Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.7 LAccepted-AOC | 1 | Accepted-AOC L-1 | |
| 2 | 2₹23.8 L+₹4.5 L (23.4%)Rejected-Finance 158 1 BAKUL BAGN ROAD BHOWANIPUR BAKUL BAGAN KOLKATA WEST BENGAL 700025 | KOLKATA | WEST BENGAL | 700025 | 2 | Rejected-Finance L-2 | |
| 3 | 3₹42 L+₹22.8 L (118.2%)Rejected-Finance | 3 | Rejected-Finance L-3 |
Tender Value
₹66.5 L
Closing Date
18 Jun 2022, 6:00 pmClosed
CM (Contracts)
IOCL(AOD) Digboi Refinery
COMPREHENSIVE ARCHITECTURAL and STRUCTURAL CONSULTANCY FOR BUILDINGS AND ALLIED WORKS FOR CONSTRUCTION OF NEW CENTRALIZED TRANSIT ACCOMODATION (CTA) FOR OFFICERS AT DIGBOI REFINERY (AOD), DIGBOI, ASSAM
2022_AOD_151993_1
DRE122A034
Limited
Consultancy Service
Service
840 days
IOCL(AOD) Digboi Refinery
As per Tender Document
5 documents required · 5 mandatory
Exempted
IOCL(AOD) Digboi Refinery
5 Aug 2022
4 Jun 2022
21 Jun 2022
4 Jun 2022
18 Jun 2022
4 Jun 2022
13 Jun 2022
Amount
PART-A:Consultancy services of CTA
Comprehensive Consultancy services for conceptualization, basic design, Architectural, Civil, Structural, Interior Design, Plumbing, Sanitary, Electrical, Communication, HVAC, allied works such as roads, storm water drains, drinking water / sewer /Fire water network, landscaping etc. including preparation of estimate, technical specification / tender documents, preparation of tendering /execution / As-built drawings etc., recommendation regarding procurement of bought out furniture / special materials for Construction of New Centralized Transit Accommodation building and ancillary building at Digboi Refinery, Digboi, all as per scope of work and direction of the Engineer-in-Charge. NOTE: Value mentioned against "Quantity'' multiplied by ''Rate" column for this item is indicative consultancy cost in Indian Rupees.
Consultancy Services for obtaining Green Building Certification for New Centralized Transit Accomodation Building and ancillary building at Digboi Refinery Township from Indian Green Building council (IGBC) / GRIHA , including feasibility study, project registration, energy simulation & analysis, submission of required details/documents to IGBC/GRIHA , post occupancy review etc. all complete as per scope of work and direction of the Engineer-in-Charge.
Site visit including travel cost for conveyance, local travel and miscellaneous expense on daily allowance,fooding & lodging. (The unit "EA" means "Travel reimbursement as described above for each site visit per person")
Creative Forum Pvt. Ltd.
S KUMAR AND ASSOCIATES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .