Tender Value
₹3.1 L
EMD Value
₹7,900
Closing Date
2 Jul 2026, 3:00 pm
Similar tender results from the same govt authority in the past 3 years.
Divisional Engineer-(Electrical), Tirumala
TIRUMALA
Repainting to the existing street light poles and copings in ESD-K and P dam,Tirumala
948167
88/DE(Elec)Tml/TTD/2026-27
OPEN - NCB
Electrical Works
TIRUPATHI
10 documents required · 10 mandatory
₹112
₹7,900
18 Jun 2026
18 Jun 2026
18 Jun 2026
Painting to the existing 7.5 mtrs height with Single/ double stem steel tubular poles / pipes of street lights / Road light / Yard lights including stems, MS boxes / cross arms / GI pipes clamps to the pole with one coat of enamel paint of approved colour from coping to a height of 1 Mtr and single/ double stem pipe of approved colour and painting the remaining pole with one coat of aluminium paint & painting one coat of AcrylicExterior Emulsion paint to the pole coping as directed during execution. Necessary ladder / scaffolding arrangement is to be made by contractor at his cost. (If departmental ladder is used an amount of Rs.25-00 / pole will be deducted from the contractor bill subject to without causing any damage to the ladder).
Painting to the existing 8 mtrs height with Single/ double stem steel tubular poles / pipes of street lights / Road light / Yard lights including stems, MS boxes / cross arms / GI pipes clamps to the pole with one coat of enamel paint of approved colour from coping to a height of 1 Mtr and single/ double stem pipe of approved colour and painting the remaining pole with one coat of aluminium paint & painting one coat of AcrylicExterior Emulsion paint to the pole coping as directed during execution. Necessary ladder / scaffolding arrangement is to be made by contractor at his cost.
(If departmental ladder is used an amount of Rs.25-00 / pole will be deducted from the contractor bill subject to without causing any damage to the ladder).
Painting to the existing 9 mtrs height with Single/ double stem steel tubular poles / pipes of street lights / Road light / Yard lights including stems, MS boxes / cross arms / GI pipes clamps to the pole with one coat of enamel paint of approved colour from coping to a height of 1 Mtr and single/ double stem pipe of approved colour and painting the remaining pole with one coat of aluminium paint & painting one coat of AcrylicExterior Emulsion paint to the pole coping as directed during execution. Necessary ladder / scaffolding arrangement is to be made by contractor at his cost. (If departmental ladder is used an amount of Rs.25-00 / pole will be deducted from the contractor bill subject to without causing any damage to the ladder).
Painting to the existing 10 mtrs height with Single/ double stem steel tubular poles / pipes of street lights / Road light / Yard lights including stems, MS boxes / cross arms / GI pipes clamps to the pole with one coat of enamel paint of approved colour from coping to a height of 1 Mtr and single/ double stem pipe of approved colour and painting the remaining pole with one coat of aluminium paint & painting one coat of AcrylicExterior Emulsion paint to the pole coping as directed during execution. Necessary ladder / scaffolding arrangement is to be made by contractor at his cost. (If departmental ladder is used an amount of Rs.25-00 / pole will be deducted from the contractor bill subject to without causing any damage to the ladder).
Painting to the existing 11 mtrs height with Single/ double stem steel tubular poles / pipes of street lights / Road light / Yard lights including stems, MS boxes / cross arms / GI pipes clamps to the pole with one coat of enamel paint of approved colour from coping to a height of 1 Mtr and single/ double stem pipe of approved colour and painting the remaining pole with one coat of aluminium paint & painting one coat of AcrylicExterior Emulsion paint to the pole coping as directed during execution. Necessary ladder / scaffolding arrangement is to be made by contractor at his cost. (If departmental ladder is used an amount of Rs.25-00 / pole will be deducted from the contractor bill subject to without causing any damage to the ladder).
Painting to the existing 12 mtrs height with Single/ double stem steel tubular poles / pipes of street lights / Road light / Yard lights including stems, MS boxes / cross arms / GI pipes clamps to the pole with one coat of enamel paint of approved colour from coping to a height of 1 Mtr and single/ double stem pipe of approved colour and painting the remaining pole with one coat of aluminium paint & painting one coat of AcrylicExterior Emulsion paint to the pole coping as directed during execution. Necessary ladder / scaffolding arrangement is to be made by contractor at his cost. (If departmental ladder is used an amount of Rs.25-00 / pole will be deducted from the contractor bill subject to without causing any damage to the ladder).
Cutting open Cement concrete road surface with concrete saw cutter and removal with Breaker.
Cement Concrete using 20mm (0.54cu.m) and 12mm (0.36cu.m) nominal size hard broken granite crushed metal from any source conforming to the relevant ISI standards for foundations etc., laidin layers o not more than 15cm thick well compacted including curing,, machine mixing, costand conveyance of all materials etc., complete. Note : Measurement boxes shall be used form easuring the quantities of cement,aggregate and water required for the given concrete mix - C.C (1:3:6)
Plastering in Cement mortar 12 mm thick using best river sand from approved quarry including cost and conveyance of all materials, screening, curing, rounding of corners, incidental charges as directed during execution complying with standard specifications etc., complete for the following proportions. - do- in C.M( 1:5)
NOTE (i)The rates are of basic rates excluding GST. (ii) The applicable GST will be reimbursed/paid as per actuals on production of proof. (iii)Statutory deductions will be made as per norms, if applicable. Any modalities imposed on GST by the Government from time to time, the same will be implemented.
Painting to the existing 7.5 mtrs height with Single/ double stem steel tubular poles / pipes of street lights / Road light / Yard lights including stems, MS boxes / cross arms / GI pipes clamps to the pole with one coat of enamel paint of approved colour from coping to a height of 1 Mtr and single/ double stem pipe of approved colour and painting the remaining pole with one coat of aluminium paint & painting one coat of AcrylicExterior Emulsion paint to the pole coping as directed during execution. Necessary ladder / scaffolding arrangement is to be made by contractor at his cost. (If departmental ladder is used an amount of Rs.25-00 / pole will be deducted from the contractor bill subject to without causing any damage to the ladder).
Painting to the existing 8 mtrs height with Single/ double stem steel tubular poles / pipes of street lights / Road light / Yard lights including stems, MS boxes / cross arms / GI pipes clamps to the pole with one coat of enamel paint of approved colour from coping to a height of 1 Mtr and single/ double stem pipe of approved colour and painting the remaining pole with one coat of aluminium paint & painting one coat of AcrylicExterior Emulsion paint to the pole coping as directed during execution. Necessary ladder / scaffolding arrangement is to be made by contractor at his cost.
(If departmental ladder is used an amount of Rs.25-00 / pole will be deducted from the contractor bill subject to without causing any damage to the ladder).
Painting to the existing 9 mtrs height with Single/ double stem steel tubular poles / pipes of street lights / Road light / Yard lights including stems, MS boxes / cross arms / GI pipes clamps to the pole with one coat of enamel paint of approved colour from coping to a height of 1 Mtr and single/ double stem pipe of approved colour and painting the remaining pole with one coat of aluminium paint & painting one coat of AcrylicExterior Emulsion paint to the pole coping as directed during execution. Necessary ladder / scaffolding arrangement is to be made by contractor at his cost. (If departmental ladder is used an amount of Rs.25-00 / pole will be deducted from the contractor bill subject to without causing any damage to the ladder).
Painting to the existing 10 mtrs height with Single/ double stem steel tubular poles / pipes of street lights / Road light / Yard lights including stems, MS boxes / cross arms / GI pipes clamps to the pole with one coat of enamel paint of approved colour from coping to a height of 1 Mtr and single/ double stem pipe of approved colour and painting the remaining pole with one coat of aluminium paint & painting one coat of AcrylicExterior Emulsion paint to the pole coping as directed during execution. Necessary ladder / scaffolding arrangement is to be made by contractor at his cost. (If departmental ladder is used an amount of Rs.25-00 / pole will be deducted from the contractor bill subject to without causing any damage to the ladder).
Painting to the existing 11 mtrs height with Single/ double stem steel tubular poles / pipes of street lights / Road light / Yard lights including stems, MS boxes / cross arms / GI pipes clamps to the pole with one coat of enamel paint of approved colour from coping to a height of 1 Mtr and single/ double stem pipe of approved colour and painting the remaining pole with one coat of aluminium paint & painting one coat of AcrylicExterior Emulsion paint to the pole coping as directed during execution. Necessary ladder / scaffolding arrangement is to be made by contractor at his cost. (If departmental ladder is used an amount of Rs.25-00 / pole will be deducted from the contractor bill subject to without causing any damage to the ladder).
Painting to the existing 12 mtrs height with Single/ double stem steel tubular poles / pipes of street lights / Road light / Yard lights including stems, MS boxes / cross arms / GI pipes clamps to the pole with one coat of enamel paint of approved colour from coping to a height of 1 Mtr and single/ double stem pipe of approved colour and painting the remaining pole with one coat of aluminium paint & painting one coat of AcrylicExterior Emulsion paint to the pole coping as directed during execution. Necessary ladder / scaffolding arrangement is to be made by contractor at his cost. (If departmental ladder is used an amount of Rs.25-00 / pole will be deducted from the contractor bill subject to without causing any damage to the ladder).
Cutting open Cement concrete road surface with concrete saw cutter and removal with Breaker.
Cement Concrete using 20mm (0.54cu.m) and 12mm (0.36cu.m) nominal size hard broken granite crushed metal from any source conforming to the relevant ISI standards for foundations etc., laidin layers o not more than 15cm thick well compacted including curing,, machine mixing, costand conveyance of all materials etc., complete. Note : Measurement boxes shall be used form easuring the quantities of cement,aggregate and water required for the given concrete mix - C.C (1:3:6)
Plastering in Cement mortar 12 mm thick using best river sand from approved quarry including cost and conveyance of all materials, screening, curing, rounding of corners, incidental charges as directed during execution complying with standard specifications etc., complete for the following proportions. - do- in C.M( 1:5)
NOTE (i)The rates are of basic rates excluding GST. (ii) The applicable GST will be reimbursed/paid as per actuals on production of proof. (iii)Statutory deductions will be made as per norms, if applicable. Any modalities imposed on GST by the Government from time to time, the same will be implemented.
(Rupees Three lakhs fourteen thousands four hundred ninety five and paise nine only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ 88.xls
TENDER_DOCUMENT • 2.01 MB
NIT 88.docx
TENDER_DOCUMENT • 0.17 MB
NIT 88.xlsx
TENDER_DOCUMENT • 0.02 MB
Download all tender documents and submit your bid