| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LQualified 147 1 KRISHANU KARMAKAR NETAJI SUBHASH ROAD NABADWIP NABADWIP NADIA WEST BENGAL 741302 | NADIA | WEST BENGAL | 741302 | L1 | Qualified MII | |
| 2 | L2₹18.6 L+₹3,950.70 (0.21%)Qualified 30C SHYAM SUNDAR PALLY 2ND LANE SHAKUNTALA PARK KOLKATA TUSHAR KANTI CHAKRABORTY 2ND LANE SHAKUNTALA PARK SHAKUNTALA APARK | L2 | Qualified MII | |
| 3 | L3₹20.4 L+₹1.8 L (9.64%)Qualified 00 ALAHLADPUR MAIRHI CHANDAULI CHANDAULI UTTAR PRADESH 232104 | CHANDAULI | UTTAR PRADESH | 232104 | L3 | Qualified MII | |
| 4 | L4₹22.7 L+₹4.2 L (22.4%)Qualified PLOT NO 22 2580 A NEAR HIG 98 SAILESHREE VIHAR CHANDRASEKHARPUR BHUBANESWAR BHUBANESHWAR ORISSA 751021 | KHORDHA | ODISHA | 751021 | L4 | Qualified MII | |
| 5 | Qualified 270 D 3RD FLOOR RABINDRA SARANI BURRABAZAR KOLKATA WEST BENGAL 700007 | KOLKATA | WEST BENGAL | 700007 | - | Qualified MII |
Tender Value
Refer Docs
EMD Value
₹63,360
Closing Date
31 Jul 2025, 2:00 pmClosed
Solar Power Plant (Roof Top) for ONGRID System
Three Phase (V2) (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6387533 Dated : 09-07-2025 Bid Document 1/11
-- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 63360 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 122 (a). EMD EXEMPTION: The bidder seeking EMD exemption
must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category
only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : ACTING THROUGH PURCHASE OFFICER CRPU
Directorate Of Purchase And Stores
Department of Atomic Energy
Sector-1
Block-AF
Bidhan Nagar
Salt 2/11 Lake
Kolkata - 700 064
OUR CASE FILE NO. DPS/CRPU/VECC/31011 (The President Of India) Splitting
8015427
GEM/2025/B/6387533
Two Packet Bid
Solar Power Plant (Roof Top) for ONGRID System
120 days
Das700064VARIABLE ENERGY CYCLOTRON CENTRE I/AF BIDHAN NAGAR KOLKATA
Total value wise evaluation
PRODUCT
2 documents required · 2 mandatory
₹63,360
9 Jul 2025
9 Jul 2025
31 Jul 2025
Solar Power Plant (Roof Top) for ONGRID System
Three Phase (V2) (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6387533 Dated : 09-07-2025 Bid Document 1/11
-- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 63360 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 122 (a). EMD EXEMPTION: The bidder seeking EMD exemption
must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category
only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : ACTING THROUGH PURCHASE OFFICER CRPU
Directorate Of Purchase And Stores
Department of Atomic Energy
Kolkata - 700 064
OUR CASE FILE NO. DPS/CRPU/VECC/31011 (The President Of India) Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8015427.pdf
GEM_BID
XI_fcce530e-370e-46e6-a1161750931434383_pocrpu.docx
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .