign the Contract. The letter of authorization shall be indicated by written
power-of-attorney accompanying the bid. All pages of the bid, except for un-amended printed literature,
shall be initiated by the person or persons signing the bid.
16.3 Complete technical bid / all Tender Documents / formats are to be filled in all respects. Same shall be
sealed and signed by the Company Authorized Signatory wherever specified and scanned copies of
original (Notarized / self-attested copies of original – as specified in tender document) documents along
with scanned copy of original document shall be uploaded through on line only (which is mandatory) on
(n) procure Portal. No physical documents to be submitted by the bidder
Seal & Signature of Bidder
16.4 The bid shall contain no interlineations, erasures or overwriting except as necessary to correct errors
made by the Bidder, in which case such corrections shall be initiated by the person or persons signing
16.5 Complete Technical Bid, Tender documents as per QR ,Price Bid and transcation slip for
payment made for tender fee & EMD through RTGS / NEFT ,shall be submitted ‘online’ only.
17.0 Signature of Bids:
17.1 The bid must contain the name, residence and place of business of the person or persons making the
bid and must be signed and sealed by the Bidder with his usual signature. The names of all persons
signing should also be typed or printed below the signature.
17.2 Bid by a partnership must be furnished with full names of all partners and be signed with the partnership
name, followed by the signature(s) and designation(s) or the authorized partner(s) or other authorized
representative(s).
17.3 Bids by Corporation/Company must be signed with the legal name of the Corporation/Company by the
President/Managing Director or by the Secretary or other person or persons authorized to bid on behalf
of such Corporation/Company in the matter.
17.4 A bid by a person who affixes to his signature the word ‘President’, ‘Managing Director’, ‘Secretary’,
‘Agent’ or other designation without disclosing his Principal will be rejected.
17.5 If it is found that two or more persons who are connected with one another either financially or as a
principal and agent have bid under different names without disclosing their connection then such bids
will be liable for rejection. Satisfactory evidence of authority of the person signing on behalf of the Bidder
shall be furnished with the bid.
17.6 The Bidder’s name stated on the proposal shall be the exact legal name of the firm.
17.7 Bids not conforming to the above requirements of signing may be disqualified and EMD forfeited.
18.0 Sealing and marking of bids:
18.1 Complete Technical Bid, Tender documents as per QR ,Price Bid and transaction slip for
payment made for tender fee & EMD through RTGS / NEFT ,shall be submitted ‘online’ only.
Telegraphic/Telex/Fax/e-mail/physical bids shall not be entertained.
18.2 The Technical Bid and accompanying documents, RTGS/ NEFT transaction slip for payment made for
tender fee and EMD shall be uploaded ( scanned copies of original document ) through on line only
(which is mandatory) on (n) procure Portal by the bidder.
18.3 Address of the Owner is as under :
The Superintending Engineer
GETCO, Circle Office,
220kv Jambuva sub-station compound.
NH -8, Jambuva PIN CODE-
19.0 Deadline for submission of bids:
19.1 The Bidders have the option of sending the EMD/ Tender fee cover by registered post or Speed post.
Bids submitted by telex/telegram will not be accepted. No request from any Bidder to the Owner to
collect the proposals from airlines, cargo agent etc. shall be entertained by the Owner.
19.2 Above cover must be received by the Owner at the address specified under Para 18.3, not later than
the time & date mentioned in the Invitation to Bid.
19.3 The Owner may, at its discretion, extend this deadline for the submission of bids by amending the
Bidding Document in which case all rights and obligations on the Owner and Bidders previously subject
to the deadline will thereafter be subject to the deadline as extended.
20.1 Any bid received by the Owner after the time and date fixed or extended for submission of bids
prescribed by the Owner, will be rejected and not considered for evaluation.
21.0 Modification and withdrawal of bids:
21.1 The Bidder may modify or withdraw its bid after the bid’s submission provided that written notice of the
modification or withdrawal is received by the Owner prior to the deadline prescribed for submission of
21.2 The Bidder’s modification or withdrawal notice shall be prepared, sealed, marked and dispatched in
accordance with the provisions of clause 18.0. The envelope should clearly indicate whether the
modification is for the Technical bid or the Price bid. No bid modifications notice by Telex/Grams/Fax
shall be entertained by the Owner.
21.3 No bid shall be modified in any manner, whatsoever subsequent to the deadline for submission of bids.
Seal & Signature of Bidder
21.4 No bid may be withdrawn in the interval between the deadline for submission of bids and the expiration
of the period of bid validity specified by the Bidder on the Bid Form. Withdrawal/modification of a bid
during this interval may result in the Bidder’s forfeiture of its bid security.
22.0 Information required with the proposal:
22.1 The bids must clearly indicate the name of the manufacturer, the type and/or model of vehicle proposed
to be provided.
22.2 The above information shall be provided by the Bidder in the form of separate sheets, photographs,
catalogues, etc.
22.3 Any bid not containing sufficient descriptive material to describe accurately the vehicle proposed may
be treated as incomplete and hence rejected.
22.4 Oral statements made by the Bidder at any time regarding quality, quantity or arrangement of the vehicle
or any other matter will not be considered.
22.5 Standard catalogue pages and other documents of the Bidder may be used in the bid to provide
additional information and data as deemed necessary by the Bidder.
22.6 In case the ‘Proposal’ information contradicts specification requirements, the specification requirements
will govern, unless otherwise brought out clearly in the technical commercial deviation schedule.
23.0 BID OPENING AND EVALUATION
Opening of bids by owner:
23.1 The Owner will open the technical bids & Cover – I in the presence of Bidder’s representatives who
choose to attend on the date and time mentioned for opening of bids in the Invitation to Bid or in case
any extension has been given thereto, on the extended bid opening date and time notified to all the
Bidders who have purchased the bidding document. The Bidder’s representatives who are present shall
sign a register evidencing their attendance.
23.2 The Bidder’s names, Technical modifications, bid withdrawal and such other details as the Owner, at
his discretion may consider appropriate, will be announced in the Technical Bid Opening.
23.3 Technical bid and Price bid will be open ‘online’ only through n-code.
24.0 Purpose of evaluation of bids:
24.1 The Bids received/accepted/opened will be evaluated by the Owner to ascertain the technical
responsiveness of the bid for the complete scope of the proposal, as covered under these specifications
and documents. All technically responsive bids shall then be examined to determine the LOWEST
EVALUATED COMMERCIALLY AND TECHNICALLY RESPONSIVE BIDS.
25 ( A) Policy for bids under consideration:
25.A.1 Bids shall be deemed to be under consideration immediately after opening of Technical Bid and until
such time official intimation of award/rejection is made by the Owner to the Bidders. While the Bids are
under consideration, Bidders and/or their representatives and other interested parties are advised to
refrain from contacting by any means, the owner and/or his employee’s representatives on the matters
related to Bids under consideration.
25.A.2 Clarification of bids:
To assist in the examination evaluation and comparison of Bids the owner may on his own ask the
Bidder for a clarification of its bid. The request for clarification and the response shall be in writing and
no change in the price or substance of the bid shall be sought, offered or permitted.
26.0 Preliminary Examination:
26.1 The Owner will examine the bids to determine whether they are complete, whether any computational
errors have been made, whether required sureties have been furnished, whether the documents have
been properly signed, and whether the bids are generally in order.
26.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and the total price that is obtained by multiplying the unit
price and quantity, the unit price shall prevail and the total price shall be corrected. If there is a
discrepancy between the total bid amount and the sum of total costs, the latter shall prevail and the total
bid amount will be corrected accordingly. If there is a discrepancy between words and figures, the
amount advantageous to the Owner will prevail. If the Bidder does not accept the correction of the errors
as above, his Bid will be rejected and the amount of Bid Security will be forfeited. The Bidder should
of any inconsistency in the prices furnished in the specified prices schedules to be identified in Bid Form
for this purpose, the Owner shall be entitled to consider the highest price for the purpose of evaluation
and for the purpose of award of Contract use the lowest of the prices in these schedules.
Seal & Signature of Bidder
26.3 Prior to the detailed evaluation, the Owner will determine the substantial responsiveness of each bid to
the Bidding Document. For purpose of these Clauses, a substantially responsive bid is one which
conforms to all the terms and conditions of the Bidding Document without material deviations. A material
deviation is one which affects in any way the prices, quality, quantity or delivery period of the equipment,
completion of works or which limits in any way the responsibilities or liabilities of the Bidder of any right
of the Owner as required in these specifications and documents. The Owner’s determination of a bid’s
responsiveness shall be based on the contents of the bid itself without recourse to extrinsic evidence.
26.4 A bid determined as not substantially responsive will be rejected by the Owner and may not
subsequently be made responsive by the Bidder by correction of non-conformity.
26.5 The Owner may waive any minor informality or non-conformity or irregularity in a bid which does not
constitute a material deviation, provided such waiver does not prejudice or affect the relative ranking of
27.0 Evaluation of Price Bids:
27.1 Definitions and Meanings:i
For the purpose of the evaluation and comparison of bids, the following meanings and definition will
a) ‘Bid Price’ shall mean the price quoted by each Bidder in his proposal for the complete scope of
b) ‘Evaluated Bid Price’ shall be summation of ‘Bid Price’, ‘Differential Price’ and ‘Cost Compensation
for Deviations.’
28.0 Calculation of differential Price & Cost Compensation for Deviations.
The Differential Price to be added to the Bid Price of each bid during evaluation and comparison shall
be derived as under:
Differential Price (DP)=n1F1+n2F2…+nn Fn, where F1, F2…Fn are the various factors in Indian Rupees
per unit of parameter differential or deficiency in the equipment and services offered as stipulated in
these specifications: n1, n2…nn are the respective parameter differential or deficiency in the
corresponding units to be determined from the Bidder’s proposal. The above factors and corresponding
units of parameter differential are derived from the Technical Specifications, Data sheets and/or Special
Conditions of Contract.
Deviations from the Bidding Documents in so far as practicable will be converted to a Rupee value (D)
and from the Bidding Document while evaluating the bids. In determining the Rupee value of the
deviations the Owner will use parameters consistent with those specified in the specifications and
documents and or other information as necessary and available to the Owner.
28.1 Comparison of Bids
The bids shall be compared on the basis of lumpsum prices (i.e., for erection services to be rendered
as quoted by the Bidder) for the entire scope of the proposal as defined in the Bidding Document.
For comparison purposes all the evaluated bid prices shall be in Indian Rupees as under:
W = Total Comparison Price
Q = Bid Price quoted by the bidder in Indian Rupees (Value of erection cost including other components
DP = Different price in Indian Rupees calculated as above
D = Cost compensation for deviations calculated as above.
All evaluated bid prices of all the bidders shall be compared among themselves to determine the lowest
evaluated bid and, as a result of this comparison, the lowest bid will be selected for the award of the Contract.
29.0 AWARD OF CONTRACT
29.1 The owner will award the contract to the successful Bidder, whose bid has been determined to be
substantially responsive and has been determined as the lowest evaluated bid, providing further that
the Bidder is determined to be qualified to perform the contract satisfactorily. The Owner shall be the
sole judge in this regard.
30.0 Owner’s right to accept any bid and to reject any or all bids:
Seal & Signature of Bidder
30.1 The Owner reserves the right to accept or reject any bid, and to annual the bidding process and reject
all bids at time prior to award of contract, any without thereby incurring any liability to the affected Bidder
or Bidders or any obligation to inform the affected Bidder or Bidders of the grounds for the Owner’s
31.0 Notification of award:
31.1 Prior to the expiration of the period of bid validity and extended validity period, if any, the Owner will
notify the successful Bidder in writing by registered letter or cable or telex or FAX, to be confirmed in
writing by registered letter, that its bid has been accepted.
31.2 The notification of award will constitute the formation of the Contract.
31.3 Upon the successful Bidder’s furnishing of performance guarantee pursuant to relevant clause 8.0, the
Owner will promptly notify each unsuccessful Bidder and will discharge its bid security, pursuant to
32.0 Signing of contract:
32.1 At the same time as the Owner notifies the successful Bidder that his bid has been accepted, the Owner
will send the Bidder the detailed of Award, incorporating all agreements between the parties.
32.2 Within 15 days of receipt of the detailed of Award, the successful bidder shall sign the same with date
and return it to the Owner.
32.3 The Bidder will prepare the Contract Agreement as per the Performa prescribed and the same will be
signed within 30 (Thirty) days of notification of Award.
33.0 Scope of the proposal
33.1 The Scope of the proposal shall be on the basis of a single Bidder’s responsibility Hiring of Petrol
/ Diesel driven, A.C.,09 Seater (8+1)and Nine plus seater close body vehicle for 12 Hrs /day for
3000 KMs / month for 24 Months on ARC basis for 132 KV Vasedi S/s under Bodeli AM Division
under Jambuva Circle. completely covering as per required specification.
For participation in tender, the ownership of vehicle is not necessary. Contractor can provide third party’s
vehicle. In such case, bidder shall have to execute the agreement binding that the whole responsibility
about any risks shall pertain to him & not to third party. The format of same is enclosed h/w.The provided
third party vehicle shall be same throughout the contract period. In special case, only one time change
of vehicle shall be allowed, meeting all the terms of contract & on taking prior approval of competent
authority.Failing to provide vehicle as per offer and required documents and proof, EMD / SD paid by
the contractor shall be forfeited.
33.2 This tender is for hiring of petrol/diesel driven vehicle for subjected work. The GETCO is state
transmission utility. The function of the organization is to supply quality and uninterrupted power.
Maintain an efficient power transmission system. As a part of that, Contractor has to allow carrying tools,
tackles, material, testing kit etc. in vehicle along with the staff as per E.I.C. and instruct driver to act
accordingly.It will be the responsibility of the contractor to ensure tools, tackles, torch and First-Aid Kit
to be made available in vehicle.
33.3 Head quarter of vehicle will be considered at 132KV Manjusar S/s and journey kilometers will be
considered from Head-Quarters to Head-Quarters.
33.4 No deviation whatsoever to certain conditions of the bidding documents permitted by the Owner and
therefore, the Bidders are advised that while making Bid Proposals and quoting prices these conditions
may appropriately be taken into consideration. Bidders are required to furnish a certificate in this regard
as per the format provided in Annexure, which shall accompany the Technical Bid. Any Bid not
accompanied by such certificate shall be rejected by the Owner.
33.5 Bids not covering the above cited entire scope of works may be treated as incomplete and
hence rejected.
33.6 The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets and specified
elsewhere. The Qualifying Data should be filled in the required schedule of Bid Proposal Sheets.
Seal & Signature of Bidder
(QUALIFICATION REQUIREMENTS)
To be qualified for award, the bidder shall provide following satisfactory evidence to the Owner of his
capability and adequacy of resources:
SR. Documents A.C.,09 Seater (8+1) and Nine plus seater
NO. ,SUV / MUV close body vehicle
A Detail of offered registered vehicle
Note : - Vehicle to be offered shall not have been registered before 03 years as on the date
of tender opening
1 Vehicle Registration No. / Date of registration
2 Vehicle Make & Model name
3 Vehicle Class
4 Type of vehicle
5 Seating Capacity
6 Copy of Certificate of registration ( R.C Book)
7 Copy of the insurance policy
8 Copy of Fitness certificate
9 Copy of Road permit / Contract carriage permit
10 Copy of Road Tax paid
11 Vehicle owner’s name
12 In case of providing third party’s vehicle –
Submit UNDERTAKING CUM INDEMNITY
BOND (Non Judicial Stamp Paper of Rs. 300/-
) as per enclosed Format
14 Bidder who offering registered vehicle shall
have to submit Certificate on firms’ letter head
regarding offered vehicle is not provided at any
location of GETCO or any other firm against
any work order on the date of opening of
tender and thereafter, as per enclosed Format
B Detail of offered New vehicle – As per Tender specification
1 Quotation for New vehicle to be offered as per
vehicle specification
2 Vehicle Make & Model name
3 Seating Capacity
4 RTGS / NEFT for Rs.5000/- on account of
deposit for New vehicle in favor of GETCO
payable at Vadodara
Note : Successful bidder shall have to submit
vehicle documents on registration of vehicle.
Rs. 5,000/- deposited against New vehicle will
Seal & Signature of Bidder
be refunded only after verification of original
vehicle documents. If he fails to produce
document for new vehicle, deposit of
Rs.5,000/- paid as above will be forfeited.
C Additional Documents
1 Payment of Tender fee and EMD through
RTGS/ NEFT only
2 Govt. Approved petrol /diesel price Bill / list (
Bidder must quote prices on the basis of
prevailing 15 days before the due date of
tender. This basic rate shall be indicated in the
3 GST registration certificate. (Certificate of
Provisional GST registration shall not be
4 Copy of PAN card
5 P.F. Registration (for engaging of driver) or
self-declaration undertaking on stamp paper of
Rs.50/- in case of self-driving with Notarize
certificate as per enclosed format.
6 Details of Proprietorship / Partners/Directors of
the Firm/Company. Partnership deed, MOA,
BR, if applicable.
Note:- Complete Technical bid ,all tender documents (Scan copy of notarized/self-attested as per
tender specification) to be submitted on line only (which is mandatory) on (n) procure
Portal.No physical documents to be submitted by the bidder
1. The above-cited requirements are only indicative. The owner reserves the right to requisition any
other relevant information and also reserves the right to reject the Bid proposal of any Bidder, if in
the Owner’s opinion the Qualification data is incomplete and Bidder is not qualified to perform the
Contract satisfactorily
2. The contractor bidding for the work may have vehicle registered on either proprietor name / firm’s
name/ third party’s vehicle ( In case of providing third party’s vehicle bidder shall have to submit
UNDERTAKING CUM INDEMNITY BOND (Non Judicial Stamp Paper of Rs. 300/- ) as per
enclosed Format
3. In case of bidder offering new vehicle, Bidder shall have to submit Deposit for Rs.5000/ per vehicle‐
by RTGS on account of new vehicle to qualify in tender
4. Bidder shall have to offer Registered / New vehicle as per Tender’s specification.
5. Bidder should not offer vehicle which is already providing services at any other location of GETCO
or DISCOM or any other private / Govt. institution having due date of completion for providing
service on or after date of opening of Tender (i.e. the due date of completion of on hand work order
of offered vehicle shall be completed before date of opening of tender).
For that bidder should have to give undertaking stating that offered vehicle is not engaged in any
work contract awarded to them by GETCO or DISCOM or any other private / Govt. institution on
the date of opening of tender as per attached PERFORMA. If any discrepancy observed in this
regards i.e. running vehicle is offered by bidder same will be rejected & no any correspondence
will be entertained.
6. Bidder should not offer the same vehicle in two or more tender published by this office at the same
time. Also, the vehicle which is offered in any tender shall not be offered in another tender till
opening of price bid of subjected Tender in which vehicle is already offered. However, in that case
GETCO reserves right to consider the same in any one of the tender for further evaluation and for
other tenders bidder will be considered as dis-qualified & no any correspondence in this regards
7. It will be the responsibility of the contractor to ensure tools, tackles, torch and First-Aid Kit , mobile
charging facility to be made available in vehicle.
8. On receipt of the work contract,successful bidder shall have to submit driving license,
Medical fitness certificate (physical fitness), Eye test ( Colour vision) of driver engaged for
subjected work and all vehicle documents to respective S/S In charge and Division office.
9. Successful bidder has to submit all vehicle documents to Jambuva Circle Office also.
Seal & Signature of Bidder
10. Hired vehicle shall be fitted with airbag for the person occupying the front seat, other than
11. Vehicle shall be equipped with fire extinguisher, mobile charging facility
GENERAL TERMS AND CONDITIONS OF CONTRACT
A. INTRODUCTION
1.0 DEFINITION OF TERMS
1.1 The ‘Contract’ means the agreement entered into between the Owner and the Contractor as per the
Contract Agreement signed by the parties, including all attachments and appendices thereto and all
documents incorporated by reference therein.
1.2 ‘Owner’ shall mean the Gujarat Energy Transmission Corporation Ltd, Vadodara or any of its group
companies. I.e. GUVNL,GSECL, MGVCL, DGVCL, PGVCL, UGVCL and shall include its legal
representatives, successors and assigns.
1.3 ‘Contractor’ shall mean the Bidder whose bid is accepted by the Owner for the award of the Works and
shall include such successful Bidder’s legal representatives, successors and permitted assigns.
1.4 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as Engineer from time to time
for the purpose of the Contract.
1.5 ‘Works’ shall mean and include taking delivery of line materials labour and services, as per the
Specifications and complete erection, testing and putting into satisfactory operation including all
transportation, handling, unloading and storage at the Site as defined in the Contract.
1.6 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of the Contract and
such other schedules and drawings as may be mutually agreed upon.
1.7 ‘Site’ shall mean and include the land and other places on, into or through which the works and the
related facilities are to be erected or installed and any adjacent land, paths, street or reservoir which
may be allocated or used by the Owner or Contractor in the performance of the Contract.
1.8 The term ‘Contract Price’ shall mean the lump-sum price quoted by the Contractor in his bid with
additions and/or deletions as may be agreed and incorporated in the Letter of Award and the contract
agreement for the entire scope of the works.
1.9 ‘Notice of Award of Contract’/’Letter of Award’/’Telex of Award’ shall mean the official notice issued by
the Owner notifying the Contractor that his bid has been accepted.
1.10 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance of the bid.
1.11 ‘Date of Contract’ shall mean the date on which letter of commencement of work issued by the respective
sub division deputy engineer.
1.12 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise expressly defined shall
mean calendar day or days of 24 hours each.
A ‘Week’ shall mean continuous period of seven (7) days.
1.13 Writing’ shall include any manuscript, type written or printed statement, under or over signature and/or
seal as the case may be.
1.14 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’, ‘Proper’, ‘Requested’, ‘As
Directed’, ‘Where Directed’, ‘When Directed’, ‘Determined by’, ‘Accepted’, ‘Permitted’, or words and
phrases of like importance are used the approval, judgment, direction etc. is understood to be a function
of the Owner/Engineer.
1.15 ‘Guarantee Period’ shall mean the period during which the Contractor shall remain liable for repair or
replacement of any defective part of the works performed under the Contract.
1.16 ‘Words imparting the singular only shall also include the plural and vice –versa where the context so
1.17 Words imparting ‘Person’ shall include firms, companies, corporations and associations or bodies of
individuals, whether incorporated or not.
1.18 GST / Cess means all applicable tax / cess under GST Laws ,GST laws means IGST Act, GST (
compensation to the state for loss of Revenue ) Act, CGST Act, UTGST Act & SGSCT Act, 2017 and
all related ancillary legislations.
1.19 Works contract means a contract for composit supply & covered under the definition of works contract as
defined under section 2 ( 119) , of the CGST act , 2017 or SGST act ,2017 & similar provisions, applicable
under the UTGST act, 2017 & the IGST act ,
2.0 APPLICATION
These General Conditions shall apply to the extent that they are not superseded by provisions in other
parts of the Contract.
Seal & Signature of Bidder
The works carried out under this Contract shall conform to the all statutory regulation and provisions the
acts, mentioned in the Technical Specifications, and, when no regulations or standard is mentioned, to
the authoritative regulations or standards/ Act, appropriate to the works and such stipulations shall be the
latest issued by the concerned institution.
4.0 LANGUAGE AND MEASURES
All documents pertaining to the Contract including specifications, schedules, notices, correspondences,
operating and maintenance instructions, drawings or any other writing shall be written in English
language. The Metric System of measurement shall be used exclusively in the Contract.
5.0 CONTRACT DOCUMENTS
5.1 The term Contract Documents shall mean and include the following which shall be deemed to form an
integral part of the Contract:
a) Invitation to Bid including letter forwarding the Bidding Documents, Instructions to Bidders,
General Terms and Conditions of Contract and all other documents included under Volume- I and
the Special Conditions of Contract.
b) Contractor’s Bid Proposal and the documents attached there to including the letters of
clarifications thereto between the Contractor and the Owner prior to the Award of Contract except
to the extent of repugnancy.
c) All the materials, literature, data and information of any sort given by the Contractor along with his
bid, subject to the approval of the Owner /Consultant.
d) Letter of Award and any agreed variations of the conditions of the documents and special terms
and conditions of Contract, if any.
5.2 In the event of any conflict between the above mentioned documents the matter shall be referred to the
Engineer whose decision shall be considered as final and binding upon the parties.
6.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
6.1 The Contractor shall not, without the Owner’s prior written consent, disclose the Contract, or any
provision thereof, or any specification, plan, drawing, pattern, sample or information furnished by or on
behalf of the Owner in connection therewith, to any person other than a person employed by the
Contractor in the performance of the Contract. Disclosure to any such employed person shall be made
in confidence and shall extend only so far as may be necessary for the purpose of such performance.
6.2 The Contractor shall not, without the Owner’s prior written consent, make use of any document or
information enumerated in various Contract documents except for the purpose of performing the
6.3 The Contractor shall not communicate or us in advertising, publicity, sales releases or in any other
medium, photographs or other reproduction of the Works under this Contract, or descriptions of the site,
dimensions, quantity, quality or other information, concerning the works unless prior written permission
has been obtained from the Owner.
6.4 Any document, other than the Contract itself, enumerated in various Contract documents shall remain
the property of the Owner and shall be returned (in all copies) to the Owner on completion of the
Contractor’s performance under the Contract if so required by the Owner.
7.0 CONSTRUCTION OF THE CONTRACT
7.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to be entered into will be
treated as a single Contract. Award shall be placed on the successful Bidder as follows:
For Hiring vehicle under Jambuva Circle
7.2 The Contract shall in all respects be construed and governed according to Indian Laws.
7.3 It is clearly understood that the total consideration for the Contract(s) has been broken up into various
components only for the convenience of payment under the Contract(s) and for the measurement of
deviations or modifications under the Contract(s).
8.0 JURISDICTION OF CONTRACT
8.1 The laws applicable to the Contract shall be the laws in force in India. The Courts of Vadodara shall
have exclusive jurisdiction in all matters arising under this Contract.
Seal & Signature of Bidder
9.0 EXECUTION OF CONTRACT:
9.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one copy of the final
agreement to the Contractor for his scrutiny and approval.
9.2 The Agreement, unless otherwise agreed to, shall be signed within 10 days of the acceptance of the
Letter of Award, at the office the Owner at Jambuva on a date and time to be mutually agreed. The
Contractor shall provide for signing of the Contract, In case the Contract is to be signed beyond the
stipulated time, the Bid Guarantee submitted with the Proposal will have to be extended accordingly.
9.3 The Agreement will be signed in copies to be specified and the Contractor shall be provided with one
signed original and the rest will be retained by the Owner.
9.4 Subsequent to signing of the Contract, the Contractor at his own cost shall provide the Owner with
copies of agreement within fifteen (15) days after the signing of the Contractor.
10.0 ENFORCEMENT OF TERMS
10.1 The failure of either party to enforce at any time any of the provisions of this Contract or any rights in
respect thereto or to exercise any option therein provided, shall in no way be construed to be a waiver
of such provisions, rights or options or in any way to affect the validity of the Contract. The exercise by
either party of any of its rights herein shall not preclude or prejudice either party from exercising the
same or any other right it may have under the Contract.
11.0 COMPLETION OF CONTRACT
11.1 Unless otherwise terminated under the provisions of any other relevant clause, this Contract shall be
deemed to have been completed on the expiry of the guarantee period as provided for under the clause
entitled ‘Guarantee’ in this section of the Volume-I.
B. GUARANTEES & LIABILITIES
12.0 TIME – THE ESSENCE OF CONTRACT
12.1 The time and the date of completion of the Contract as stipulated in the Contract by the Owner without
or with modifications, if any, and so incorporated in the Letter of Award, shall be deemed to be the
essence of the Contract. The Contractor shall so organize his resources and perform his work as to
complete it not later than the date agreed to.
13.0 EFFECTIVENESS OF CONTRACT
The Contract shall be considered as having come into force from the date of the commencement given
by the respective construction sub division unless otherwise provided in the notification of award.
14.0 TAXES, PERMITS & LICENCES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully assessed against the
Owner or the Contractor in pursuance of the Contract. In addition the Contractor shall be responsible
for payment of all Indian duties including GST, levies and taxes lawfully assessed against the
Contractor for his personal income & property only.
15.0 DEFENCE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or agent of the Owner, for
the failure, omission or neglect on the part of the Contractor to perform any acts, matters, covenants or
things under the Contract, or for damage or injury caused by the alleged omission or negligence on the
part of the Contractor, his agents, representatives or his Sub-Contractors, or in connection with any
claim based on lawful demands of Sub-Contractors, workmen, suppliers or employees, the Contractor
shall in all such cases indemnify and keep the Owner, and the Engineer and/or his representative,
harmless from all losses, damages, expenses or decrees arising of such action.
16.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of the Contractor
from all his liabilities under the Contract. Such final payment shall be made only at the end of the
Guarantee/Warranty period or after finalization of material account and final bill and till such time as the
Contractual liabilities and responsibilities of the Contractor, shall prevail. All other payments made under
the Contract shall be treated as on-account payments.
17.0 ENGINEER’S DECISION
Seal & Signature of Bidder
17.1 In respect of all matters which are left to the decision of the Engineer including the granting or with-
holding of the certificates, the Engineer shall, if required to do so by the Contractor, give in writing a
decision thereon.
17.2 If, in the opinion of the Contractor, a decision made by the Engineer is not in accordance with the
meaning and intent of the Contract, the Contractor may file with the Engineer, within fifteen (15) days
after receipt of the decision, a written objection to the decision.
Failure to file an objection within the allotted time will be considered as an acceptance of the Engineer’s
decision and the decision shall become final and binding.
17.3 The Engineer’s decision and the filing of the written objection thereto shall be a condition precedent to
the right to request arbitration. It is the intent of the Agreement that there shall be no delay in the
execution of the works and the decision of the Engineer as rendered shall be promptly observed.
18.0 POWER TO VARY OR OMIT WORK
18.1 No alterations, amendments, omissions, suspensions or variations of the Works (hereinafter referred to
as ‘variation’) under the Contract as detailed in the Contract Documents, shall be made by the Contractor
except as directed in writing by the Engineer, but the Engineer shall have full powers subject to the
provisions hereinafter contained, from time to time during the execution of the Contract, by notice in
writing to instruct the Contractor to make such variation without prejudice to the Contract. The
Contractor shall carry out such variation and be bound by the same conditions as far as applicable as
though the said variations occurred in the Contract Documents. If any suggested variations would, in
the opinion of the Contractor, if carried out, prevent him from fulfilling any of his obligations or guarantees
under the Contract, he shall notify the Engineer thereof in writing and the Engineer shall decide forthwith
whether or not, the same shall be carried out and if the Engineer confirms his instructions, the
Contractor’s obligations and guarantees shall be modified to such an extent as may be mutually agreed.
Any agreed difference in cost occasioned by any such variation shall be added to or deducted from the
Contract Price as the case may be.
18.2 In the event of Engineer requiring any variation, a reasonable and proper notice shall be given to the
Contractor to enable him to work his arrangement accordingly, and in cases where goods or materials
are already prepared or any design, drawings or pattern made or work done as per the contract requires
to be altered, a reasonable and agreed sum in respect thereof shall be paid to the Contractor.
18.3 In any case in which the Contractor has received instructions from the Engineer as to the requirement
of carrying out the alterations or additional or substituted work which either then or later on, will in the
opinion of the Contractor, involve a claim for additional payment, the Contractor shall immediately and
in no case later than thirty (30) days, after receipt of the instructions aforesaid and before carrying out
the instructions, advise the Engineer to that effect. But the Engineer shall not become liable for payment
of any charges in respect of any such variations, unless the instructions for the performance of the same
shall be confirmed in writing by the Engineer.
18.4 If any variation in the Works results in reduction of Contract Price, the parties shall agree, in writing, so
to the extent of any change in the price, before the Contractor proceeds with the change.
18.5 In all the above cases, in the event of a disagreement as to the reasonableness of the said sum, the
decision of the Engineer shall prevail.
18.6 Notwithstanding anything stated above in this clause, the Engineer shall have the full power to instruct
the Contractor, in writing, during the execution of the Contract to vary the quantities of the items or
groups of items in accordance with the provisions of clause entitled ‘Change of Quantity’ in section GCC
of this Volume-I. The Contractor shall carry out such variations and be bound by the same conditions
as though the said variations occurred in the Contract Documents. However, the Contract Price shall
be adjusted at the rates and the prices provided for the original quantities in the Contract.
19.0 ASSIGNMENT AND SUB-LE TTING OF CONTRACT:
No subletting of contract is allowed. Contractor should carry out work on his own under his or his authorized
supervisor and by labours employed by him.
20.0 CHANGE OF QUANTITY
20.1 During the execution of the Contract, the Owner reserves the right to increase or decrease the quantities
of items under the Contract but without any change in unit price or other terms & conditions. Such
variations unless otherwise specified in the accompanying Special Conditions of Contract and/or
Technical Specifications, shall not be subjected to any limitation for the individual items but the total
variations in all such items under the Contract shall be limited to a percentage of the Contract
price as specified in the Special Conditions of Contract.
Seal & Signature of Bidder
20.2 The Contract price shall accordingly be adjusted based on the unit rates available in the Contract for
the change in quantities as above. The base unit rates, as identified in the Contract shall however
remain constant during the currency of the Contract, except as provided for in Clause 33.0 below. In
case the unit rates are not available for the change in quantity, the same shall be subjected to mutual
21.0 COOPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and Consulting Engineers
and freely exchange with them such technical information as is necessary to obtain the most efficient
and economical design and to avoid unnecessary duplication of efforts. The Engineer shall be provided
with three copies of all correspondence addressed by the Contractor to other Contractors and
Consulting Engineers of the Owner in respect of such exchange of technical information, wherever
22.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials, employees, or agents nor
any order by the Owner or the Engineer for payment of money or any payment for or acceptance of, the
whole or any part of the Works by the Owner or the Engineer, nor any extension of time, nor any
possession taken by the Engineer shall operate as a waiver of any provision of the Contract, or of any
power herein reserved to the Owner or any right to damages herein provided nor shall any waiver of
any breach in the Contract be held to be a waiver of any other or subsequent breach.
23.0 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND LIABILITY OF THE CONTRACTOR.
No interim payment certificate of the Engineer, nor any sum paid on account by the Owner, nor any
extension of time for execution of the Works granted by the Engineer shall affect or prejudice the rights
of the Owner against the Contractor or relieve the Contractor of his obligation for the due performance
of the Contract, or be interpreted as approval of the Works done or of the equipment furnished and no
certificate shall create liability for the Owner to pay for alterations, amendments, variations or additional
works not ordered, in writing , by the Engineer or discharge the liability of the Contractor for the payment
of damages whether due, ascertained, or certified or not or any sum against the payment of which he is
bound to indemnify the Owner, nor shall any such certificate nor the acceptance by him of any sum paid
on account or otherwise affect or prejudice the rights of the Owner against the Contractor.
C. CONTRACT SECURITY AND PAYMENTS
24.0 CONTRACT PERFORMANCE GUARANTEE
The Contractor shall furnish Contract Performance Guarantee(s) for the proper fulfillment of the Contract
in the prescribed form within fifteen (15) days of “Notice of Award of Contract”. The performance
guarantee(s) shall be as per terms prescribed.
25.1 The payment to the Contractor for the performance of the works under the Contract will be made by the
Owner as per the guidelines and conditions specified herein. All payments made during the Contract
shall be on account payments only. The final payment will be made on completion of all Works and on
fulfillment by the Contractor of all his liabilities under the Contract.
25.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees only.
Payment terms will be as prescribed in the special conditions of contract and on fulfillment of conditions
specified thereof.
26.0 Payment Schedule:
26.1 Application for Payment
26.2 The Contractor shall submit application for the payment in the prescribed proforma of the Owner.
Performa for application for payment will be as prescribed.
26.3 Each such application shall state the amount claimed and shall set forth in detail, in the order of the
Payment Schedule, particulars of the Works including the Works executed at Site and of the equipment
shipped/brought on to the site pursuant to the Contract up to the date mentioned in the application and
for the period covered since the last preceding certificate, if any.
Seal & Signature of Bidder
26.4 Every interim payment certificate shall certify the Contract value of the Works executed up to the date
mentioned in the application for the payment certificate, provided that no sum shall be included in any
interim payment certificate in respect of the works that, according to the decision of the Engineer, does
not comply with the Contract.
26.5 Mode of Payment
Payment due on completion of work shall be made by the Owner through Owner’s Bank or directly to
the Contractor as per the payment schedule.
26.6 All payments under the Contract shall be made as stipulated in the Special Conditions of Contract after
signing the Contract Agreement.
Progressive payments linked with erection shall only be made after the issue of certificates by the
Engineer, one for the quantum of work completed and the other for the successful completion of quality
check points involved in the quantum of work billed.
27.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses which the Owner may have paid, for which under the Contract the
Contractor is liable, or any other retention award will be claimed by the Owner. All such claims shall be
billed by the Owner to the Contractor regularly as and when they fall due. Such bills shall be supported
by appropriate and certified vouchers or explanations, to enable the Contractor to properly identify such
claims.Such claims shall be paid by the Contractor within thirty (30) days of the receipt of the
corresponding bills and if not paid by the Contractor within the said period, the Owner may then deduct
the amount, from any monies due or becoming due by him to the Contractor under the Contract or may
be recovered by sections of Law or otherwise.
D. RISK DISTRIBUTION
28.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the plant until the
successful completion of commissioning as defined elsewhere in the Bid document.
29.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
29.1 In case the Contractor’s performance is delayed due to any act of omission on the part of the Owner or
his authorized agents, then the Contractor shall be given due extension of time for the completion of the
Works, to the extent such omission on the part of the Owner has caused delay in the Contractor’s
performance of the Contract.
Regarding reasonableness or otherwise of the extension of time, the decision of the Engineer shall be
29.2 In addition, the Contractor shall be entitled to claim demonstrable and reasonable compensation if such
delays have resulted in any increase in cost. The Owner shall examine the justification for such a
request for claim and if satisfied, the extent of compensation shall be mutually agreed depending upon
the circumstances at the time of such an occurrence.
30.0 DEMURRAGE, WHARFAGE, ETC.
All demurrage, warfare and other expenses incurred due to delayed clearance of the material or any
other reason shall be to the account of the Contractor.
30.0 FORCE MAJEURE
30.1 Force majeure is herein defined as any cause which is beyond the control of the Contractor or the Owner
as the case may be, which they could not foresee or with a reasonable amount of diligence could not
have foreseen and which substantially affects the performance of the Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and epidemics;
b. Acts of any Government, domestic or foreign, including but not limited to war, declared or
undeclared, priorities, guarantees, and embargoes.
Provided either party shall within fifteen (15) days from the occurrence of such a cause notify the other
in writing of such causes.
30.2 The Contractor or the Owner shall not be liable for delays in performing his obligations resulting from
any force majeure cause as referred to and/or defined above:
Seal & Signature of Bidder
The date of completion will, subject to hereinafter provided, be extended by a reasonable time even
though such cause may occur after Contractor’s performance of obligation has been delayed due to
31.0 SUSPENSION OF WORK
31.1 The Owner reserves the right to suspend and reinstate execution of the whole or any part of the Works
without invalidating the provisions of the Contract. Orders for suspension or reinstatement of the Works
will be issued by the Engineer to the Contractor in writing. The time for completion of the works will be
extended for a period equal to duration of the suspension.
31.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such suspension of the
works will be paid by the Owner, provided such costs are substantiated to the satisfaction of the
Engineer. The Owner shall not be responsible for any liabilities if suspension or delay is due to some
default on the part of the Contractor or his Sub-Contractor.
32.0 “RIGHTS OF THE OWNER:
Whenever any claim or claims for payment of a sum of money arises out of or under the contract against
the Contractor, the Owner shall be entitled to withhold and also have a lien to retain such sum or sums
in whole or in port from the security, If any, deposited by the Contractor and for the purpose aforesaid,
the Owner shall be entitled to encash and withhold the amount of Performance Bank Guarantee or other
security, if any, furnished as the case may be. The Owner shall also have a lien over the same pending
finalization or adjudication of any such claim. In the event Of the security is insufficient to cover the
claimed amount or amounts, the Owner shall be entitled to withhold and have lien to retain to the extent
of the such claimed amount or amounts referred to above, from any sum or sums found payable or
which at any time thereafter may become payable to the Contractor under the same contract or any
other contract with the Owner or GUVNL or its subsidiary companies pending finalization or adjudication
of any such claim.
Lien in respect of Claims in other Contracts:
a) Any sum of money due and payable, to the Contractor (Including the security deposit) under the
contract may be withheld or retained by way of lien by the Owner against any of its claim in respect of
payment of a sum of money arising out of or under any other contract made by the Contractor with the
Owner or GUVNL or any of its subsidiary companies.
b) It is on agreed that the sum of money so withheld or retained under this clause by the Owner will be
kept withheld or retained as such by the Owner till its claim arising out of the same contract or any other
contract is either mutually settled or determined by the arbitrator or competent court, as the case may
be, and the Contractor shall have no claim for interest or damages whatsoever on this account or on
any other ground in respect of any sum of money withheld or retained under this clause and as may be
duly notified to the Contractor.
33.0 CONTRACTOR`S DEFAULT
33.1 If the Contractor shall neglect to execute the works with due diligence and expedition or shall refuse or
neglect to comply with any reasonable order given to him, in writing by the Engineer in connection with
the works or shall contravene the provisions of the Contract, the Owner may give notice in writing to the
Contractor to make good the failure, neglect or contravention complained of. Should the Contractor fail
to comply with the notice within thirty (30) days from the date of serving the notice, then and in such
case the Owner shall be at liberty to employ other workmen and forthwith execute such part of the works
as the Contractor may have neglected to do or if the Owner shall think fit, without prejudice to any other
right he may have under the Contract to take the work wholly or in part out of the Contractor’s hands
and re-contract with any other person or persons to complete the works or any part thereof and in that
event the Owner shall have free use of all Contractor’s equipment that may have been at the time on
the Site in connection with the works without being responsible to the Contractor for fair wear and tear
thereof and to the exclusion of any right of the Contractor over the same, and If the sum that the
contractor is entitled to be paid plus the costs incurred by the Owner in completing the works, exceeds
the Contract Price or the entire works if entire works have been completed or the price for part of the
work if part of the works have been completed, the Contractor shall be liable for such excess.
If such excess is greater than the sums due to the Contractor, the Contractor shall pay the balance to
the Owner and if such excess is less than the sums due to the Contractor, Owner shall pay the balance
to the Contractor. For facilitating such payment, Owner shall pay the balance to the contractor. For
facilitating such payment, Owner shall encash the Bank Guarantees of Contactor available with Owner/s
and retain such other payment due to the Contractor under the Contract in question or any other
Seal & Signature of Bidder
Contract that the Owner/s may have with the Contractor. Such payment of excess amount shall be
independent of the liquidated damages for delay which the Contractor shall have to pay if the completion
of works is delayed.
33.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his liability to pay
liquidated damages for delay in completion of Works as defined in Clause 14.0 of this Section.
33.3 Such action by the Owner as aforesaid the termination of the Contract under this clause shall not entitle
the Contractor to reduce the value of the Contract Performance Guarantee nor the time thereof. The
Contract Performance Guarantee shall be valid for the full value and for the full period of the Contract
including guarantee period.
34.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
34.1 The Owner reserves the right to terminate the Contract either in part or in full due to reasons other than
those mentioned under clause entitled ‘Contractor’s Default’
The GETCO reserves the right to terminate the contract at any time without assigning any reason by
giving 30 days notice in writing. The contractor shall not be entitled to any compensation by reasons of
such termination of contract.
34.2 The Contractor upon receipt of such notice shall discontinue the work on the date and to the extent
specified in the notice, make all reasonable efforts to obtain cancellation of all orders and Contracts to
the extent they are related to the work terminated and terms satisfactory to the Owner, stop all further
sub-contracting or purchasing activity related to the work terminated, and assist Owner in maintenance,
protection, and disposition of the works acquired under the Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation, equitable and reasonable,
dictated by the circumstances prevalent at the time of termination.
34.3 If the Contractor is an individual or a proprietary concern and the individual or the proprietor dies and if
the Contractor is a partnership concern and one of the partners dies then unless the Owner is satisfied
that the legal representatives of the individual Contractor or of the proprietor of the propriety concern
and in the case of partnership, the surviving partners, are capable of carrying out and completing the
Contract the Owner shall be entitled to cancel the Contract as to its incomplete part without being in any
way liable to payment of any compensation to the estate of deceased Contractor and/or to the surviving
partners of the Contractor’s firm on account of the cancellation of the Contract. The decision of the
Owner that the legal representatives of the deceased Contractor or surviving partners of the Contractor’s
firm cannot carry out and complete the Contract shall be final and binding on the parties. In the event of
such cancellation the Owner shall not hold the estate of the deceased Contractor and/or the surviving
partners of the estate of the deceased Contractor and/or the surviving partners of the Contractor’s firm
liable to damages for not completing the Contract.
35.0 FRUSTRATION OF CONTRACT
35.1 In the event of frustration of the Contract because of supervening impossibility in terms of Section 56 of
the Indian Contract Act, parties shall be absolved of their responsibility to perform the balance portion
of the Contract, subject to provisions contained in sub-clause 42.3 below.
35.2 In the event of non-availability or suspension of funds for any reasons, whatsoever (except for reason
of willful or flagrant breach by the Owner) and/or Contractor then the works under the Contract shall be
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for financing to the
Contractor in accordance with the terms of the Contract within three months of the event, the parties
hereto shall be relieved from carrying out further obligations under the Contract treating it as frustration
of the Contract.
35.3 In the event referred to in sub-clauses 42.1 & 42.2 above the parties shall mutually discuss to arrive at
reasonable settlement on all issues including amounts due to either party for the work already done on
quantum merit basis which shall be determined by mutual agreement between the parties.
36.0 GRAFTS AND COMMISSIONS ETC.
Any graft, commission, gift or advantage given, promised or offered by or on behalf of the Contractor or
his partner(s), agent(s), officer(s), director(s), employee(s) or servant(s) or any one on his or their behalf
in relation to the obtaining or to the execution of this or any other Contract with the Owner, shall in
addition to any criminal liability which it may incur, subject the Contractor to the cancellation of this and
Seal & Signature of Bidder
all other Contracts and also to payment of any loss or damage to the Owner resulting from any
cancellation. The Owner shall then be entitled to deduct the amount so payable from any monies
otherwise due to Contractor under the Contract.
E. RESOLUTION OF DISPUTES
37.0 SETTLEMENT OF DISPUTES
37.1 Any dispute(s) or difference(s) arising out of or in connection with the Contract shall, to the extent
possible, be settled amicably between the parties.
37.2 If any dispute or difference of any kind, whatsoever, shall arise between the Owner and the Contractor,
arising out of the Contract for the performance of the Works whether during the progress of the Works
or after its completion or whether before or after the termination, abandonment or breach of the Contract,
it shall, in the first place, be referred to and settled by the Engineer, who, within a period of thirty (30)
days after being requested by either party to do so, shall give written notice of his decision to the Owner
and the Contractor.
37.3 Save as hereinafter provided, such decision in respect of every matters so referred shall be final and
binding upon the parties until the completion of the Works and shall forthwith be given effect to by the
Contractor who shall proceed with the Works with all due diligence, whether he or the Owner requires
arbitration as hereinafter provided or not.
37.4 If after the Engineer has given written notice of his decision to the parties, no claim to arbitration has
been communicated to him by either party within thirty (30) days from the receipt of such notice, the
said decision shall become final and binding on the parties.
37.5 In the event of the Engineer failing to notify his decision as aforesaid within thirty (30) days after being
requested as aforesaid, or in the event of either the Owner or the Contractor being dissatisfied with any
such decision, or within thirty (30) days after the expiry of the first mentioned period of thirty days, as
the case may be, either party may require that the matters in dispute be referred to arbitration as
hereinafter provided.
38.0 ARBITRATION
38.1 (1) Amicable Settlement
Any dispute, difference, controversy or claim between the Parties arising out of or relating to this contract
with reference to the construction, interpretation, breach, termination or validity thereof (hereinafter
referred as "the Dispute") shall, upon the written request of either Party be referred to the authorized
representatives of the Disputing Parties for resolution. The authorized representatives shall promptly
meet and attempt to negotiate in good faith a resolution of the Dispute within thirty days of the service
of the request.
(2) Arbitration
If the parties fail to amicably resolve the disputes or differences or contrary claims as indicated herewith
in sub clause (1) of Clause, arising under or in connection with the present works contracts, whether
pertaining to works contracts alone or works and procurement both, the same shall be referred to
arbitration under the Gujarat Public Works Contracts Disputes Arbitration Tribunal Act, 1992."
39.0 Termination of Contract:
In case of contractor fails to complete work or part thereof within contractual period or in case the work
is found not in accordance with prescribed specification the GETCO shall exercise its discretionary
39.1 To recover, from the contractor as agreed, by way of penalty clause above plus applicable taxes ( if
39.2 To get the work done other contractor after giving due notice to the contractor on account and at the risk
of the contractor for such work executed or other similar description without canceling the contract in
respect of the works not yet due for completion or
40.0 To cancel the contract.
In the event of the risk works of similar description, the opinion of the GETCO shall be final. In the event
of action taken under clause (A) or (B) above, the contractor shall be liable to pay for any loss which the
GETCO may sustain on that account, but the contractor shall not be entitled to have any saving on such
purchases made against default.
The decision of the GETCO shall be final as regards to the acceptability of stores supplied by the
contractor and the GETCO shall not be required to give any reason in writing or otherwise at any time
for rejection of the stores.
Seal & Signature of Bidder
41.0 LABOUR LAWS:
41.1 Persons below the age of 18 years shall not be employed for the work. No female worker shall be
employed in the night shift between 07.00 p.m. and 06.00 a.m. next day.
41.2 Contractor shall maintain a valid labor license under the contract Labor (Regulation and abolition) Act
for employing necessary manpower required by him. In the absence of such license, the contract shall
be liable to be terminated without assigning any reason thereof.
41.3 The Contractor shall at his own expenses comply with all labor laws and keep the GETCO indemnified
in respect thereof. Some of the major liabilities under various labor and industrial laws which the
Contractor shall comply with, are as under:
i) Payment of contribution by way of Employer’s Contribution towards provident Fund, Family
Pension Scheme, Deposit Linked Insurance Scheme, Administrative charges, etc. at the rates
made applicable from time to time by the Government of Gujarat / Government of India or other
Statutory Authority.
ii) Payment of deposit in respect of each contract labor at the rate of Rs. 30/- or later prevailing
rate with the Office of Commissioner of Labor as per the Contract Labor (Regulation and
Abolition) Act.
iii) License fee as prescribed under the Contract Labor (Regulation and Abolition) Act and Rules
framed there under depending upon the number of workmen.
iv) Paid leave facility and wages as per the provision of the Factories Act at the rate of one day for
every 20 days of working.
v) Identity cards as prescribed under the Factories Act with photo affixed thereto, for identification.
vi) Payment of retrenchment compensation, Notice Pay and other liabilities as per Industrial
Dispute Act. Any payment to the Contractor’s employee arising out of any claim of disputes
under the Industrial Disputes Act 1947 or any other Labour Laws.
vii) Payment of compensation in case of accidental injury.
viii) Provision of crèche if the female laborers employed are more than
ix) Maternity Leave as per the provisions of the Maternity Benefit Act.
The above are some of the major liabilities of the Contractor in addition to other liabilities prescribed
under the various labour laws, in force from time to time, from Statutory Authorities like State
Government/ Government o India, which the Contractor shall have to comply with.
41.4 PROVIDENT FUND AND FAMILY PENSION SCHEME:
The Contractor shall submit along with his bills (month wise) a statement regarding deduction against
employees Provident Fund and Family Pension Scheme in respect of each concerned employee.
Provident Fund and Family Pension Scheme at the rate of 18% (or at the rate made applicable by the
Government from time to time of the wages. The Contractor’s contribution and his worker’s contribution
towards Provident Fund and Family Pension Scheme shall be deposited by the Contractor with Regional
Provident Fund Commissioner, Ahmedabad.
41.5 DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit ½ % of the wages in respect of employees who is a member of the
Provident Fund, as the contribution to the Deposit Linked Insurance Scheme with Regional Provident
Fund Commissioner, Ahmedabad.
41.6 ADMINISTRATIVE CHARGES:
Administrative charges for maintaining Provident Fund Account shall be deposited by the Contractor
with Regional Provident Fund Commissioner, Ahmedabad at the rates applicable.
41.7 PAID LEAVE FACILITY:
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract Labor, shall be
provided by the Contractor to his workers. He shall maintain Leave Records, Leave Cards, for individual
laborer which shall be duly verified, approved and certified by the authorized Officer of the GETCO.
41.8 WORKMAN’S COMPENSATION FUND AND EMPLOYER’S LIABILITY INSURANCE:
The contractor shall cover all his employees under workmen’s compensation fund and under the liability
insurance. The purchaser shall not be responsible for any payments of compensation to the
workers/supervisor of the contractor for fatal or non-fatal accidents during the pungency of the contract.
41.9 The contractor shall employ adequate number of experienced skilled at site for daily supervision and for
maintenance of various registers and records required under the law and contract. No payment for
supervision shall be admissible.
Seal & Signature of Bidder
41.10 CONTRCTOR TO INDEMNIFY THE GETCO:
The Contractor shall Indemnify the GETCO and every member officer and employees of the GETCO
also, Engineer-in-Charge and his staff against all actions, proceedings, claims, demands, costs and
expenses whatsoever, arising out of or in connection with the matters referred herein above elsewhere
and against all actions, proceedings, claims, demands, costs and expenses which may be made against
the GETCO or Government for or in respect of performance of his obligation under the contract
documents. The GETCO shall not be liable for intervention of authority Government for or in respect of
performance of his obligation under the contract documents. The GETCO shall not be liable for or in
respect of or in consequence of any accident or injury to any workman or other person in the employment
of the Contractor or his Sub-Contractor and the contractor shall indemnify and keep indemnified the
GETCO against all claims, demands, proceedings, cost, charges and expenses whatsoever in respect
thereof or in relation thereto.
41.11 WORKMEN’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
Insurance shall be affected for all the Contractor’s employee engages in the performance of this
contract. If any of the work is sublet, the Contractor shall require the Sub-Contractor to provide
workmen’s employer’s liability insurance for the latter’s employees, such employees shall be covered
under the Contractor’s Insurance.
41.12 WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR
a) The Contractor shall pay minimum wages per day to his Labors/ Workers as per rates fixed under the
minimum wages act. The wages of every Contract Labor employed by him under this contract shall
also be paid by him before the expiry of 7th day of the last day of the month in respect of the wages
are payable (i.e. wages of a month have to be paid by him in the first week of the next month). Any
default will result in cancellation of contract forthwith or else the contractor shall be punishable to the
extent of Rs. 100/- per each day or as per the prevailing rules of labor laws.
b) The Contractor shall give his Telephone Number and Address to the GETCO, so that, in case of labor
trouble etc. the Contractor can be contacted. The Contractor shall arrange to have his office outside
the factory work premises and the Contractor shall arrange to have his office outside the factory work
premises and the Contractor shall keep himself present throughout the working hours.
42.0 REGISTRATION WITH PROVIDENT FUND OFFICE
I) The separate P.F. code issued from P.F. commissioner is required to be taken by contractor.
ii) If the contractor does not possess separate P.F. code number of RPFC, his tender will not be
considered for acceptance.
iii) The contractor should mention separate P.F. code number allotted by PPFC, along with the
Date: Superintending Engineer
(Signature of Contractor) GETCO, C.O., Jambuva
Seal & Signature of Bidder
SPECIAL CONDITIONS OF CONTRACT
1.0 General Particulars :
This part of the Bid Document relates to certain specific/special terms and conditions particular to the
Contract. The provisions herein are to be read and understood in conjunction with the relevant
provisions elsewhere in the Instructions to Bidders (ITB), the General Conditions of Contract (GCC) The
intent of provisions herein are specific to this contract and are, in general, supplementary to related
provisions under ITB, GCC. However, in certain provisions which are contrary to those in ITB, GCC
the provisions in these Special Conditions of Contract will prevail.
2.0 Tender Fee and Earnest Money Deposit (EMD ) : Bidders shall compulsorily pay tender fee and EMD
through RTGS/NEFT only
1) In case of payment through RTGS/NEFT the scan copy of payment made (transaction slip of payment
made) shall be uploaded online with the Tender documents on n-procure portal.
2) Bidder has to provide following detail on the same date of payment made so that receipt can be
generated at below mentioned e-mail ids:
Sr. No. Required Details
1 Name & Postal Address of the bidder
2 Contact Detail & e-mail id of the bidder
3 Tender No. with due date
4 Mode of Payment made
5 Ref. ID with Bank Details(UTR number)
6 Amount Paid for Tender fee in Rs.
7 Amount Paid for EMD in Rs.
3) GETCO Beneficiary Bank Details are as under:
Sr.No. Particulars Requisite Details
1 Name of Bank BANK OF BARODA
2 Name of Branch MAKARPURA VILLAGE BRANCH, VADODARA
5 IFSC Code BARB0MAKARP
6 Name of Account GETCO , JAMBUVA
2.1 The bid security is required to protect the owner against the risk of Bidder’s conduct, which would warrant
the guarantee forfeiture, pursuant to relevant para elsewhere The bid guarantee shall be made
payable to the Owner without any condition whatsoever.
2.2 The Owner will reject any bid not secured in accordance with Para 18.1 above, as non-responsive.
No exemptions are made in the furnishing of the security.
2.3 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of tender or three
months from the date of submission of tender.
2.4 The successful bidders, Bid Security will be discharged upon, furnishing the contract Performance
2.5 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the bidder on the bid Form:
b) If a bidder refuses to accept the contract or fails to commence the works (including supplies within
thirty days of letter of award of contract)
2.6 Bidders are requested to pay an earnest money deposit (1% of estimated cost) by RTGS/NEFT
for the amount as specified in the tender notice.
2.7 Tenders no accompanied by EMD shall be rejected.
2.8 If during the tender validity period, i.e. 180 days, the tenderer withdraws his tender, the EMD shall
be forfeited and the tenderer may be disqualified from tendering for future works of GETCO.
2.9 The EMD will be returned promptly to the unsuccessful tenderer. The EMD will be returned to the
successful tenderer after he furnishes the Security Deposit for performance and duly enters into
the contract. If he fails to furnish the SD or to execute the contract for the work offered to him, his
Seal & Signature of Bidder
EMD shall be forfeited and the tenderer may be disqualified from tendering for further works for
3.0 Validity period: The offers should be valid for minimum period of 180 Days from date of opening of
tender (Technical Bid )
4.0 Declaration by Bidder:
The Bidder shall sign the Declaration enclosed to this SCC and not furnishing the same will make the Bid
5.0 Qualifying Requirement: As mentioned in Annexure –I. Bidder shall have to upload scanned copies
of original ( Notarized/ self-attested copies of original-as specified in QR) online through n-
6.0 Price Inclusions (including Taxes & Duties):
6.1 Goods & Service tax (GST): GST & Cess as applicable shall be payable/receivable as mentioned
in clause 12 of ITB.
6.2 Evaluation of the tender shall be carried out on end cost basis.
6.3 Statutory Variations:
Any statutory increase or decrease in the taxes and duties subsequent to your offer if it takes place
within the original contractual delivery date will be to the GETCO’s account subject to the claim being
supported by documentary evidence. However, if any decrease takes place after the contractual delivery
date, the advantage will have to be passed on to the GETCO.
Income tax at source at the prevailing rate will be deducted from bills in accordance with the provision
of Income-Tax Laws and to that effect a certificate will be issued to the contractor.
7.0 SECURITY DEPOSIT
7.1 The successful bidder has to pay 100 % security deposit (5% of the Contract) upon placement of LOI
within 10 days.
7.2 The successful bidder will be required to pay an amount equivalent to 5 % of the value of the order as
a Security Deposit for satisfactory execution of the contract. Such Security Deposit will be payable either
in BG/DD payable at Vadodara. Bank guarantees from following Banks will be acceptable.
(A) Guarantees issued by the following Banks will be accepted as SD on permanent basis.
1. All Nationalized Banks.
(B) Guarantees issued by following Banks will be accepted as SD for the period up to March
2027. The validity cut-off date is with respect to date of issue of Bank Guarantee irrespective of
date of termination of Bank Guarantee.
2. AU Small Finance Bank
3. Bandhan Bank
4. City Union Bank
6. DBS Bank India Limited
8. Dhanlaxmi Bank
9. Equitas Small Finance Bank
10. FEDERAL Bank
15. IDFC First Bank
16. IndusInd Bank
17. Jammu and Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
23. South Indian Bank
Seal & Signature of Bidder
24. Standard Chartered Bank
25. Tamilnad Mercantile Bank
26. Ujjivan Small Finance Bank
28. Ahmedabad Mercantile Co-Op Bank
29. Nutan Nagrik Sahkari Bank Ltd.
30. Rajkot Nagrik Sahkari Bank Ltd
31. Saraswat Co-Operative Bank Ltd
32. SBPP Co-operative Bank Ltd.
33. SVC Co-Operative Bank Ltd.
34. The Cosmo Co-Op Bank Ltd.
35. The Gujarat State Co-Operative Bank
36. The Surat District Co-Operative Bank
37. The Surat People’s Co-Op. Bank Ltd
38. The Baroda CentraI Co-operative Bank
39. The Panchmahal District Co-Operative Bank
40. The Kalupur Commercial Co-Op. Bank
41. The Rajkot Commercial Co-operative Bank
42. The Banaskantha Mercanttile Co-op. Bank
43. Gujarat Gramin Bank
7.3 No interest will be allowed on amount of Security deposit.
7.4 The Security Deposit - total shall be kept deposited up to completion of work finalization of final bill. The
same shall be released on receipt of N.O.C. from the concerned EE(const./ TR).
7.5 This security deposit is for the performance of contract and the same is liable to be forfeited by the
GETCO in event of non-fulfillment of the terms and conditions of this contract by the contractor.
7.6 Corporate Guarantees are not admissible.
7.7 The ‘Signing of Contract ‘and ‘Contract Agreements’ will be done as per prevalent GETCO Terms and
7.8 A/T shall be issued on receipt of Bank Guarantees, contract agreement & Safety cum Indemnity Bond
within 30 days of issue of LOA.
8.0 PENALTY FOR DELAY:
8.1 If contractor fails to provide the vehicle on any day as per contract, penalty of Rs. 2000/- per day plus
applicable taxes ( if any) per vehicle will be recovered from the current RA bill and also vehicle will be
hired from other agency and if required by paying higher rate , in that case , difference of rates will be
recovered from the contractor.
If the contractor fails to provide a vehicle, the deduction from his R.A. bill should be made on prorate
considering the monthly rate payable within 26 days per month.
Further, If the contractor fails to execute the order successfully, the order will be got completed through
other agency and if required to pay higher rates in that case , difference will be recovered from the
8.2 In event of failure of the Contractor to pay the amount of Penalty as demanded, the Owner shall be
entitled to deduct the amount of Penalty for delay from the amounts payable to the Contractors under
any bills raised under this contract or any other contract with the GUVNL and its Subsidiary Companies
i.e. GETCO, GUVNL, GSECL, MGVCL, DGVCL, PGVCL UGVCL. It is permissible for the Owner to
adjust the amount of Penalty of delay against any Bank Guarantee furnished by the Contractor under
this contract or any other contract with GUVNL and/or its subsidiary companies.
8.3 The penalty will be deducted from bills payable either against this contract or from any Bank Guarantee
or any other amount payable under any other contract with the GETCO.
9.0 COMPLETION PERIOD
9.1 Overall Completion period for this Contract will be 24 Months ( 02 years) from the date of
Commencement of Work.
9.2 The completion date will be deemed to be the date on which all works on the Contract are completed to
the satisfaction of the /Engineer and is complete in all respects as per the terms and conditions of this
Seal & Signature of Bidder
10.0 Presentation of Bills
10.1 The bills for travelling of the vehicle shall be paid on monthly basis. No advance for hiring of vehicle
shall be paid. The bill in triplicate should be forwarded to concerned engineer and payment will be made
by RTGS within 30 days on submission of invoice only. Income-Tax (if any) will be deducted at source
from Monthly bill. Payment will be made by Bodeli AM Division.
Providing FASTTAG Facility:
1) Contractor has to submit the statement with monthly RA bill for reimburse the FAST TAG
2) Keep the minimum balance in Fast Tag Account as per rules & recharge regularly to avoid penalty
or stuck up in queue.
3) If due to not maintaining minimum balance or any other reason if the penalty is collected by toll booth,
then only basic amount of toll fee shall be reimbursed. Penalty/ higher rate amount is the
responsibility of contractor
11.0 Terms of Payment
The payment for work done shall be made as under only after execution of the contract
documents/furnishing of Security Deposit and on execution of work in scope of work order.
PAYMENT TERMS UNDER MSME ACT:
(1) You have to update your MSME detail on GETCO’s website by following link
https://getco.co.in/msme/ (and intimate to concern bill submitting office with copy to this office).
(2) The payment will be made within 45 days from the *date of acceptance or the **date of as
deemed acceptance of goods or services i.s After submission of all required documents as per
at terms & time to time circular issued by GETCO’s corporate office as well as statutory
requirement to process the bill.
12.0 Also the successful bidder will have to execute Agreement on stamp paper of value Rs.300/- at our
Circle office Jambuva before commencement of works as per GETCO’s prescribed Performa. The cost
of stamp paper will be borne by the contractor.
13.0 The contractor will have to give safety cum indemnity on Non-judicial Stamp paper of value Rs. 300/- to
GETCO against any possible claim of compensation for damage to contractor’s staff or any of third party
during the execution of work. The cost of stamp paper will be born by the contractor.
SPECIAL TERMS AND CONDITIONS:
The terms and condition of this section will be read in conjunction with general terms and condition of
tender. However, wherever, ambiguity observed, terms and condition mentioned under Special Terms and
Condition will supersede the General Terms and Condition of tender.
Tenders are invited for Hiring of Petrol / Diesel driven, A.C., SUV/MUV , Nine seater (8+1) and Nine plus
seater close body vehicle for 12 Hrs /day for 3000 KM / Month for 24 Months on ARC basis for 132KV
Vasedi S/S under Bodeli AM Division under Jambuva Circle.
1. However latest Model with competitive rates may be preferred. The vehicle to be offered for hiring shall
be in up-to-date condition including its tubes, tyres, battery and engine as well as conditions of outside
body. The SUV vehicle to be offered shall not have been registered before 03 years as on the date of
tender opening. However, in case of a very poor response or to break off the likely cartel, a relaxation can
be granted for One year with the permission of Circle head. However, the officers placing an order should
ensure that condition of such vehicle is tiptop.
Also seats inside the vehicle shall be suitably comfortable for seating. The bidder who offering vehicle
registered of 03 ( Three) years shall have to submit certificate on letter head mentioning that offered vehicle
is not at present provided to any prevailing work order of GETCO office and any other Government/ Semi
government office , or any other firm as on the date of tender opening.
For participation in tender, the ownership of vehicle is not necessary. Contractor can provide third party’s
vehicle. In such case , bidder shall have to execute the agreement binding that the whole responsibility
about any risks shall pertain to him & not to third party( enclosed h/w ). The provided third party vehicle
shall be same throughout the contract period. In special case, only one time change of vehicle shall be
allowed, meeting all the terms of contract & on taking prior approval of competent authority.
Seal & Signature of Bidder
Sr. Hiring of Headquarter Vehicle Hired Vehicle specification
No. vehicle for for
1 132 KV Vasedi 132 KV Vasedi S/s 12 Hrs / day , A/C ,9(8+1) seater &
S/s 3000KM / Month Nine plus seater, SUV /
2 The journey covers the area within Gujarat State and as per the instructions of Officer-in- charge.
3 The rates quoted shall be on annual rate contract basis. Thus, rates quoted shall remain valid for
complete period of Twenty-four months from the date of placement of order. The period of the
contract shall be of two years. The period can be further extended by one year on mutual agreement
as per same rates, terms & condition for maximum two times. i.e. Total extension can be given for
two years in two segments of one year each, if required. However, in case of poor service provided
by the contractor, circle head shall be empowered to terminate the contract after one year of
commencement of contract. OR The GETCO reserves the right to terminate the contract at any
time without assigning any reason by giving 30 days’ notice in writing. The contractor shall not be
entitled to any compensation by reasons of such termination of contract. One weekly off will be
given as per rules & SOR of GETCO.
4 The contractor will have to fulfill the condition of contract of Labour Regulation Abolition Act-1970
and furnish the records, failing which payment will not be made.
5 The vehicle is to be hired for a maximum 3000Km.However, for utilization of excess KM will be paid
as per rate of “Schedule B” of price bid.
6 The vehicle should be kept up to date. They should be cleaned and serviced at regular intervals of
a week/Monthly as the case may be.
7 If contractor fails to provide the vehicle on any day as per contract, penalty of Rs. 2000/- per day
plus applicable taxes( if any) per vehicle will be recovered from the current RA bill and also vehicle
will be hired from other agency and if required by paying higher rate , in that case , difference of
rates will be recovered from the contractor.
8 If the contractor fails to provide a vehicle, the deduction from his R.A. bill should be made on prorate
considering the monthly rate payable within 26 days per month.
9 Further, If the contractor fails to execute the order successfully, the order will be got completed
through other agency and if required to pay higher rates in that case , difference will be recovered
from the contractor.
10 The bills for travelling of the vehicle shall be paid on monthly basis. No advance for hiring of vehicle
shall be paid. The bill in triplicate should be forwarded to concerned engineer and payment will be
made by A/c payee Cheque or RTGS within 30 days on submission of invoice. Income-Tax (if any)
will be deducted at source from Monthly bill. Payment will be made by TR Circle office Jambuva.
11 Challans for opening and closing kilometers traveled should be got certified and duly signed by the
officers traveling in the vehicle on completion of journey. The contractor has to submit Daily Journey
Slip to the officer-in-charge who in turn, will submit the Log Book copy along with the contractor’s
bill to concern EIC. In absence of said requirement the bill will not be paid.
12 The toll taxes to be paid during official traveling of vehicle shall be borne by GETCO, OR shall be
reimbursed to the contractor on production of receipt duly signed by GETCO authority who have
traveled or directed a travel. All road tolls/bridge tolls shall be reimbursed on production of proof of
payment along with monthly bills.
Providing FASTTAG Facility:
1) Contractor has to submit the statement with monthly RA bill for reimburse the FAST TAG
2) Keep the minimum balance in Fast Tag Account as per rules & recharge regularly to avoid
penalty or stuck up in queue.
3) If due to not maintaining minimum balance or any other reason if the penalty is collected by
toll booth, then only basic amount of toll fee shall be reimbursed. Penalty/ higher rate amount
is the responsibility of contractor
13 It is the whole and sole responsibility of vehicle owner during accident to pay compensation or
damages to the persons, involved as per prevailing laws.
14 If services of the contractor are found unsatisfactory, GETCO shall exercise its discretionary power
to cancel the order in accordance with the clause no. 4 above.
15 If you fail to execute the order successfully, the order will be got completed through other agency
and if required to pay higher rates, in that cases, difference of rates will be recovered from the
Seal & Signature of Bidder
16 In case of any dispute or any discrepancy regarding the order, the decision of the Supt. Engineer
(TR), Transmission Circle Office, Jambuva will be final and binding to the contractor.
17 During the journey all the RTO rules and regulations should be followed scrupulously and contractor
will be responsible for any lapse.
18 The quantities shown in the Schedule ‘B’ of price bid and journey Kilometers will be considered
from Head-Quarter to Head-Quarter.
19 The Successful Contractor shall have to start hiring service from the date of commencement issued
by respective division head / In-charge and the contract will remain valid for twenty-four months.
20 Formula for considering price variation: No price variation will be payable on cost of oil,tyres,tube
etc. Only changes in price of petrol/diesel will be adjustable. Contractor must quote prices on the
basis of prevailing 15 days before the due date of tender. This basic rate shall be indicated in the
Diesel Difference – for every 10 (Ten) paise increase in prices of petrol/diesel , price of one paise
per Km shall be payable and for every 10 (Ten) paise decrease in prices of petrol/ diesel , price of
one paise per Km shall be deductible. This will be applicable to the actual Kilometer traveled during
21 The ‘Earnest Money Deposit’ paid herewith should be absolutely forfeited by the GETCO if the full
amount of specified security deposit is not paid in specified time by the successful bidder.
22 The Supt. Engr (TR) Circle Office. Jambuva, reserves the right to reject any or all the tenders
without assigning any reasons thereof.
23 Vehicle supplied should be comprehensively insured. Attested copy of insurance policy should be
submitted to this office before placement of order. Insurance for driver should also be arranged by
the contractor and attested copy of the same should be submitted to this office.
24 Bidder shall not offer same vehicle which is already hired at any Substation/ Subdivision/
Division/ Circle vide GETCO’s work order or at any other firm at the time of tender.
25 The successful bidder will have to provide full details such as Phone No./Mobile Phone No/ Full
address/ Name of responsible person etc, for contacting him at any time. Any offer not fulfilling this
requirement will be out rightly rejected.
26 Vehicle will have to be sent along with well experienced driver with a valid license according to
vehicle, with necessary tools and tackles to meet the normal breakdown while on road. No tools,
tackles and manpower during the pendency of order will be provided by GETCO.
27 The driver should be provided with enough money to cover the cost of petrol/ diesel, repairs and
incidental expenditure while in journey. Driver should provide with mobile phone facility for
communication. Driver should keep all documents relating to vehicle such as RC book copy,
insurance, road permit, PUC certificate, valid license etc. or any other important documents in
original copy with vehicle
28 The driver of the vehicle shall be well dressed as per R.T.O. rules and having good behavior and
having respect with officers and staff of the GETCO.
29 Contractor should appoint a driver with valid license according to vehicle. Driver must not be
addicted at any habits. Changing of driver shall be intimated by contractor to concern user of vehicle
in prior. The Driver shall be well experienced with a valid License having minimum experience of
years. Photograph and driving license of the driver should be submitted to the order placing
authority for record.
30 The driver should be fully instructed for the good behavior and to drive the vehicle only in
accordance to the clear directives of Officer-in-charge. In case, if driving is found rough, contractor
shall have to change the driver with genuine one.
31 The contractor shall immunize company’s personnel against any claim arising out of accidents or
misbehavior of the drivers. The vehicle shall be kept properly insured all the time to cover the
comprehensive party risk and simultaneously immunized company on account of likely claims from
public, police deptt. etc.
32 Driver shall be preferably below the age of 40 years and never above 55 years. The lodging and
boarding of driver shall be born by contractor.
33 Rates for excess Km travelled by hired vehicle, beyond 3000Kms: Rates for excess Km travelled
by hired vehicle, beyond 3000Km’s per month is admissible occasionally, with written permission
of Circle head.
34 Any excess travel of vehicle beyond 3000Km’s by the officer in-charge of the vehicle shall be under
the written/verbal approval of Circle head and the same shall be regularized by an office note giving
clear reasons for travelling beyond stipulated Km’s.
Seal & Signature of Bidder
35 During the period of maintenance, breakdown of the vehicle, when the vehicle may not be sent,
the contractor will have to send another vehicle of same or higher class and model year. In case
of failure to meet this condition, another vehicle shall be hired by the GETCO from the market at
the prevailing market rates and difference of amount paid, if any, shall be recovered from the
contractor’s bill.
36 The contractor shall follow all rules and regulations pertaining to the vehicle and its
running/working such as RTO, traffic, etc. scrupulously. Any consequences arising due to non-
observance of any such rules shall be borne by the contractor.
37 The vehicle to be deployed shall be inspected by authorized representative of GETCO at any time
during period of contract & if any defect is noticed, it should be rectified by the contractor. GETCO
shall have right to reject vehicle if condition of vehicle is not satisfactory. In case of breakdown of
vehicle or in case of a vehicle not acceptable to GETCO the contractor will immediately replace the
same by good one within shortest time (say within 1 hour only). Failure to replace the vehicle will
entitle GETCO to impose penalty equivalent to the average daily hiring charges for that period or
actual expenditure done whichever is higher for the period, for which vehicle is under breakdown
and not been accepted by GETCO.
38 In case of accident to the vehicle, the driver or occupants of the vehicle at the time of the accident,
the whole and sole responsibility of vehicle owner/ the contractor during accident to pay
compensation or damages to the persons, involved as per law or Act and the GETCO will not be
responsible for any claim on this account.
39 Conditional tender will not be accepted and straight away be rejected.
40 The contractor is bound to furnish his rate justification in the form of rate analysis, if asked.
41 For participation in tender, the ownership of vehicle is not necessary. Contractor can provide third
party’s vehicle. In such case , bidder shall have to execute the agreement binding that the whole
responsibility about any risks shall pertain to him & not to third party( enclosed h/w ). The provided
third party vehicle shall be same throughout the contract period. In special case, only one time
change of vehicle shall be allowed, meeting all the terms of contract & on taking prior approval of
competent authority.
42 Failing to provide vehicle as per offer and required documents and proof EMD / SD paid by the
contractor shall be forfeited.
43 If the vehicle is released or used at or after 01.00AM ( Midnight) , it will be considered as night halt
and paid accordingly and overtime charges will not be payable.
44 The Contractor shall make his own arrangement for the boarding and lodging of his driver , agents
45 Vehicle must be provided as per documents submitted with the tender. No deviation will be allowed.
46 It will be the responsibility of the contractor to ensure tools, tackles, torch and First-Aid Kit, mobile
charging facility to be made available in every vehicle.
47 Bidder must quote petrol/ diesel prices on the basis of prevailing 15 days before the due date of
tender. This basic rate shall be indicated in the offer with documentary proof.
48 The vehicle should be up to date, with good clean covers and shall be washed at regular intervals
on weekly basis.
49 On the receipt of the LOI, for registered vehicle firm shall be required to submit all the original
documents of vehicle viz. R.C Book, Vehicle Insurance Certificate, Road permit, Vehicle fitness
certificate for verification at Jambuva Circle office along with photocopy of the all vehicle
documents.On verification of the documents and submission of SD , detailed Work order shall be
50 On receipt of the work contract, successful bidder shall have to submit driving license,
Medical fitness certificate (physical fitness), Eye test ( Colour vision) of driver engaged for
subjected work and all vehicle documents to respective S/S In charge and Division office.
51 In case of firm is providing new vehicle for hiring vehicle, firm shall have to submit all the original
documents of vehicle as stated above for verification at Jambuva Circle office along with photocopy
of the all vehicle documents, on registration of vehicle. Rs. 5000/- deposited against new vehicle
will be refunded only after verification of the original documents. On receipt of SD , detailed work
order shall be issued.
52 The GETCO is state transmission utility. The function of the organization is to supply quality and
uninterrupted power. Maintain an efficient power transmission system. As a part of that, Contractor
has to allow carrying tools, tackles, testing kit etc. in vehicle along with the staff as per E.I.C. and
instruct driver to act accordingly.
53 There shall be mobile charging provision in vehicle.
Seal & Signature of Bidder
54 The vehicles intended to be placed for hiring must have the following documents completed in all
respects and produced to Engineer In charge for verifying:
• Copy of Vehicle Insurance certificate covering period up-to-date.
• Copy of Vehicle Registration certificate book with tax paid up-to-date .
• Copy of Fitness Certificate
• Copy of Road (Contract carriage) permits
• Any other documents relevant relating to hiring of vehicle.
• Registration as “MAXI / TAXI / GOODS VEHICLE ” as applicable
• Copy of Road Tax
• Copy of Pan card
• Copy of power of attorney as the case may be.
• Copy of partnership deed if any.
• P.F. Registration (for engaging of driver) or self-declaration undertaking on stamp paper of
Rs.50/- in case of self driving with Notarize certificate (Form attached)
• GST registration
• In case of providing third party’s vehicle bidder shall have to execute the agreement
55 The contractor shall make his own arrangements for the Boarding and lodging of his drivers, agents
and servants at anywhere in the state of Gujarat.
56 The vehicles when in service shall have to be parked at the GETCO’s premises or as near as the
57 The contractor shall ensure that representative on his behalf is deputed by him to keep in touch
with the Engineer with regard to detailing of vehicles, providing arrangements for substitutes in
case of any vehicles going off road looking after to general need of vehicle.
58 The contractor shall also make his own arrangements for refueling, repairs and maintenance of his
vehicle and provide other vehicle during maintenance or repair period with all above-mentioned
59 The contractor must follow all the rules, regulations and implementation of the labour laws relating
to engagements of persons by him.
60 The vehicle once inspected and approved by the Engineer for hire shall not be changed or
substituted by the contractor except on orders from the Engineer –in-charge or on becoming
defective/off road due to accident, breakdown, etc. In such an event, the contractor shall give
immediate intimation to the Engineer. Where a change of vehicle is likely to last for more than one
week prior approval of this office shall have to be taken.
61 The speedometers of the vehicles must be maintained with full accuracy and in working
condition/order at all times. Any defect noticed therein must be rectified at the earliest in a period
not exceeding two days. Till such time, the meter starts working; the KMs. of journeys for various
places shall be decided by the users/Engineers based on the road maps or the basis of previous
62 The security deposit shall be refunded to successful bidder only after satisfactory completion of the
contract or on its termination by the GETCO due to its own reasons. The GETCO reserves the
right to recover any dues, outstanding against the contractors, from the Security Deposit or towards
any loss caused to the GETCO owing to negligence or default of the contractor, his servants or
agents. The refund shall be done only on production of No Objection Certificates of concerned
63 The rates quoted by the bidder in the schedule of rates must include all charges of every type such
as fuel, taxes, and levies maintenance / repairs, driver or contractor’s servant/agent wages, service
64 The contractor shall provide standby vehicle(s) to ensure prompt substitute arrangements should
any hired vehicle go off road or breaks on the way.
65 In case any vehicle remains absent or fails to report for duty or a vehicle if provided, as a substitute
is not in an acceptable condition, the GETCO shall recover penalty at the rate specified in relevant
clause. And in case of an un-acceptance of substituted vehicle, any journey covered by it may also
be disallowed apart from recovering penalty as if the vehicle is ‘absent’.
66 If the contractor fails to execute the order successfully, the order will be got completed through
other agency and if required to pay higher rates, in that cases, difference of rates will be recovered
from the contractor.
67 In technical bid, if tenderer will produce quotation of new vehicle then tenderer has to pay Rs.5000/-
by RTGS in favor of GETCO payable at Jambuva as a Deposit with giving consent that he will
produce required documents for new vehicle. If he will not able to produce new vehicle’s document,
Seal & Signature of Bidder
deposit of Rs.5000/- paid as above will be forfeited and if he will produce the documents then
deposit Rs.5000/- will be refunded.
68 Hired vehicle shall be fitted with airbag for the person occupying the front seat, other than
The Contractor shall follow and comply with all GETCO Safety Rules, relevant provisions of applicable
laws pertaining to the safety of workmen, employees, plant and equipment as may be prescribed from
time to time without any demur, protest or contest or reservations. In case of any discrepancy between
statutory requirement and GETCO Safety Rules referred above, the latter shall be binding on the
Contractor unless the statutory provisions are more stringent.
1. In case if any safety related fatal Elect. / Mech. accident occurred to any employee of agency or
outsider due to negligence or non-compliance of GETCO safety norms then in addition to the
compensation and liability as per statutory requirement, contractor / agency shall be penalized as
Sr. No Amount of Contract in Rs. Penalty amount
1 Up to 1 Lac Rs.5000/- plus applicable taxes ( if any)
2 Above1 Lac to 10 Lacs Rs.40000/- plus applicable taxes ( if any)
3 10 to 100 Lacs Rs.100,000/- plus applicable taxes ( if any)
4 > 100 Lacs 1.0 % plus applicable taxes ( if any)
1. The contractor shall inform concerned Ex. Engineer Const/TR in writing within 24 hours of fatal/Non-
fatal accident occurred to human being.
2. The GETCO investigating officer findings in to accident shall be final and binding to the contractor
3. Safety Requirement:
i) Kick off Meeting exclusively for safety shall be done in each contract in presence of contractor’s site
in charge and supervisor. Safety document shall be handed over and vital safety norms and key
points of safety related to project shall be explained and recorded for commitment by erection
contractor. Such records are mandatory for clearing first erection bill.
ii) During site visit by GETCO official of Executive Engineer and above rank, the following checks
during execution of work shall be covered.
I. Safety equipment available and utilize.
(b) Safety belt.
(c) Safety shoes.
(d) Live line Voltage detector
II. Safety procedure adopted.
(a) Permit to work
(b) Earthing at the place of work.
(c) Adequate supervision.
III. T & P physical Check. (Healthiness and Quality)
(b) Wire rope and sling.
(c) Earthing rod
iii) If above-mentioned safety requirements found violated in any of the above three conditions shall
attract penalty of Rs.1000/- plus applicable taxes ( if any) per occasion. (Max.Rs.3000/--for violation
of three conditions)
iv) During subsequent visit, if violation is found, then double penalty plus applicable taxes ( if any) shall
be deducted from the bill of the Contractor/Agency.
Seal & Signature of Bidder
Seal & Signature of Bidder
તારીખ _______________ ના રોજ અથવા ત્યારબાદ ના સમયગાળા દરવમયાન GETCO તથા GUVNL ની કોઇપણ સુંિગ્ન કું પની
Seal & Signature of Bidder
UNDERTAKING CUM INDEMNITY BOARD
(Non Judicial Stamp Paper of Rs. 300/-)
Know all men by these present that we, M/s _________________________________ (name of company)
having principal place of business at address
contractor” which expression shall where the context so admits, include their heirs, executors,
administrators and legal representatives, successors etc.) through our authorized representative Shri / Mrs.
________________________ hereby entered into a contract with Gujarat Energy Transmission
Corporation Ltd., (hereinafter called “GETCO”, which expression shall where the context so admits, include
their executors, administrators, legal representatives, successors etc.) vide A/T No.
rate contract basis, whose details are specified in the said A/T.
The contractor through this Undertaking cum Indemnity Bond indemnifies GETCO against any
responsibility toward loss / accidents, damages, to the contractor’s staff / equipment or any other person /
vehicle, due to non-observance of safety measure or non-compliance of any other statutory or
non-statutory liabilities. The contractor undertakes that in case he / she sub-lets the contract to any third
party or provide the vehicle to GETCO wherein he is not the owner of that vehicle/s, then also, the
contractor shall be responsible to comply all statutory / non-statutory liabilities, safety measures & other
liabilities of such third party owners of vehicle. The contractor on behalf of himself and also on behalf of
third party ownership of vehicle, indemnifies GETCO that in case of any financial or non-financial
implications onto GETCO, then Contractor shall make good for it and will bear all the implications, burdens
(financial / non-financial liabilities) to its effect, throughout the contract period.
THIS BOND IS MADE AND EXECUTED ON THIS __________ DAY OF _________ AT
_______________ in presence of witness.
(Signature of Contractor / POA HOLDER)
Seal & Signature of Bidder
SAFETY CUM INDEMNITY BOND
(On Non-judicial Stamp paper of value not less than Rs.300.00)
KNOW ALL MEN BYTHE SEPRESENTS that we,__________________________________By
this SAFETY CUM INDEMNITY BOND Executed on this ____________ Day _____of 2026 .We
Having Registered Office_________________________________________________ (here in
after called “THE CONTRACTOR” which expression shall mean and includes my/our heirs,
executors, administrators and legal representatives, successors and permitted assigns)do
hereby binds myself/ ourselves and also our company/firms after having the power to bind by
this promise and undertaking in favour of the Gujarat Energy Transmission Corporation Limited
(GETCO),Vadodara State Transmission Utility under The ElectricityAct,2003 having its
registered office at Sardar Patel Vidyut Bhavan, Racecourse, Vadodara.(here in after called as
GETCO, which expression shall mean and include its legal representative, administrators as
signs)has agreed under the terms and conditions of the contract
contract of the value of Rs ________________interalia on Production of Safety cum Indemnity
We do hereby undertake and agree to Indemnify and keep Indemnified GETCO from time to
time to the extent of Rs. ____Rupees only against any losses or damages,
costs, charges and expenses caused to or suffered by reason of the CONTRACTOR while
Project, R&M, O&M work including work carried out by outsourcing agency, failing to take proper
care or not complying the guidelines given hereunder as per Annexure-A and instructions which
may be given from time to time during the continuance of the contract and we further undertake
to unconditionally pay the amount claimed by the GETCO on demand and without demur to the
extent aforesaid.
Whereas the CONTRACTOR has/ have been awarded to execute the job/works under order no.
by the GETCO after having observing necessary formalities, the details of which is described in
dated_______________and whereas the said job/works will be /likely to be done in places
covered under Employees’ State Insurance Act, 1948 (ESI) and /or the Workmen Compensation
Act,1923 and /or other laws relating to the Labour Management and Welfare Act. (Respective
And whereas according to the condition of the Contract the CONTRACTOR is under obligation
to execute this Safety cum Indemnity Bond before the commencement of actual execution of
Now the indenture witnesses that I/We the CONTRACTOR do hereby undertake to follow the
guidelines as per Annexure-A prepared by the GETCO.
Further we the CONTRACTOR agree that the GETCO shall be sole judge of and as to whether
there has been any breach of the guidelines as per Annexure-A of this bond and as to the extent
of the loss, damages, costs, charges and expenses caused to or suffered by the GETCO.
We the CONTRACTOR further agree that our liability under this bond shall not be discharged
because of the change in the constitution of the GETCO or for the extension of the time limit or
for any other reason.
We the CONTRACTOR further agrees to the given terms and conditions:
a. That the CONTRACTOR undertakes /undertake to indemnify and keep harmless the GETCO
from all claims, actions, proceedings and risk, damage danger to any person whether belonging
or not belonging to the. CONTRACTOR.
b. That the CONTRACTOR shall keep harmless the GETCO from all claims, compensation,
damages any proceedings in respect of any of its employee / workmen under the Workmen
Compensation Act or any other laws for the time being in force.
c. That, if during the course of execution of work as stated in the contract order mentioned
hereinabove issued by the OBLIGEE, it is found that the CONTRACTOR has not complied with
guidelines as per Annexure-A or terms and conditions / formalities within the meaning of
Employees’ State Insurance Act,1948 (ESI) or Workmen Compensation Act 1923 or any other
laws relating to the Labour Welfare for the time being in force, and also has not observed the
Seal & Signature of Bidder
safety norms in accordance with the law prevailing at the place of work/job to the satisfaction of
the GETCO, the GETCO shall have the right to stop the execution of work/job and the period of
such stoppage shall not be taken into account for the calculation of the total period of completion
for which the CONTRACTOR is responsible to complete the work/job and it will be deemed that
discontinuance was due to default of the CONTRACTOR .
d. That, if any time, due to exigency, GETCO as the Principle Employer, becomes liable to pay
any such compensation mentioned hereinabove, whether on failure of the CONTRACTOR or for
any other reason, the GETCO shall have the right to recover the said amount from any amount
receivable by GETCO or any bank guarantee deposited or anything payable whether in
connection with this contract or other contract by the CONTRACTOR to the OBLIGEE.
e. That the CONTRACTOR is/are aware and accept that for the persistent or repeated violation
of any guidelines as per Annexure-A and terms and conditions mentioned in this Safety cum
Indemnity Bond, GETCO shall have right to terminate the contract of work issued to the
f. In case if any safety related fatal Electrical / Mechanical accident occurred to any employee of
agency or outsider due to negligence or non-compliance of GETCO safety norms then in addition
to the compensation and liability as per statutory requirement, contractor / agency is hereby
agreed to pay the penalty amount as given below:
Sr. Amount of Contract in Penalty amount
1 Up to 1Lac Rs.5000/- plus applicable taxes ( if any)
2 Above 1 Lac to 10Lacs Rs.40000/- plus applicable taxes ( if any)
3 10 to 100 Lacs Rs.100,000/- plus applicable taxes ( if any)
4 >100Lacs 1.0%of contract value plus applicable taxes ( if any)
g. I/We the CONTRACTOR here by confirm that in case of any dispute/ difference for settlement
of claims under this Safety Cum Indemnity bond the courts in Gujarat State wherever job/ work
is performed or as per GETCO norms shall have the jurisdiction to decide the rights & liabilities
of the parties while adjudicating the matter of claims under this Safety Cum Indemnity Bond.
h. This Safety cum Indemnity Bond shall continue and hold good until it is released by the
GETCO in Writing on the CONTRACTOR’s application after the Contractor has discharged all
his obligations under the order mentioned hereinabove and submitted a “NO DEMAND
CERTIFICATE” from the GETCO under the said order. The Safety cum Indemnity Bond shall be
valid for a CONTRACT PERIOD and renewable thereof (Claim Period).
i. This Safety cum Indemnity Bond and the guidelines as per Annexure-A herein contained are
in addition to And not by way of limitation or substitution for any other guarantee, indemnities
Hereto before given to the GETCO by the CONTRACTOR and this indemnity does not
Revoke or limit such indemnities or guarantees. IN WITNESS WHEREOF the Parties hereto
have executed this indenture the day the year First hereinabove written.
(Signature with seal of The CONTRACTOR)
In the presence of:
Seal & Signature of Bidder
PROFORMA FOR CONTRACT AGREEMENT
(Non Judicial Stamp Paper of Rs. 300/-)
This Agreement is made at BARODA the_____________ day of ___________ in the Christian Year Two
thousand twenty six between M/s. _____________________________________ (address of office)
________________ (hereinafter referred to as “THE CONTRACTOR” which expression shall unless
excluded by or repugnant to the contract include its successors or permitted assigns) of the ONE PART
and the Gujarat Energy Transmission Corporation Ltd, having their Head office at VidyutBhavan, Race
Course, Baroda 390 007 (hereinafter called “The GETCO” which expression shall unless excluded by or
repugnant to the context include its successors or assigns) of the other part.
WHEREAS the aforesaid GETCO has accepted the tender of the aforesaid contractors for
hereinafter called “the works” and more particularly described and enumerated or referred to in the
specification, terms and conditions prescribed in the order letter, covering letter and other letters and
schedule of price which for the purpose of identification have been signed by Shri
____________________________________ on behalf of the contractors and by
____________________________________ on behalf of the GETCO, a list whereof is made out in the
Schedule hereunder written and all of which said documents are deemed to form part of this contract and
included in the expression “The works” wherever herein used, upon the terms and subject to the conditions
hereinafter mentioned.
AND WHEREAS THE GETCO has accepted the tender of contractors for the construction of the said works
upon the terms and subject to the conditions herein mentioned.
NOW THIS AGREEMENT WITNESSESS AND IT IS HEREBY AGREED AND DECLARED THAT.
1. The contractors shall do and perform all works and things in this contract mentioned and described or
which are implied therein or there from respectively or are reasonably necessary for the completion of
the works as mentioned and at the times, in the manner and subject to the terms and conditions and
stipulations contained in this contract, and in consideration of the due provision, executions, supply
and completion of the works agreed to by the contractor as aforesaid the Board doth hereby covenant
with the contractor to pay all the sums of moneys as and when they become due and payable to the
contractors under the provisions of the contract. Such payment to be made at such times and in such
manner as is provided by the contract.
2. The conditions and covenants stipulated here-in-before in this contract are subject to and without
prejudice to the rights of the Board to enforce penalty for delays and / or any other rights whatsoever
including the right to reject and cancel on default or breach by the contractor of the conditions and the
covenants as stipulated in the general conditions, specifications, forms or tender schedule etc.
attached with GETCO’s Order No.
The contract value, extent of supply & erection works, delivery dates , specifications and other relevant
matters may be altered by mutual agreement and if so altered shall not be deemed or construed to
mean or apply to affect or alter other terms and conditions of the contract and the general conditions
and the contract so altered or revised shall be and shall always be deemed to have been subject to
and without prejudice to said stipulation.
List of documents forming part of the contract:
2 GETCO’s Tender Specification No. ______________________ and contractor’s offer opened on dated
4 Contractor’s acceptance of order vide letter no. _______________.
5 Contractor’s Partnership Deed dtd. ________________.
6 Contractor’s Power of Attorney / Board Resolution authorizing person to sign on behalf of Firm.
Seal & Signature of Bidder
In witness whereof the parties here to have set their hands and seals this day and month, year first
1) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
For and behalf of M/s. __________________ (Signature)
In the presence of (Full Name, Address and Signatures)
1) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
for and on behalf of Gujarat Energy Transmission Corporation Ltd Circle office Jambuva.
In the presence of name, Full address and Signature:
Seal & Signature of Bidder
DETAILS OF EARNEST MONEY DEPOSIT ATTACHED
S.No. Description
1 Earnest Money Deposit
Earnest Money Deposit of Rs._______________/-, submitted in the form of Demand Draft/
Banker’s Cheque/ RTGS drawn on______________________________________Bank,
______________________ Branch, bearing DD/BC/ RTGS No. _________________
dated ________________ is attached herewith.
2 Tender Document Fee
Tender Document Fee of Rs.__________________/-, submitted in the form of Demand
Draft/ Banker’s Cheque/ RTGS drawn
Branch, bearing DD/BC/ RTGS No. _________________ dated ____________________
is attached herewith.
3 New vehicle deposit
Deposit for new vehicle Rs.__________________/-, submitted in the form of Demand Draft/
Banker’s Cheque, RTGS drawn on______________________________________Bank,
______________________ Branch, bearing DD/BC/RTGS No. _________________
dated ____________________ is attached herewith.
Seal & Signature of Bidder
BIDDER’S DETAILS OF PERSONNEL
3 Firm Type (Proprietary/ Partnership)
4 Contact Person Name and Designation
5 Qualification
6 Professional Experience
8 P.F. Registration No
9 GST Registration No
10 Contract Details
Note: All the correspondence, queries etc., will be asked on above E-Mail only. Bidder
is responsible to check and operation of e-mail ID.
Sign & Signature of Bidder
Seal & Signature of Bidder
In connection with the above subject and reference I/ We confirm the following:
1. I / We, the under signed have read and examined the Tender Specifications in
tender mentioned under reference along with the General/ Commercial terms and
2. I / We, declare that our Technical Bid is strictly in line with the Tender specifications
(except the deviations shown in Annexure of Technical Deviations.
3. Further, I / We also agree that additional conditions / deviations, if any, found in
the tender terms & conditions (except reference indicated under Annexure iv this
tender document), our offer shall be out rightly rejected without assigning any
reason thereof.
NOTE: ALL THE DOCUMENTS SHOULD BE PROPERLY FILED AND SHOULD BE
GIVEN FLAG MARKING FOR IDENTIFICATION.
Sign & Signature of Bidder
Seal & Signature of Bidder
(Strike off whichever is not applicable)
This is to declare that Mr/Ms. __________________________________, employee of
GETCO at _____________________(place), is related to our
This is to declare that none of the Proprietors/ Partners/ Directors are having any
relatives employed or working with Gujarat Energy Development Agency at any of its
offices or its parent Department i.e. Energy & Petrochemicals Dept., Govt. of Gujarat.
Sign & Signature of Bidder
Seal & Signature of Bidder
DEVIATION SHEET
Any deviations offered from the terms and conditions of the Offer should be clearly specified
below in this sheet. If there are no deviations offered, it should be clearly mentioned on this
Deviation offered to Chapter No, Clause No. of the Deviation offered
tender document
Please fill up the details below to evaluate the capacity of contractor.
SN Contract Place Contract Contract Period Order No Vehicle
Vehicle No Registered on
Circle/Division/
From To the name of
note: Existing contractor fill the details of all existing running contract details invariably with GUVNL
and its subsidiary companies i.e. GETCO, GSECL, MGVCL, DGVCL, PGVCL, UGVCL.
Seal & Signature of Bidder
PRICE BID ( To be submitted on line through n-code only )
Name of work: Hiring of Petrol / Diesel driven, A.C., SUV/MUV , Nine seater (8+1) and Nine plus seater close
body vehicle for 12 Hrs /day for 3000 KM / Month for 24 Months on ARC basis for 132KV Vasedi S/S under Bodeli
AM Division under Jambuva Circle.
Sr. Description QTY. RATE Unit AMOUNT
1 Hiring of Petrol / Diesel driven, A.C., 24 60,055.00 Month
SUV/MUV , Nine seater (8+1) and Nine plus
seater close body vehicle for 12 Hrs /day for
3000 KM / Month for 24 Months on ARC basis
for 132KV Vasedi S/S under Bodeli AM
Division under Jambuva Circle.
2 Rate for extra Km travelled more than Above Rs.10.50 per Per Km Fixed
3000km during the month ( Rs. ) 3000km KM for extra
3 Rate for Extra Hour - over time charges per Beyond Rs.100.00 Per Hr. Fixed
hour beyond 12 hrs. (Rs.) 12 hrs. per hour for
4 Rate for Night halts per Night ( Rs. ) Per Night 300.00 Per night Fixed
Estimated Cost Schedule-B (B)
Rs. Fourteen lakh Forty one thousand Three Hundred Twenty only( excl. GST )
1) Bidder must quote diesel/petrol prices on the basis of prevailing 15 days before the due date of tender. This
basic rate shall be indicated in the offer with documentary proof.
2) Hired vehicle shall be fitted with airbag for the person occupying the front seat, other than the driver.
3) Providing FASTTAG Facility:
Contractor has to submit the statement with monthly RA bill for reimburse the FAST TAG
Keep the minimum balance in Fast Tag Account as per rules & recharge regularly to avoid penalty or
stuck up in queue.
If due to not maintaining minimum balance or any other reason if the penalty is collected by toll booth,
then only basic amount of toll fee shall be reimbursed. Penalty/ higher rate amount is the responsibility
I / We am / are willing to carry out work at _________% above / below ( in words
__________________________________% above / below) the estimated rates mentioned above.
Amount of Tender work out as under.
(1) Estimated cost :
(3) Net Tender Amount in figure (1±2):
Seal & Signature of Bidder
[Net Tender Amount Rs. (In words)
(4) Taxes & Other Charges: as Shown in below mentioned table total Rs.
Sr. Name of Tax/ Particular Amount In Rs:
(5) Unit End Cost price in figure (Total of (3+4)) : Rs. ______________
(6) Basic Rate of Petrol/ Diesel (Certifiate must be attached)=________ Rs/ Ltr as on date
1. Tendered should quote rate in figures and words including all charges, taxes etc in above / below
of total estimated cost.
2. Tender without EMD will not be entertained.
3. The contractor quoting for the tender is deemed to have gone through General Terms &
Conditions of this work / Contract booklet / Special conditions and same will be treated as binding
4. The contractor has to give his letter for below or above for the total amount indicated against item
4. The contractor has to give his letter for below or above for the total amount indicated against item
no. 1 only. The rates against item no. 4,5 of the schedule is unilaterally decided by GETCO and
shall not under go any change. However the item no 4,5 shall be subject to variation as per
relevant clause of general specification ( i.e. variation in petrol/diesel price.)
5. The prices quoted by the Contractor should be exclusive of service tax. The same will be
reimbursed as applicable only against submission of documentary proof of payment of service tax
submitted to concern office along with monthly bill.
Signature & Seal of Contractor.
Seal & Signature of Bidder
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Technical bid n-43.pdf
Download all tender documents and submit your bid