Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.2 L+₹391 (0.07%)Admitted-Fee/PreQual/Technical/Finance | ₹5.2 L+₹391 (0.07%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.3 L+₹1.1 L (20.9%)Admitted-Fee/PreQual/Technical/Finance | ₹6.3 L+₹1.1 L (20.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Synergy Architects and Engineers L3 | JAMSHAD NASEERI P.K L1 | Gentex Solutions Pvt Ltd L2 |
|---|---|---|---|---|---|---|
| 1.00Appendix 1-bore hole works | ||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 925 | sqm | 10 ₹9,250 | 10 ₹9,250 | 1 ₹925 Lowest |
| 1.00 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring | 1 | set | 1,50,000 ₹1,50,000 | 30,000 ₹30,000 Lowest | 35,000 ₹35,000 |
| 1.00 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. | 14 | Bore Holes | 7,000 ₹98,000 | 6,000 ₹84,000 | 5,000 ₹70,000 Lowest |
| 1.00 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 140 | metre | 1,200 ₹1,68,000 | 800 ₹1,12,000 Lowest | 1,000 ₹1,40,000 |
| 1.00 | 56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 140 | metre | 100 ₹14,000 Lowest | 800 ₹1,12,000 | 1,000 ₹1,40,000 |
| 1.01 | 56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 140 | metre | 10 ₹1,400 Lowest | 10 ₹1,400 Lowest | 10 ₹1,400 Lowest |
| 1.01 | 56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river. | 14 | metre | 5,000 ₹70,000 | 4,941 ₹69,174 Lowest | 5,000 ₹70,000 |
| 1.01 | 56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code. | 210 | each | 50 ₹10,500 | 1 ₹210 Lowest | 10 ₹2,100 |
| 1.01 | 56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes. | 2 | set | 10,000 ₹20,000 Lowest | 10,000 ₹20,000 Lowest | 10,000 ₹20,000 Lowest |
Tender Value
₹6.4 L
EMD Value
₹15,991
Closing Date
14 Sept 2026, 6:00 pmClosed
AEE ,Irrigation Subdivision ,Tirur
AEE , Irrigation Subdivision, Tirur
GENERAL-INVESTIGATION WORKS-2026- On right bank of Bharathapuzha at upstream of Kankakadavu RCB upto Changanayil kadavu railway track-Investigation Work
2026_Irrig_865481_2
IRR/IA/TR/4459/2026_3_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
Changanayil kadavu near Kankakkadavu RCB
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,410
₹15,991
Yes
18 Sept 2026
3 Sept 2026
16 Sept 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix 1-bore hole works | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 925 | sqm | - | - |
| 1.002 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring | 1 | set | - | - |
| 1.003 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. | 14 | Bore Holes | - | - |
| 1.004 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 140 | metre | - | - |
| 1.005 | 56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 140 | metre | - | - |
| 1.006 | 56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 140 | metre | - | - |
| 1.007 | 56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river. | 14 | metre | - | - |
| 1.008 | 56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code. | 210 | each | - | - |
| 1.009 | 56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes. | 2 | set | - | - |
stage.html
html • 0.02 MB
finance_1469132.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
sbd.pdf
Tender Documents • 1.64 MB
BOQ_1469132.xls
BOQ • 0.31 MB
nit.pdf
Other Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .