Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.6 Cr+₹62.5 L (32.0%)Admitted-Finance 02 22 2ND FLOOR 100 FEET RING ROAD 6TH BLOCK 3RD PHASE BSK 3RD STAGE BSK 3RD STAGE BANGALORE KARNATAKA 560085 INDIA | BENGALURU URBAN | KARNATAKA | 560085 | ₹2.6 Cr+₹62.5 L (32.0%) | L2 | Admitted-Finance |
| 3 | L3₹3.3 Cr+₹1.3 Cr (66.7%)Admitted-Finance | ₹3.3 Cr+₹1.3 Cr (66.7%) | L3 | Admitted-Finance |
| 4 | L4₹4.0 Cr+₹2.0 Cr (105.0%)Admitted-Finance MAGNUM CHAMBERS VV DEMPO MARG NORTH GOA GOA NORTH GOA GOA 403001 UDYAM GA 01 0000406 | NORTH GOA | GOA | 403001 | ₹4.0 Cr+₹2.0 Cr (105.0%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical AS PER TNC REPORT |
Tender Value
Refer Docs
EMD Value
₹4.2 L
Closing Date
31 Aug 2020, 3:00 pmClosed
Mr. Harendra Goyal
Outsourcing dept., 6th floor, Service Block, Mazagon Dock Shipbuilders Limited, Dockyard Road, Mumbai-400010
RATE CONTRACT FOR HIRING OF SERVICES FOR DETAILED DESIGN ACTIVITIES FOR OUTFITTING OF P15B SHIPS AT MDL
2020_MDL_82649_1
8000000917
Open Tender
Miscellaneous Services
Service
1460 days
Outsourcing dept., 6th floor, Service Block, Mazag
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹4.2 L
Yes
8 Oct 2020
6 Aug 2020
1 Sept 2020
6 Aug 2020
31 Aug 2020
6 Aug 2020
Amount
Upgradation / Asfitted of A0 Composite Compartment Layout Drawing along with Bill of Material (BOM) entries in SAP as mentioned in scope of work.
Upgradation / Asfitted of A1 Composite Compartment Layout Drawing along with Bill of Material (BOM) entries in SAP as mentioned in scope of work.
Upgradation / Asfitted of A2 Composite Compartment Layout Drawing along with Bill of Material (BOM) entries in SAP as mentioned in scope of work.
Generation of A3 Size Manufacturing and Installation Drawing (Ventilation and Piping Drawings) along with Bill of Material (BOM) entries and Uploading in SAP as mentioned in Scope of Work.
Generation of A4 Size Manufacturing and Installation Drawing (Ventilation and Piping Drawings) along with Bill of Material (BOM) entries and Uploading in SAP as mentioned in Scope of Work.
Generation of A3 Size Seat/Rack/Furniture Drawing along with Bill of Material (BOM) entries and Uploading in SAP as mentioned in Scope of Work.
Generation of A4 Size Seat/Rack/Furniture Drawing along with Bill of Material (BOM) entries and Uploading in SAP as mentioned in Scope of Work.
Conceptia Software Technologies Pvt. Ltd.
ISHIP DESIGN LLP
Buoyancy Consultants and Engineering LLP
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .