Chief Officer Viramgam Nagar Seva Sadan, Viramgam.
Construction Work for C.C. Road Repairing Work form Different area Viramgam Nagarpalika , Viramgam
340128
8 of 2026
Open
Miscellaneous Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹1,770
Chief Officer, Viramgam Nagarpalika
₹30,687
29 Aug 2026
29 Aug 2026
29 Aug 2026
10 Sept 2026
29 Aug 2026
Name of Work :- Construction Work for C.C. Road Reparing Work form Different area
Viramgam Nagarpalika , Viramgam
Memorandum showing items works to be carried out :
Item QuantitiesE Item Of Work Tendered Unit Total Amount
Item QuantitiesE Item Of Work Tendered Unit Total Amount
No. stimated Rate according to
Qty. In Figure estimated
Kuvarba Society various Gali
Box cutting the road surface to proper slope and camber for making
a base for road work including removing the excavated stuff and
1 63.00 depositing on the road side slope as directed upto 50 mts. Lead. Add 152.91 Cu.Mt
Lead for 2.00 K.M (101.91+49.49 = 151.40) Lead Page no Item
Providing & laying cement concrete 1:4:8 (1 cement : 4 coarse sand
: 8 Crushed stone aggregates 40 mm nominal size) and excluding
cost of reinforcement in reinforced concret for following grades,
machine vibrated concrete using graded hard stone aggregate of
2 28.00 40mm nominal size obtained from quarry including mechanical 2830.46 Cu.Mt
mixing, mechanical vibrating, compaction, finishing, curing
Completed as approved by the Architect and Engineer-in-charge, in
cement mortar in proportion recommended by the manufacturer..,
(A) Foundation and plinth.
Providing and laying controlled cement concrete M.200 and curing
complete excluding the cost of formwork and reinforcement for
reinforced concrete work in (A) Foundations, footings, Base of
columns and Mass concret
Raising of I.C. Chamber av 0.180 mtrs Height with Brick Masonary
in C.M 1:6 at top including cost of excavation refiting of frame &
cover in C.C. 1:2:4, Plastring in C.M 1:3 curring % Disposal of
Dismentaling Material from site etc. Completed incl. all carting and
providing of materials which is required for the purpose (except
frame and Cover)
Panchakla To Bharvadi Darvaja
Box cutting the road surface to proper slope and camber for making a
base for road work including removing the excavated stuff and
1 119.00 depositing on the road side slope as directed upto 50 mts. Lead. Add 152.91 Cu.Mt
Lead for 2.00 K.M (101.91+49.49 = 151.40) Lead Page no Item code -
Providing & laying cement concrete 1:4:8 (1 cement : 4 coarse sand :
Crushed stone aggregates 40 mm nominal size) and excluding cost of
reinforcement in reinforced concret for following grades, machine
vibrated concrete using graded hard stone aggregate of 40mm
2 53.00 nominal size obtained from quarry including mechanical mixing, 2830.46 Cu.Mt
mechanical vibrating, compaction, finishing, curing Completed as
approved by the Architect and Engineer-in-charge, in cement mortar in
proportion recommended by the manufacturer.., (A) Foundation and
Providing and laying controlled cement concrete M.200 and curing
complete excluding the cost of formwork and reinforcement for
reinforced concrete work in (A) Foundations, footings, Base of
columns and Mass concret
Raising of I.C. Chamber av 0.180 mtrs Height with Brick Masonary in
C.M 1:6 at top including cost of excavation refiting of frame & cover in
4 3.00 C.C. 1:2:4, Plastring in C.M 1:3 curring % Disposal of Dismentaling 996.01 Nos
Material from site etc. Completed incl. all carting and providing of
materials which is required for the purpose (except frame and Cover)
Sevasadan To A.P.M.C
Box cutting the road surface to proper slope and camber for making
a base for road work including removing the excavated stuff and
1 152.00 depositing on the road side slope as directed upto 50 mts. Lead. Add 152.91 Cu.Mt
Lead for 2.00 K.M (101.91+49.49 = 151.40) Lead Page no Item
Providing & laying cement concrete 1:4:8 (1 cement : 4 coarse sand
: 8 Crushed stone aggregates 40 mm nominal size) and excluding
cost of reinforcement in reinforced concret for following grades,
machine vibrated concrete using graded hard stone aggregate of
2 68.00 40mm nominal size obtained from quarry including mechanical 2830.46 Cu.Mt
mixing, mechanical vibrating, compaction, finishing, curing
Completed as approved by the Architect and Engineer-in-charge, in
cement mortar in proportion recommended by the manufacturer..,
(A) Foundation and plinth.
Providing and laying controlled cement concrete M.200 and curing
complete excluding the cost of formwork and reinforcement for
reinforced concrete work in (A) Foundations, footings, Base of
columns and Mass concret
Raising of I.C. Chamber av 0.180 mtrs Height with Brick Masonary
in C.M 1:6 at top including cost of excavation refiting of frame &
cover in C.C. 1:2:4, Plastring in C.M 1:3 curring % Disposal of
Dismentaling Material from site etc. Completed incl. all carting and
providing of materials which is required for the purpose (except
frame and Cover)
Dumana Road To Munsar Pumping Station
Box cutting the road surface to proper slope and camber for making
a base for road work including removing the excavated stuff and
1 34.00 depositing on the road side slope as directed upto 50 mts. Lead. Add 152.91 Cu.Mt
Lead for 2.00 K.M (101.91+49.49 = 151.40) Lead Page no Item
Providing & laying cement concrete 1:4:8 (1 cement : 4 coarse sand
: 8 Crushed stone aggregates 40 mm nominal size) and excluding
cost of reinforcement in reinforced concret for following grades,
machine vibrated concrete using graded hard stone aggregate of
2 15.00 40mm nominal size obtained from quarry including mechanical 2830.46 Cu.Mt
mixing, mechanical vibrating, compaction, finishing, curing
Completed as approved by the Architect and Engineer-in-charge, in
cement mortar in proportion recommended by the manufacturer..,
(A) Foundation and plinth.
Providing and laying controlled cement concrete M.200 and curing
complete excluding the cost of formwork and reinforcement for
reinforced concrete work in (A) Foundations, footings, Base of
columns and Mass concret
Raising of I.C. Chamber av 0.180 mtrs Height with Brick Masonary
in C.M 1:6 at top including cost of excavation refiting of frame &
cover in C.C. 1:2:4, Plastring in C.M 1:3 curring % Disposal of
Dismentaling Material from site etc. Completed incl. all carting and
providing of materials which is required for the purpose (except
frame and Cover)
Dhuniya Tanki To Kasampura To Raiyapur Gate
Box cutting the road surface to proper slope and camber for making
a base for road work including removing the excavated stuff and
1 432.00 depositing on the road side slope as directed upto 50 mts. Lead. Add 152.91 Cu.Mt
Lead for 2.00 K.M (101.91+49.49 = 151.40) Lead Page no Item
Providing & laying cement concrete 1:4:8 (1 cement : 4 coarse sand
: 8 Crushed stone aggregates 40 mm nominal size) and excluding
cost of reinforcement in reinforced concret for following grades,
machine vibrated concrete using graded hard stone aggregate of
2 192.00 40mm nominal size obtained from quarry including mechanical 2830.46 Cu.Mt
mixing, mechanical vibrating, compaction, finishing, curing
Completed as approved by the Architect and Engineer-in-charge, in
cement mortar in proportion recommended by the manufacturer..,
(A) Foundation and plinth.
Providing and laying controlled cement concrete M.200 and curing
complete excluding the cost of formwork and reinforcement for
reinforced concrete work in (A) Foundations, footings, Base of
columns and Mass concret
Raising of I.C. Chamber av 0.180 mtrs Height with Brick Masonary
in C.M 1:6 at top including cost of excavation refiting of frame &
cover in C.C. 1:2:4, Plastring in C.M 1:3 curring % Disposal of
Dismentaling Material from site etc. Completed incl. all carting and
providing of materials which is required for the purpose (except
frame and Cover)
Near Ananad Enterprise
Box cutting the road surface to proper slope and camber for making
a base for road work including removing the excavated stuff and
1 5.00 depositing on the road side slope as directed upto 50 mts. Lead. Add 152.91 Cu.Mt
Lead for 2.00 K.M (101.91+49.49 = 151.40) Lead Page no Item
Providing & laying cement concrete 1:4:8 (1 cement : 4 coarse sand
: 8 Crushed stone aggregates 40 mm nominal size) and excluding
cost of reinforcement in reinforced concret for following grades,
machine vibrated concrete using graded hard stone aggregate of
2 2.00 40mm nominal size obtained from quarry including mechanical 2830.46 Cu.Mt
mixing, mechanical vibrating, compaction, finishing, curing
Completed as approved by the Architect and Engineer-in-charge, in
cement mortar in proportion recommended by the manufacturer..,
(A) Foundation and plinth.
Providing and laying controlled cement concrete M.200 and curing
complete excluding the cost of formwork and reinforcement for
reinforced concrete work in (A) Foundations, footings, Base of
columns and Mass concret
Raising of I.C. Chamber av 0.180 mtrs Height with Brick Masonary
in C.M 1:6 at top including cost of excavation refiting of frame &
cover in C.C. 1:2:4, Plastring in C.M 1:3 curring % Disposal of
Dismentaling Material from site etc. Completed incl. all carting and
providing of materials which is required for the purpose (except
frame and Cover)
Musubir Baba Home To Main Road
Box cutting the road surface to proper slope and camber for making
a base for road work including removing the excavated stuff and
1 16.00 depositing on the road side slope as directed upto 50 mts. Lead. Add 152.91 Cu.Mt
Lead for 2.00 K.M (101.91+49.49 = 151.40) Lead Page no Item
Providing & laying cement concrete 1:4:8 (1 cement : 4 coarse sand
: 8 Crushed stone aggregates 40 mm nominal size) and excluding
cost of reinforcement in reinforced concret for following grades,
machine vibrated concrete using graded hard stone aggregate of
2 7.00 40mm nominal size obtained from quarry including mechanical 2830.46 Cu.Mt
mixing, mechanical vibrating, compaction, finishing, curing
Completed as approved by the Architect and Engineer-in-charge, in
cement mortar in proportion recommended by the manufacturer..,
(A) Foundation and plinth.
Providing and laying controlled cement concrete M.200 and curing
complete excluding the cost of formwork and reinforcement for
reinforced concrete work in (A) Foundations, footings, Base of
columns and Mass concret
Raising of I.C. Chamber av 0.180 mtrs Height with Brick Masonary
in C.M 1:6 at top including cost of excavation refiting of frame &
cover in C.C. 1:2:4, Plastring in C.M 1:3 curring % Disposal of
Dismentaling Material from site etc. Completed incl. all carting and
providing of materials which is required for the purpose (except
frame and Cover)
Kasambhai Memon Home To Main
Box cutting the road surface to proper slope and camber for making
a base for road work including removing the excavated stuff and
1 7.00 depositing on the road side slope as directed upto 50 mts. Lead. Add 152.91 Cu.Mt
Lead for 2.00 K.M (101.91+49.49 = 151.40) Lead Page no Item
Providing & laying cement concrete 1:4:8 (1 cement : 4 coarse sand
: 8 Crushed stone aggregates 40 mm nominal size) and excluding
cost of reinforcement in reinforced concret for following grades,
machine vibrated concrete using graded hard stone aggregate of
2 3.00 40mm nominal size obtained from quarry including mechanical 2830.46 Cu.Mt
mixing, mechanical vibrating, compaction, finishing, curing
Completed as approved by the Architect and Engineer-in-charge, in
cement mortar in proportion recommended by the manufacturer..,
(A) Foundation and plinth.
Providing and laying controlled cement concrete M.200 and curing
complete excluding the cost of formwork and reinforcement for
reinforced concrete work in (A) Foundations, footings, Base of
columns and Mass concret
Raising of I.C. Chamber av 0.180 mtrs Height with Brick Masonary
in C.M 1:6 at top including cost of excavation refiting of frame &
cover in C.C. 1:2:4, Plastring in C.M 1:3 curring % Disposal of
Dismentaling Material from site etc. Completed incl. all carting and
providing of materials which is required for the purpose (except
frame and Cover)
Daya Bhai Kandoi Gali to Usmanbhai Kapad Ni Dukan
Box cutting the road surface to proper slope and camber for making
a base for road work including removing the excavated stuff and
1 6.00 depositing on the road side slope as directed upto 50 mts. Lead. Add 152.91 Cu.Mt
Lead for 2.00 K.M (101.91+49.49 = 151.40) Lead Page no Item
Providing & laying cement concrete 1:4:8 (1 cement : 4 coarse sand
: 8 Crushed stone aggregates 40 mm nominal size) and excluding
cost of reinforcement in reinforced concret for following grades,
machine vibrated concrete using graded hard stone aggregate of
2 3.00 40mm nominal size obtained from quarry including mechanical 2830.46 Cu.Mt
mixing, mechanical vibrating, compaction, finishing, curing
Completed as approved by the Architect and Engineer-in-charge, in
cement mortar in proportion recommended by the manufacturer..,
(A) Foundation and plinth.
Providing and laying controlled cement concrete M.200 and curing
complete excluding the cost of formwork and reinforcement for
reinforced concrete work in (A) Foundations, footings, Base of
columns and Mass concret
Raising of I.C. Chamber av 0.180 mtrs Height with Brick Masonary
in C.M 1:6 at top including cost of excavation refiting of frame &
cover in C.C. 1:2:4, Plastring in C.M 1:3 curring % Disposal of
Dismentaling Material from site etc. Completed incl. all carting and
providing of materials which is required for the purpose (except
frame and Cover)
TOTAL NET AMOUNT
Estimated amount Estimated amount
Put to tender Rs ……............. Put to tender Rs……............
Deduct .............% below Rs………… Add............% above Rs……………
Total Rs………… Total Rs……………
(*Please strike out whichever is not applicable).
Note : 1 All work shall be carried out as per Public Works Department Handbook and other specifications of Division or as
GM\Wv! AW]\ H SFD AF\WSFD lJEFUGL 5]l:TSF VG[ l0JLhGGL ALHL BF; lJUT D]HA VYJF ;}RGF 5|DF6[ SZL VF5JFG]\ ZC[X[P
Note : 2 All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the
contractor under this signature.
GM\W o Z VG];}lRDF\ AWF BFGFGL lJUTM ;CLYL EZJL VG[ K[<,F BFGFGL GM\WMGM ;ZJF/M SZL SMg8=FS8Z[ 5MTFGL ;CL SZJLP
Note : 3 Rates quoted include clearance of site (prior commencement of work and at its close) in all respects and hold good for
work under all conditions, site, moisture, weather etc.
GM\Wv# o 8F\S[,F NZDF\4 :Y/GL sSFDGF VFZ\E[ VG[ 5}~ YFI T[ JBT[fNZ[S ZLT[ ;FO;}OL SZJFGM\ ;DFJ[X YFI K[4 VG[ T[ NZ TDFD 5lZl:YlT4 :Y/4 E[H4 CJFDFG JU[Z[
C[9/ SFD VD,DF\ ZC[X[P
Note : 4 To be continued on additional sheets, if found necessary.
GM\Wv$ o H~Z H6FI JWFZFGF SFU/M HM0L RF,]\ ZFBJ]\P
Viramgam Nagarpalika
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Standard Bidding Document.pdf
2 .SCHEDUAL-B.pdf
3. General Nots condictions C.C Road W.D.pdf
4.General Techinacal Specification.pdf
5.BUILDINGSPECIFICATIONSBOOK.pdf
5.Standards for Cement Con. Dt.11-5-2017.pdf
6.Testing Schedule Dt.24-10-1994.pdf
TENDER SARTO.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].