| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 CrAccepted-AOC | ₹18.4 Cr | L1 | Accepted-AOC L1 |
Tender Value
₹17.8 Cr
EMD Value
₹5 L
Closing Date
1 Apr 2023, 4:00 pmClosed
Superintending Engineer
Keral Water Authority P H Circle, Muvattupuzha
Supply and Laying Gravity Mains and Clear Water Pumping mains Construction of GLSR at various zones Supply and laying Distribution System and Providing FHTC to various Zones High Level Zone
2023_KWA_567953_1
128/2022-23/SE/PHC/MVPA
Open Tender
Civil Works - Water Works
365 days
P H Circle, Muvattupuzha
As per NIT
8 documents required · 8 mandatory
₹16,540
₹5 L
P H Circle, Muvattupuzha
18 May 2023
20 Mar 2023
3 Apr 2023
20 Mar 2023
1 Apr 2023
20 Mar 2023
20 Mar 2023 - 24 Mar 2023
25 Mar 2023
Amount
Supply and laying of Clear Water Pumping Mains and Gravity main
100.98.115:Supply of DI K9 Pipe Conforming to IS 8329/2000, 100mm Dia.
100.98.116:Supply of DI K9 Pipe Conforming to IS 8329/2000, 150mm Dia.
100.98.457:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 80mm.
100.98.458:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 100mm.
100.98.440:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 25mm.
100.98.441:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 40mm.
100.98.429:Supply of CI Non Return Valve, Conforming to IS 5312 Part I - 1984, PN 1.6, Size 100mm.
100.98.431:Supply of CI Non Return Valve, Conforming to IS 5312 Part I - 1984, PN 1.0, Size 150mm.
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock.
100.2.7:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited.
100.1.13:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock where Blasting is Prohibited.
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
OD109840/2022-2023:Dismantling manually / by mechanical means and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge: Bituminous road
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
100.14.1:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 100mm diameter Ductile Iron Class K-9 Pipes.
100.14.2:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 150mm diameter Ductile Iron Class K-9 Pipes.
18.68.1:Providing and laying D.I specials of class K - 12 suitable for push - on jointing as per IS : 9523 :Upt 600 mm dia
18.70.1:Providing push - on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket:100 mm dia pipes
18.70.2:Providing push - on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket:150 mm dia pipes
18.30.2:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:100 mm diameter pipe
18.30.4:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:150 mm diameter pipe
OD77296/2022-2023:Labour for cutting D.I. pipe with steel saw. 100 mm diameter D.I. pipe
OD77297/2022-2023:Labour for cutting D.I. pipe with steel saw. 150 mm diameter D.I. pipe
100.35.1:Testing 100mm DI/CI pipeline with potable water to the required test pressure 100 mm dia
100.35.2: Testing 150mm DI/CI pipeline with potable water to the required test pressure 150 mm dia Observed Data derived from item no.1018 of PHED DATA
100.32.1:Conveying and fixing C. I. Single Acting Air Valve of approved quality with bolts, nuts, rubber insertions etc., complete, but excluding the cost of air valve (tail pieces, if required, will be paid separately): 25mm Single Acting Air Valve.
100.32.2:Conveying and fixing C. I. Single Acting Air Valve of approved quality with bolts, nuts, rubber insertions etc., complete, but excluding the cost of air valve (tail pieces, if required, will be paid separately): 40mm Single Acting Air Valve.
100.31.1.1:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 80mm diameter, Class I.
100.31.1.2:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 100mm diameter, Class I.
100.31.1.4:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 150mm diameter, Class I.
100.37.5.1:In situ fabrication of M.S. pipes of size 100mm (I.D.) using 8mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete.
100.37.5.2:Fabricating M.S. flanges of diameter 100mm using 12mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.37.5.3:Cutting 100mm (I.D.) M.S. pipes for making bends and other specials by gas cutting including cost of gas, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.37.5.4:Welding 100mm (I.D.) M.S. pipes for making bends and other specials by gas/electric welding machine including cost of gas and welding rods, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.37.5.5:Grinding cut and weld edges of 100mm (I.D.) M.S. pipes during fabrication work including all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.37.6.1:In situ fabrication of M.S. pipes of size 150mm (I.D.) using 8mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete.
100.37.6.2:Fabricating M.S. flanges of diameter 150mm using 12mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.37.6.3:Cutting 150mm (I.D.) M.S. pipes for making bends and other specials by gas cutting including cost of gas, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.37.6.4:Welding 150mm (I.D.) M.S. pipes for making bends and other specials by gas/electric welding machine including cost of gas and welding rods, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.37.6.5:Grinding cut and weld edges of 150mm (I.D.) M.S. pipes during fabrication work including all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.4:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHot rolled deformed bars
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
OD95717/2022-2023:supply, erection of 100mm Mechanical flow meter of Woltsman type confirming ISO 4046 class B of ARAD/ZENNIER/REYCHEM RPG/ITRON make and shall be tested and certified by FCRI Palakkad and product shall have warranty for at least 2 years -(The rate includes transportation and insurance etc. complete)
OD96069/2022-2023:supply, erection of 150mm Mechanical flow meter of Woltsman type confirming ISO 4046 class B of ARAD/ZENNIER/REYCHEM RPG/ITRON make and shall be tested and certified by FCRI Palakkad and product shall have warranty for at least 2 years -(The rate includes transportation and insurance etc. complete)
Construction of 0.30 LL capacity steel tanks at Kozhipally 1
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD77289/2022-2023:Supplying,coveying & filling sand inside the platform for steel tank
OD77290/2022-2023:Supply,installation and commissioning of a pre-engineered, pre-fabricated, factory manufactured steel storage Water Tank having a capacity of 30000 L (1Nos.) thickness of 0.6 mm, in multiple layers as required for the capacity and height of the tank and multiple-layered PE sheet/membrane for the inner containment liner. The Tank Shell / Body & the Liner material shall be manufactured in a facility certified and compliant to ISO 9001 - 2000 standards. The Tank shall be supplied with access points, penetrations for inlets, outlets, drains and fittings, overflow and drain, high and low water level indicators. All connections to the tanks shall be with flanged or threaded nozzles, placed to the KWA water mains TANK ROOF :The roof of the tank shall be of corrugated Galvalume sheet steel and shall be domed, with heavy- duty Hot-dip Galvanized truss frame for support, and capable of supporting 4-5 persons for maintenance and cleaning and tank shall have an access hatch with cover, on the roof, for operation and Maintenance TANK COVER :Tank covers shall be of approved galvanized vermin proof construction. Roof ends shall be fitted with suitable vermin-proofing tape or other material, to prevent ingress of dust and foreign objects. Covers shall be firmly fixed to the top edge of the tank with galvanized bolts and nuts. LADDERS :Tanks shall be provided with Hot-dip Galvanized ladders internally or externally. External roof supports shall be of an appropriately designed Hot-dip galvanized Steel construction. Tanks shall comply with relevant spill level, air gap and overflow requirements relative to Effective Capacity. All nuts and bolts used for the panels shall be a minimum of 12mm size and hot-dip galvanized/Case hardened. The tank shall have a circular angle fixed around the total circumference of the tanks, at the top, of minimum 2 mm thickness.Tanks shall be properly flushed out with clean water prior to being brought into service TANK DIMENSIONS: The dimensions of the Tank shall be of 3.884m in diameter and 2.9m in height DESIGN LIFE: The tanks shall have a design life of 40 years. TANK CONNECTIONS: Standard design valve outlet connection : i) 100mm CI Flanged valve ii) Overflow connection including an Internal approved bell-mouth shaped bends to maximize the overflow capacity. One no. 100 mm, iii) One (1) scour drain outlet from the floor of the tank with isolation valve. One No. 100mm.TANK LINERS:Tank liners shall be purpose-designed and manufactured and shall comply to AS/NZS 4020 (Appendix A )of 2005 and ANSI/NSF 61 - 2008, Section 5 Certificates of compliance to above standards shall be furnished by the manufacturer of the tanks. Tank liners shall: i) Be factory manufactured to one- piece construction, fabricated from multi-layer PE sheet, certified for potable drinking water, to (ANSI/ NSF 61) and duly UV Stabilized. ii) Be of PE (polyethylene) in multi-layer construction for strength, reinforced with woven scrim industrial fabric to prevent elongation and enhance tensile strength. The total liner material thickness shall be no less than 0.6 mm thick. The tensile strength shall not be less than 2266 N (warp) and 2495 N (weft) and heat sealing strength of 2056 N v) All the liner welded lap joints shall be strengthened with Metallocene encapsulating tape welded over the overlap. vi) The Metallocene tape shall cover and protect the exposed material at the edges of the liner joints to further prevent the ingress of water into the scrim. vii) Liners shall be positively and continuously attached to the top outer edge of the circumference of the tank to prevent entry of water from the runoff from the roof structure. viii) All liners on tanks over 2m in height shall have a continuous intermediate liner support designed out of nylon (or other material)cord, around the circumference of the tank, at vertical intervals corresponding to the level of each ring. ix) The intermediate liner support cords shall be firmly secured to the steel shell at each level, to prevent stress on the liner welded joints, and thereby eliminate possibility of failure CORROSSION PROTECTION. The tank structure shall have a secondary corrosion protection system using sacrificial magnesium anodes. The number of anodes, their location around the tank and the mass of each anode shall be designed for anode replacement frequency of five years. The anodes shall be installed external to the tank and concrete apron with their location marked with a suitably label-Cost for Tank steel with 10years guarantee includes shel l,Steel wall,steel domed roof,Zinc Alum steel',Cost for Poly ethylene infinity liner ,Geo synthetic Fibre withfood grade plastics are used for inside coating and Support Arrangements,Cost for Fabricated items,attachments and accessories like steel ladder,Cost of Fabricated nozzles,over flow nozzles and drain arrangements, Cost for HDG nut and bolts,Freight Charges,Erection Installation and commissioning of tank components.
Construction of 0.40 LL capacity steel tank at Kozhipally 2,Thumbichi and Vazhikinar
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD97345/2022-2023:Supplying,coveying & filling sand inside the platform for steel tank
OD77302/2022-2023:Supply,installation and commissioning of a pre-engineered, pre-fabricated, factory manufactured steel storage Water Tank having a capacity of 40000 L(1Nos.) thichness of 0.6 mm, in multiple layers as required for the capacity and height of the tank and multiple-layered PE sheet/membrane for the inner containment liner. The Tank Shell / Body & the Liner material shall be manufactured in a facility certified and compliant to ISO 9001 - 2000 standards. The Tank shall be supplied with access points, penetrations for inlets, outlets, drains and fittings, overflow and drain, high and low water level indicators. All connections to the tanks shall be with flanged or threaded nozzles, placed to the KWA water mains TANK ROOF :The roof of the tank shall be of corrugated Galvalume sheet steel and shall be domed, with heavy- duty Hot-dip Galvanized truss frame for support, and capable of supporting 4-5 persons for maintenance and cleaning and tank shall have an access hatch with cover, on the roof, for operation and Maintenance TANK COVER :Tank covers shall be of approved galvanized vermin proof construction. Roof ends shall be fitted with suitable vermin-proofing tape or other material, to prevent ingress of dust and foreign objects. Covers shall be firmly fixed to the top edge of the tank with galvanized bolts and nuts. LADDERS :Tanks shall be provided with Hot-dip Galvanized ladders internally or externally. External roof supports shall be of an appropriately designed Hot-dip galvanized Steel construction. Tanks shall comply with relevant spill level, air gap and overflow requirements relative to Effective Capacity. All nuts and bolts used for the panels shall be a minimum of 12mm size and hot-dip galvanized/Case hardened. The tank shall have a circular angle fixed around the total circumference of the tanks, at the top, of minimum 2 mm thickness.Tanks shall be properly flushed out with clean water prior to being brought into service TANK DIMENSIONS: The dimensions of the Tank shall be of 3.884m in diameter and 3.6m in height DESIGN LIFE: The tanks shall have a design life of 40 years. TANK CONNECTIONS: Standard design valve outlet connection : i) 100mm CI Flanged valve ii) Overflow connection including an Internal approved bell-mouth shaped bends to maximize the overflow capacity. One no. 100 mm, iii) One (1) scour drain outlet from the floor of the tank with isolation valve. One No. 100mm.TANK LINERS:Tank liners shall be purpose-designed and manufactured and shall comply to AS/NZS 4020 (Appendix A )of 2005 and ANSI/NSF 61 - 2008, Section 5 Certificates of compliance to above standards shall be furnished by the manufacturer of the tanks. Tank liners shall: i) Be factory manufactured to one- piece construction, fabricated from multi-layer PE sheet, certified for potable drinking water, to (ANSI/ NSF 61) and duly UV Stabilized. ii) Be of PE (polyethylene) in multi-layer construction for strength, reinforced with woven scrim industrial fabric to prevent elongation and enhance tensile strength. The total liner material thickness shall be no less than 0.6 mm thick. The tensile strength shall not be less than 2266 N (warp) and 2495 N (weft) and heat sealing strength of 2056 N v) All the liner welded lap joints shall be strengthened with Metallocene encapsulating tape welded over the overlap. vi) The Metallocene tape shall cover and protect the exposed material at the edges of the liner joints to further prevent the ingress of water into the scrim. vii) Liners shall be positively and continuously attached to the top outer edge of the circumference of the tank to prevent entry of water from the runoff from the roof structure. viii) All liners on tanks over 2m in height shall have a continuous intermediate liner support designed out of nylon (or other material)cord, around the circumference of the tank, at vertical intervals corresponding to the level of each ring. ix) The intermediate liner support cords shall be firmly secured to the steel shell at each level, to prevent stress on the liner welded joints, and thereby eliminate possibility of failure CORROSSION PROTECTION. The tank structure shall have a secondary corrosion protection system using sacrificial magnesium anodes. The number of anodes, their location around the tank and the mass of each anode shall be designed for anode replacement frequency of five years. The anodes shall be installed external to the tank and concrete apron with their location marked with a suitably label-Cost for Tank steel with 10years guarantee includes shel l,Steel wall,steel domed roof,Zinc Alum steel',Cost for Poly ethylene infinity liner ,Geo synthetic Fibre withfood grade plastics are used for inside coating and Support Arrangements,Cost for Fabricated items,attachments and accessories like steel ladder,Cost of Fabricated nozzles,over flow nozzles and drain arrangements, Cost for HDG nut and bolts,Freight Charges,Erection Installation and commissioning of tank components.
Constuuction of 0.80 LL capacity steel tank at Tadiyanal,Nadukani Top and Karipilangadu
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD91876/2022-2023:Supplying,coveying & filling sand inside the platform for steel tank
OD91881/2022-2023:Supply,installation and commissioning of a pre-engineered, pre-fabricated, factorymanufactured steel storage Water Tank having a capacity of 80000 L. thickness of 0.6 mm, in multiple layers as required for the capacity and height of the tank and multiple-layered PE sheet/membrane for the innercontainment liner.The Tank Shell / Body & the Liner material shall be manufactured in a facility certified and compliant to ISO 9001 - 2000 standards. The Tank shall be supplied with access points, penetrations for inlets, outlets, drains and fittings, overflow and drain, high and low water level indicators.All connections to the tanks shall be with flanged or threaded nozzles, placed to the KWA water mainsTANK ROOF The roof of the tank shall be of corrugated Galvalume sheet steel and shall be domed, with heavy- duty Hot-dip Galvanized truss frame for support, and capable of supporting 4-5 persons for maintenance and cleaning and tank shall have an access hatch with cover, on the roof, for operation and Maintenance. TANK COVER Tank covers shall be of approved galvanized vermin proof construction. Roof ends shall be fitted with suitable vermin-proofing tape or other material, to prevent ingress of dust and foreign objects. Covers shall be firmly fixed to the top edge of the tank with galvanized bolts and nuts. LADDERS Tanks shall be provided with Hot-dip Galvanized ladders internally or externally. External roof supports shall be of an appropriately designed Hot-dip galvanized steel construction. Tanks shall comply with relevant spill level, air gap and overflow requirements relative to Effective Capacity. All nuts and bolts used for the panels shall be a minimum of 12mm size and hot-dip galvanized/Case hardened. The tank shall have a circular angle fixed around the total circumference of the tanks, at the top, of minimum 2 mm thickness.Tanks shall be properly flushed out with clean water prior to being brought into service.TANK DIMENSIONS The dimensions of the Tank shall be of 5.826m in diameter and 3.6m in height DESIGN LIFE. The tanks shall have a design life of 40 years. TANK CONNECTIONS< Standard design valve outlet connection : One No. 100mm CI Flanged valve. ii) Overflow connection including an internal approved bell-mouth shaped bends to maximize the overflow capacity. ? One no. 100 mm/150mm. iii) One (1) scour drain outlet from the floor of the tank with isolation valve. One No. 100 mm< TANK LINERS Tank liners shall be purpose-designed and manufactured and shall comply to AS/NZS 4020 (Appendix A) of 2005 and ANSI/NSF 61 ? 2008, Section 5 Certificates of compliance to above standards shall be furnished by the manufacturer of the tanks. Tank liners shall: i) Be factory manufactured to one- piece construction, fabricated from multi-layer PE sheet, certified for potable drinking water, to ANSI NSF 61 and duly UV Stabilized. ii) Be of PE (polyethylene) in multi-layer construction for strength, reinforced with woven scrim industrial fabric to prevent elongation and< enhance tensile strength.The contact surface shall be of Metallocene layer. iii) The total liner material thickness shall be no less than 0.6 mm thick DESIGN LIFE The tanks shall have a design life of 40 years.TANK CONNECTIONS Standard design valve outlet connection : One No. 100mm CI Flanged valve. ii) Overflow connection including an internal approved bell mouth shaped bends to maximize the overflow capacity. One no. 100 mm/150mm. iii) One (1) scour drain outlet from the floor of the tank with isolation valve. One No. 100 mm TANK LINERS Tank liners shall be purpose-designed and manufactured and shall comply to AS/NZS 4020 (Appendix A) of 2005 and ANSI/NSF 61 ? 2008, Section 5 Certificates of compliance to above standards shall be furnished by the manufacturer of the tanks. Tank liners shall: i) Be factory manufactured to one- piece construction, fabricated from multi-layer PE sheet, certified for potable drinking water, to ANSI NSF 61 and duly UV Stabilized. ii) Be of PE (polyethylene) in multi-layer construction for strength,< reinforced with woven scrim industrial fabric to prevent elongation and enhance tensile strength. The contact surface shall be of Metallocene layer. iii) The total liner material thickness shall be no less than 0.6 mm thickiv) The tensile strength shall not be less than 2266 N (warp) and 2495 N (weft) and heat sealing strength of 2056 N v) All the liner welded lap joints shall be strengthened with Metallocene encapsulating tape welded over the overlap. vi) The Metallocene tape shall cover and protect the exposed material at the edges of the liner joints to further prevent the ingress of water into the scrim. vii) Liners shall be positively and continuously attached to the top outer edge of the circumference of the tank to prevent entry of water from the runoff from the roof structure. viii) All liners on tanks over 2 m in height shall have a continuous intermediate liner support designed out of nylon (or other material)cord, around the circumference of the tank, at vertical intervals corresponding to the level of each ring. ix) The intermediate liner support cords shall be firmly secured to the steel shell at eachlevel, to prevent stress on the liner welded joints, and thereby eliminate possibility of failure CORROSSION PROTECTION The tank structure shall have a secondary corrosion protection system using sacrificial magnesium anodes. The number of anodes, their location around the tank and the mass of each anode shall be designed for anode replacement frequency of five years.The anodes shall be installed external to the tank and concrete apron with their location marked with a suitably label-Cost for Tank steel with 10years guarantee includes shel l,Steel wall,steel domed roof,Zinc Alum steel',Cost for Poly ethylene infinity liner ,Geo synthetic Fibre withfood grade plastics are used for inside coating and Support Arrangements,Cost for Fabricated items,attachments and accessories like steel ladder,Cost of Fabricated nozzles,over flow nozzles and drain arrangements, Cost for HDG nut and bolts,Freight Charges, Erection Installation and commissioning of Tank components
Construction of 0.80LL capcity steel tank at Ayurvedada dispensary
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD94910/2022-2023:Supplying,coveying & filling sand inside the platform for steel tank
OD94931/2022-2023:Supply,installation and commissioning of a pre-engineered, pre-fabricated, factorymanufactured steel storage Water Tank having a capacity of 80000L, thichness of 0.6 mm, in multiple layers as required for the capacity and height of the tank and multiple-layered PE sheet/membrane for the innercontainment liner.The Tank Shell / Body & the Liner material shall be manufactured in a facility certified and compliant to ISO 9001 - 2000 standards. The Tank shall be supplied with access points, penetrations for inlets, outlets, drains and fittings, overflow and drain, high and low water level indicators.All connections to the tanks shall be with flanged or threaded nozzles, placed to the KWA water mainsTANK ROOF The roof of the tank shall be of corrugated Galvalume sheet steel and shall be domed, with heavy- duty Hot-dip Galvanized truss frame for support, and capable of supporting 4-5 persons for maintenance and cleaning and tank shall have an access hatch with cover, on the roof, for operation and Maintenance. TANK COVER Tank covers shall be of approved galvanized vermin proof construction. Roof ends shall be fitted with suitable vermin-proofing tape or other material, to prevent ingress of dust and foreign objects. Covers shall be firmly fixed to the top edge of the tank with galvanized bolts and nuts. LADDERS Tanks shall be provided with Hot-dip Galvanized ladders internally or externally. External roof supports shall be of an appropriately designed Hot-dip galvanized steel construction. Tanks shall comply with relevant spill level, air gap and overflow requirements relative to Effective Capacity. All nuts and bolts used for the panels shall be a minimum of 12mm size and hot-dip galvanized/Case hardened. The tank shall have a circular angle fixed around the total circumference of the tanks, at the top, of minimum 2 mm thickness.Tanks shall be properly flushed out with clean water prior to being brought into service.TANK DIMENSIONS The dimensions of the Tank shall be of 4.885m in diameter and 5m in height DESIGN LIFE. The tanks shall have a design life of 40 years. TANK CONNECTIONS< Standard design valve outlet connection : One No. 100mm CI Flanged valve. ii) Overflow connection including an internal approved bell-mouth shaped bends to maximize the overflow capacity. ? One no. 100 mm. iii) One (1) scour drain outlet from the floor of the tank with isolation valve. One No. 100 mm< TANK LINERS Tank liners shall be purpose-designed and manufactured and shall comply to AS/NZS 4020 (Appendix A) of 2005 and ANSI/NSF 61 ? 2008, Section 5 Certificates of compliance to above standards shall be furnished by the manufacturer of the tanks. Tank liners shall: i) Be factory manufactured to one- piece construction, fabricated from multi-layer PE sheet, certified for potable drinking water, to ANSI NSF 61 and duly UV Stabilized. ii) Be of PE (polyethylene) in multi-layer construction for strength, reinforced with woven scrim industrial fabric to prevent elongation and< enhance tensile strength.The contact surface shall be of Metallocene layer. iii) The total liner material thickness shall be no less than 0.6 mm thick DESIGN LIFE The tanks shall have a design life of 40 years.TANK CONNECTIONS Standard design valve outlet connection : One No. 100mm CI Flanged valve. ii) Overflow connection including an internal approved bell mouth shaped bends to maximize the overflow capacity. One no. 100 mm. iii) One (1) scour drain outlet from the floor of the tank with isolation valve. One No. 100 mm TANK LINERS Tank liners shall be purpose-designed and manufactured and shall comply to AS/NZS 4020 (Appendix A) of 2005 and ANSI/NSF 61 ? 2008, Section 5 Certificates of compliance to above standards shall be furnished by the manufacturer of the tanks. Tank liners shall: i) Be factory manufactured to one- piece construction, fabricated from multi-layer PE sheet, certified for potable drinking water, to ANSI NSF 61 and duly UV Stabilized. ii) Be of PE (polyethylene) in multi-layer construction for strength,< reinforced with woven scrim industrial fabric to prevent elongation and enhance tensile strength. The contact surface shall be of Metallocene layer. iii) The total liner material thickness shall be no less than 0.6 mm thickiv) The tensile strength shall not be less than 2266 N (warp) and 2495 N (weft) and heat sealing strength of 2056 N v) All the liner welded lap joints shall be strengthened with Metallocene encapsulating tape welded over the overlap. vi) The Metallocene tape shall cover and protect the exposed material at the edges of the liner joints to further prevent the ingress of water into the scrim. vii) Liners shall be positively and continuously attached to the top outer edge of the circumference of the tank to prevent entry of water from the runoff from the roof structure. viii) All liners on tanks over 2 m in height shall have a continuous intermediate liner support designed out of nylon (or other material)cord, around the circumference of the tank, at vertical intervals corresponding to the level of each ring. ix) The intermediate liner support cords shall be firmly secured to the steel shell at eachlevel, to prevent stress on the liner welded joints, and thereby eliminate possibility of failure CORROSSION PROTECTION The tank structure shall have a secondary corrosion protection system using sacrificial magnesium anodes. The number of anodes, their location around the tank and the mass of each anode shall be designed for anode replacement frequency of five years.The anodes shall be installed external to the tank and concrete apron with their location marked with a suitably label-Cost for Tank steel with 10years guarantee includes shel l,Steel wall,steel domed roof,Zinc Alum steel',Cost for Poly ethylene infinity liner ,Geo synthetic Fibre withfood grade plastics are used for inside coating and Support Arrangements,Cost for Fabricated items,attachments and accessories like steel ladder,Cost of Fabricated nozzles,over flow nozzles and drain arrangements, Cost for HDG nut and bolts,Freight Charges, Erection Installation and commissioning of Tank components
Construction of 1.40LL capacity steel tank at Pothumattom
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD93261/2022-2023:Supplying,coveying & filling sand inside the platform for steel tank
OD93262/2022-2023:Supply,installation and commissioning of a pre-engineered, pre-fabricated, factorymanufactured steel storage Water Tank having a capacity of 140000 LL(1Nos-total 4 lakhs.)thichness of 0.6 mm, in multiple layersas required for the capacity and height of the tank and multiple-layered PE sheet/membrane for the innercontainment liner.The Tank Shell / Body & the Liner material shall be manufactured in a facility certified and compliant to ISO 9001 - 2000 standards. The Tank shall be supplied with access points, penetrations for inlets, outlets, drains and fittings, overflow and drain, high and low water level indicators.All connections to the tanksshall be with flanged or threaded nozzles, placed to the KWA water mainsTANK ROOF The roof of the tank shall be of corrugated Galvalume sheet steel and shall be domed, with heavy- duty Hot-dip Galvanized truss frame for support, and capable of supporting 4-5 persons for maintenance and cleaning and tank shall have an access hatch with cover, on the roof, for operation and Maintenance. TANK COVER Tank covers shall be of approved galvanized vermin proof construction. Roof ends shall be fitted with suitable vermin-proofing tape or other material, to prevent ingress of dust and foreign objects. Covers shall be firmly fixed to the top edge of the tank with galvanized bolts and nuts. LADDERS Tanks shall be provided with Hot-dip Galvanized ladders internally or externally. External roof supports shall be of an appropriately designed Hot-dip galvanized steel construction. Tanks shall comply with relevant spill level, air gap and overflow requirements relative to Effective Capacity. All nuts and bolts used for the panels shall be a minimum of 12mm size and hot-dip galvanized/Case hardened. The tank shall have a circular angle fixed around the total circumference of the tanks, at the top, of minimum 2 mm thickness.Tanks shall be properly flushed out with clean water prior to being brought into service.TANK DIMENSIONS The dimensions of the Tank shall be of 6.797m in diameter and 4.3m in height DESIGN LIFE. The tanks shall have a design life of 40 years. TANK CONNECTIONS< Standard design valve outlet connection : One No. 150mm CI Flanged valve. ii) Overflow connection including an internal approved bell-mouth shaped bends to maximize the overflow capacity. ? One no. 150 mm. iii) One (1) scour drain outlet from the floor of the tank with isolation valve. One No. 150 mm< TANK LINERS Tank liners shall be purpose-designed and manufactured and shall comply to AS/NZS 4020 (Appendix A) of 2005 and ANSI/NSF 61 ? 2008, Section 5 Certificates of compliance to above standards shall be furnished by the manufacturer of the tanks. Tank liners shall: i) Be factory manufactured to one- piece construction, fabricated from multi-layer PE sheet, certified for potable drinking water, to ANSI NSF 61 and duly UV Stabilized. ii) Be of PE (polyethylene) in multi-layer construction for strength, reinforced with woven scrim industrial fabric to prevent elongation and< enhance tensile strength.The contact surface shall be of Metallocene layer. iii) The total liner material thickness shall be no less than 0.6 mm thick DESIGN LIFE The tanks shall have a design life of 40 years.TANK CONNECTIONS Standard design valve outlet connection : One No. 150mm CI Flanged valve. ii) Overflow connection including an internal approved bell mouth shaped bends to maximize the overflow capacity. One no. 150 mm. iii) One (1) scour drain outlet from the floor of the tank with isolation valve. One No. 150 mm TANK LINERS Tank liners shall be purpose-designed and manufactured and shall comply to AS/NZS 4020 (Appendix A) of 2005 and ANSI/NSF 61 ? 2008, Section 5 Certificates of compliance to above standards shall be furnished by the manufacturer of the tanks. Tank liners shall: i) Be factory manufactured to one- piece construction, fabricated from multi-layer PE sheet, certified for potable drinking water, to ANSI NSF 61 and duly UV Stabilized. ii) Be of PE (polyethylene) in multi-layer construction for strength,< reinforced with woven scrim industrial fabric to prevent elongation and enhance tensile strength. The contact surface shall be of Metallocene layer. iii) The total liner material thickness shall be no less than 0.6 mm thickiv) The tensile strength shall not be less than 2266 N (warp) and 2495 N (weft) and heat sealing strength of 2056 N v) All the liner welded lap joints shall be strengthened with Metallocene encapsulating tape welded over the overlap. vi) The Metallocene tape shall cover and protect the exposed material at the edges of the liner joints to further prevent the ingress of water into the scrim. vii) Liners shall be positively and continuously attached to the top outer edge of the circumference of the tank to prevent entry of water from the runoff from the roof structure. viii) All liners on tanks over 2 m in height shall have a continuous intermediate liner support designed out of nylon (or other material)cord, around the circumference of the tank, at vertical intervals corresponding to the level of each ring. ix) The intermediate liner support cords shall be firmly secured to the steel shell at eachlevel, to prevent stress on the liner welded joints, and thereby eliminate possibility of failure CORROSSION PROTECTION The tank structure shall have a secondary corrosion protection system using sacrificial magnesium anodes. The number of anodes, their location around the tank and the mass of each anode shall be designed for anode replacement frequency of five years.The anodes shall be installed external to the tank and concrete apron with their location marked with a suitably label-Cost for Tank steel with 10years guarantee includes shel l,Steel wall,steel domed roof,Zinc Alum steel',Cost for Poly ethylene infinity liner ,Geo synthetic Fibre withfood grade plastics are used for inside coating and Support Arrangements,Cost for Fabricated items,attachments and accessories like steel ladder,Cost of Fabricated nozzles,over flow nozzles and drain arrangements, Cost for HDG nut and bolts,Freight Charges, Erection Installation and commissioning of Tank components
Renovation of Existing Tank
100.53.1.a:Washing OHSR/GLSR using brooms, brushes and bleaching powder by engaging coolies, scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab and columns, disposing the the slurry / waste materials away from the immediate premises and within the initial lead of 50m from the periphery of the tank, without causing any damage to the existing structure and installations, charges including the operation of valves, conveyance and hire charges of tools and as per the direction of the department officers etc. complete.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
22.23.1:Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineerin- charge. The product performance shall carry guarantee for 10 years against any leakage.For vertical surface two coats @0.70 kg per sqm
22.23.2:Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineerin- charge. The product performance shall carry guarantee for 10 years against any leakage.For horizontal surface one coat @1.10 kg per sqm.
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work
13.71:Lettering with black Japan pint of approved brand and manufacture
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Supplying and laying of Distribution System.
100.98.115:Supply of DI K9 Pipe Conforming to IS 8329/2000, 100mm Dia.
100.98.116:Supply of DI K9 Pipe Conforming to IS 8329/2000, 150mm Dia.
100.98.134:Supply of HDPE Pipe PE 100 (IS 4984/1995), 8kg, 90mm Outer Dia.
100.98.154:Supply of HDPE Pipe PE 100 (IS 4984/1995), 10kg, 90mm Outer Dia.
100.98.174:Supply of HDPE Pipe PE 100 (IS 4984/1995), 12.5kg, 90mm Outer Dia.
100.98.194:Supply of HDPE Pipe PE 100 (IS 4984/1995), 16kg, 90mm Outer Dia.
OD98181/2022-2023:Supply of HDPE pipe specials, 90mm dia. (3% of the cost of pipe)
100.98.440:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 25mm.
100.98.445:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Double Orifice Type DS2, Size 40mm.
100.98.457:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 80mm.
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock.
100.2.7:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited.
100.4.1:Excavating in hard rock for trenches by blasting for laying pipes and stacking useful materials for measurements and disposing unserviceable materials within the initial lead of 50m and lift up to 1.50m (depth from 0.0m to 1.50m) and providing protection by earth filled cement bags during blasting to avoid damages to nearby structures (200 Nos. of earth filled cement bags for 10m3 of blasting)
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge.
100.10.1:Laying HDPE pipes (IS : 4984) on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi-automatic electrofusion machines, testing the pipeline thus fabricated to suit the hydraulic working pressure and after testing, aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water before back filling and levelling the trenches including all labour charge, hire for appliances etc., complete but excluding cost of pipe and fittings: 90mm Nominal Outer Diameter pipes.
18.12.7:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work65 mm dia nominal bore
18.12.8:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work80 mm dia nominal bore
100.14.1:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 100mm diameter Ductile Iron Class K-9 Pipes.
100.14.2:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 150mm diameter Ductile Iron Class K-9 Pipes.
OD97541/2022-2023:Labour for cutting D.I. pipe with steel saw.150 mm diameter D.I. pipe
OD97542/2022-2023:Labour for cutting D.I. pipe with steel saw.100 mm diameter D.I. pipe
18.68.1:Providing and laying D.I specials of class K - 12 suitable for push - on jointing as per IS : 9523 :Upt 600 mm dia
18.70.1:Providing push - on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket:100 mm dia pipes
18.70.2:Providing push - on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket:150 mm dia pipes
18.30.2:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:100 mm diameter pipe
18.30.4:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:150 mm diameter pipe
100.32.1:Conveying and fixing C. I. Single Acting Air Valve of approved quality with bolts, nuts, rubber insertions etc., complete, but excluding the cost of air valve (tail pieces, if required, will be paid separately): 25mm Single Acting Air Valve.
100.32.2:Conveying and fixing C. I. Single Acting Air Valve of approved quality with bolts, nuts, rubber insertions etc., complete, but excluding the cost of air valve (tail pieces, if required, will be paid separately): 40mm Single Acting Air Valve.
100.31.1.1:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 80mm diameter, Class I.
OD81376/2022-2023:Supply and fixing of stainless steel spring loaded pressure relief valve
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Providing FHTC to various Zones
100.60.13.1.2:Providing 15mm (1/2 inch) house connection with 15mm water meter from existing PVC / HDPE mains up to 110 mm dia., up to a length of 5m using 20mm ( 1/2 inch ) PE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PP PN 16 Compression / GM / Brass specials viz. brass ferrule, brass hexagonal nipple, GM full way wheel valve, bend, MTA, FTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges, including the cost of tested Class B Multijet water meter with ISI mark and weather resistant PP / PE meter box of minimum size 300mm x 200mm x 150mm, but excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers.
100.60.13.3.2:Providing 20mm (3/4 inch) house connection with 15mm water meter from existing PVC / HDPE mains up to 110 mm dia., up to a length of 5m using 25mm ( 3/4 inch ) PE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PP PN 16 Compression / GM / Brass specials viz. brass ferrule, brass hexagonal nipple, GM full way wheel valve, bend, MTA, FTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges,including the cost of tested Class B Multijet water meter and weather with ISI mark resistant PP / PE meter box of minimum size 300mm x 200mm x 150mm, but excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers.
100.60.13.7.2:Providing 15mm (1/2 inch) house connection with 15mm water meter from existing CI mains up to 125 mm dia., up to a length of 5 m using 20mm ( 1/2 inch ) PE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PP PN 16 Compression / GM / Brass specials viz. brass ferrule, brass hexagonal nipple, GM full way wheel valve, bend, MTA, FTA, couplers etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges, including the cost of tested Class B Multijet water meter with ISI mark and weather resistant PP / PE meter box of minimum size 300mm x 200mm x 150mm, but excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers
100.60.13.9.2:Providing 20mm (3/4 inch) house connection with 15mm water meter from existing CI mains up to 125 mm dia., up to a length of 5 m using 25mm ( 3/4 inch ) PE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PP PN 16 Compression / GM / Brass specials viz. brass ferrule, brass hexagonal nipple, GM full way wheel valve, bend, MTA, FTA, couplers etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges, including the cost of tested Class B Multijet water meter with ISI mark and weather resistant PP / PE meter box of minimum size 300mm x 200mm x 150mm, but excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers
100.60.10.1.1:Providing 15mm (1/2 inch) GM Air Valve in the water meter assembly for 15mm connection, using 20mm Indian Standard Class 6 uPVC pipes and specials including cost of materials, consumables, hire for tools and labour charges etc. complete and as per the directions of the department officers.
100.60.10.2.1:Providing 20mm (3/4 inch) GM Air Valve in the water meter assembly for 20mm connection, using 25mm Indian Standard Class 6 uPVC pipes and specials including cost of materials, consumables, hire for tools and labour charges etc. complete and as per the directions of the department officers.
100.60.12.3.1:Providing 15mm PVC Tap in the water meter assembly for 15mm connection, using 20mm Indian Standard Class 6 uPVC pipes and specials including cost of materials, consumables, hire charges for tools and labour charges etc. complete and as per the direction of departmental officers.
100.60.12.4.1:Providing 15mm PVC Tap in the water meter assembly for 20mm connection, using 25mm Indian Standard Class 6 uPVC pipes and specials including cost of materials, consumables, hire charges for tools and labour charges etc. complete and as per the direction of departmental officers.
100.60.15.1.1:Providing additional length of house connection pipe using 20 mm (1/2 inch) PE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PN16 specials and testing the joints etc., by trenching and refilling in all kinds of soil with trench of average cross section 0.3m x 0.75m for laying of connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc., including cost of materials, hire for tools, cost of consumables and labour charges etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads etc., and as per the directions of the department officers.
100.60.15.2.1:Providing additional length of house connection pipe using 25 mm (3/4 inch) PE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PN 16 specials and testing the joints etc., by trenching and refilling in all kinds of soil with trench of average cross section 0.3m x 0.75m for laying of connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc., including cost of materials, hire for tools, cost of consumables and labour charges etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads etc., and as per the directions of the department officers.
100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge.
100.60.8.1:Replacing the chocked / damaged 15mm (1/2 inch) house connection with 15mm (1/2 inch) water meter from existing mains, up to a length of 5m using 20mm Indian Standard Class 6 uPVC pipe and uPVC / Brass specials viz. brass ferrule, Elbow, MTA, FTA, couplers etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, safely removing & re-fixing existing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges but excluding cost of water meter and meter box and excluding charges for cutting the concrete / tarred / bituminous roads and as per the directions of the department officers
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Road restoration works(MORTH)
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.b:Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom.
5.3.2.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size)
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
OD97075/2022-2023:Mix seal surfacing Providing,laying and rolling of close-graded premix surfacing material of 20mm thickness composed of 11.2mm to 0.9mm Type-A aggregate using penetration grade bitumen to required line,grade and level to serve as wearing course on previously prepared base,including mixing in a suitable plant,laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical specification cluse 509 of MORD(Usage of bitumen is 22.00Kg/(10m2)By Manual Means
Road restoration charges (DAR CIVIL)
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
100.41.39:Supply, stacking, spreading and consolidating of Quarry Muck in the trench of pipe line, including carriage, loading, unloading & stacking up to any lead.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
16.84:Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost.)
Bidder Name
Kanjiramkunnel Constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid