Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.3 LAccepted-AOC | L-1 | Accepted-AOC L-1 |
Tender Value
Refer Docs
Closing Date
8 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM-C
Gujarat Refinery, Vadodara
JC22MLS330- Inspection and Low speed balancing of hot oil turbine rotor Model CYR PE IIIB Serial No E302207B-1 2) at OEM works at Gujarat Refinery.
2022_JR_158522_1
JC22MLS330
Single
Mechanical Works
Works
365 days
Gujarat Refinery
As Per NIT
5 documents required · 5 mandatory
Exempted
30 Sept 2023
15 Nov 2022
9 Dec 2022
15 Nov 2022
8 Dec 2022
15 Nov 2022
Amount
RFQ ITEM NO.00010 Inspection of CYR PE IIIB Rotor-LAB
SOR ITEM '00010: A1. Scope of Work for Inspection: Joint inspection of rotor shall be carried out by IOCL & Elliott Ebara Engineers. Elliott Ebara has to intimate IOCL at least 7 days in advance for inspection. 1. Receive, unload and unpack rotor from packing box. 2. Water wash/ manual cleaning of rotor to remove excess preservative. 3. Grit blasting of the rotor 4. Visual inspection od the rotor. 5. Magnetic particle examination of the rotor as per ASTM E709 6. Ultrasonic examination of Journals, thrust disc and gland areas. 7. Dimensional inspection of the critical areas of the rotor 8. Concentricity (run out) check of the rotors 9. Electrical run out check of the rotors (if applicable). 10. 10.Low speed balancing check of the rotor as per Elliott standards asper ISO 1940 Gr 2.5 11. 11.Residual magnetism check anddemagnetization with 5 Gauss. 12. NDT of the accessible locations of the rotor. 13. Preparation of inspection report and providing the detailed recommondation, if any for repair & replacement works. Final documents to be furnished by rotor. 1. Pre-repair dimension check report. 2. Pre-repair concentricity check report. 3. Pre-repair magnetic particle test report. 4. Pre-repair electrical run out check report of the rotor. 5. Pre-repair visual check report of the rotor. 6. Low speed balancing check report of the rotor.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .