Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | LI₹7.6 LAccepted-AOC PALAKKAD | KERALA | 678001 | LI | Accepted-AOC lowest amount | |
| 2 | Rejected-Technical VALLIYAR AROOR P O | AROOR | KERALA | - | Rejected-Technical L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | Augustine Dixon.E L2 | BIJO KURIAKOSE L1 | Febin V G L3 |
|---|---|---|---|---|---|---|
| 1.00Anganwadi Compound Wall Construction | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 25.6 | cum | 355.04 ₹9,089.02 | 345 ₹8,832 Lowest | 360 ₹9,216 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 54.4 | cum | 8,235.02 ₹4,47,985.09 | 8,050 ₹4,37,920 Lowest | 8,350 ₹4,54,240 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 8 | sqm | 752.96 ₹6,023.68 | 730 ₹5,840 Lowest | 770 ₹6,160 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2 | cum | 9,834.39 ₹19,668.78 | 9,625 ₹19,250 Lowest | 9,970 ₹19,940 |
| 1.00 | 5.22.1:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars | 160 | kg | 110.09 ₹17,614.4 | 105 ₹16,800 Lowest | 112 ₹17,920 |
| 1.01 | OD272318/2025-2026:Filling with contractors own earth cut and conveyed from outside (excluding rock) in layers not
exeeding 20 cm in depth,consolidating each deposited layers by ramming and watering lead up
to 1.50m including cost of earth and actual conveyance etc complete. | 57 | cum | 1,169.57 ₹66,665.49 | 1,140 ₹64,980 Lowest | 1,185 ₹67,545 |
| 1.01 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 12.95 | cum | 7,613.26 ₹98,553.65 | 7,450 ₹96,440.25 Lowest | 7,714 ₹99,857.73 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 217.5 | kg | 176.1 ₹38,301.75 | 172 ₹37,410 Lowest | 179 ₹38,932.5 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 131.5 | sqm | 364.95 ₹47,990.93 | 355 ₹46,682.5 Lowest | 370 ₹48,655 |
Tender Value
₹7.6 L
EMD Value
₹19,045
Closing Date
29 Sept 2025, 4:00 pmClosed
ASSISTANT ENGINEER
OFFICE OF THE ASSISTANT ENGINEER
Aroor Grama Panchayath 2025-26- S 0 418 / 26 - C O N S T R U C T I O N O F COMPOUND WALL IN ANGANAWADI NO 17 AND SITE CLEARING IN WARD 06
2025_LSGD_798258_1
CELSGD/TR/107551/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
120 days
AROOR GRAMA PANCHAYATH
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,680
₹19,045
12 Jun 2026
17 Sept 2025
30 Sept 2025
17 Sept 2025
29 Sept 2025
17 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1322876.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .