| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance VILL KUMRADI MANGLOR ROORKEE HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | -0.22% | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 CrAdmitted-Finance 01 VIDYA VIHAR PHASE I KARGI ROAD DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | +0.23% | ₹1.8 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.8 CrAdmitted-Finance 0 TAWOR ROAD GALI NO 3 NDC MURADNAGAR GHAZIABAD UTTAR PRADESH 201206 | GHAZIABAD | UTTAR PRADESH | 201206 | +1.00% | ₹1.8 Cr | L3 | Admitted-Finance |
| 4 | L4₹1.9 CrAdmitted-Finance | +4.50% | ₹1.9 Cr | L4 | Admitted-Finance |
| 5 | L5₹1.9 CrAdmitted-Finance 3 7 PADI GALI VIKAS NAGAR DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | +8.08% | ₹1.9 Cr | L5 | Admitted-Finance |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
28 Apr 2026, 2:00 pmClosed
Superintending Engineer
Electricity Civil Circle (Dehradun)
Construction of S.G.R building, Boundary Wall, Approach Road and other misc. civil works at 33/11 KV S/S SIDCUL Phase II Sitarganj (U.S.Nagar).
2026_UPCL8_94310_1
ECC-01/2026-27
Open Tender
Civil Works
180 days
As per Tender
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
E.E, Electricity Civil Construction Division
₹3.6 L
29 Apr 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
28 Apr 2026
23 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1CIVIL WORKS | ||||||
| 0.999 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (All kinds of soil). | 0.2 | Cum | - | - | 2.8.1 |
| 0.000 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 0.6 | Cum | - | - | 2.25 |
| 0.999 | Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete. | 0.2 | Cum | - | - | 2.27 |
| 0.000 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | - | Sqm | - | - | 2.31 |
| 0.999 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - | 4.1.2 |
| 0.000 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 0.2 | Cum | - | - | 4.1.8 |
| 0.999 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size) | 1 | Sqm | - | - | 4.1 |
| 0.000 | Extra for providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer's specification. | - | Per 50kg Cement | - | - | 4.12 |
| 0.999 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 0.8 | Cum | - | - | 5.1.2 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
TC.pdf
Tender Documents • 0.28 MB
BOQ_111637.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid