Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | ₹1.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.6 LAdmitted-Finance | ₹1.6 L | L2 | Admitted-Finance |
| 3 | L3₹1.6 LAdmitted-Finance | ₹1.6 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S HARI OM ENTERPRISES L1 | VEE AUTO TRADERS L3 | R M ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00 | Complete cleaning and servicing of window/split air conditioners of different capacities installed at various locations of Govt. Medical College, Jammu, by way of disconnecting main supply to the air conditioners, then complete servicing of the air conditioners (indoor & outdoor units for the split ACs) and window air conditioners by way of extracting the window ACs from their slots. Chemical cleaning of cooling coils, spraying chemical cleaner over the coil surface using jet cleaner pump on both sides of coil for atleast 20 minutes and then spraying the fresh water on the coils till the foam goes away or till the chemical is washed off and the cleaning process is repeated till the fins and cooling coils are totally cleaned, then charging of the compressor with refrigerant and replacement of the damaged wiring if required and connecting the main supply to the units and trail run on full load. The job includes 3 No’s of cleaning/servicing of all the split/window air conditioners in the season as and when required. Complete job in all respects including cost of material, labour, carriage, taxes etc. and also involves cost of technician as and when required through the season as per the instruction of the Site Engineer. | 200 | nos. | 0 ₹1,42,000 | 0.01 ₹1,46,520 | 0 ₹1,45,000 |
| 2.00 | Complete cleaning and servicing of cassette air conditioners i of different capacities installed at various locations of GMCH, Jammu, by way of disconnecting main supply to the air conditioners, then complete servicing of the air conditioners (indoor & outdoor units) . Chemical cleaning of cooling coils, spraying chemical cleaner over the coil surface using jet cleaner pump on both sides of coil for atleast 20 minutes and then spraying the fresh water on the coils till the foam goes away or till the chemical is washed off and the cleaning process is repeated till the fins and cooling coils are totally cleaned, then charging of the compressor with refrigerant and replacement of the damaged wiring if required and connecting the main supply to the units and trail run on full load. The job includes 3 No’s of cleaning/servicing of all the air conditioners in the season as and when required. Complete job in all respects including cost of material, labour, carriage, taxes etc. and also involves cost of technician as and when required through the season as per the instruction of the Site Engineer. | 10 | nos. | 0 ₹10,300 | 0.01 ₹11,385 | 0 ₹10,500 |
Tender Value
₹1.6 L
EMD Value
₹3,500
Closing Date
6 May 2026, 4:00 pmClosed
XEN MH DIVISION GMCH JAMMU
XEN MH DIVISION GMCH JAMMU
COMPLETE CLEANING AND SERVICING OF WINDOW SPLIT ACS OF DIFFERENT CAPACITIES FOR UPCOMING SUMMER SEASON INSTALLED AT VARIOUS LOCATIONS OF GMCH, JAMMU.
2026_PWDJK_308826_1
MHDJ/e-NIT 21 of 2026-27
Open Tender
Repair and Maintenance Services
10 days
GMCH
as per enit
2 documents required · 2 mandatory
₹200
XEN MH DIVISION GMCH JAMMU
₹3,500
Yes
19 May 2026
27 Apr 2026
7 May 2026
27 Apr 2026
6 May 2026
29 Apr 2026
27 Apr 2026 - 6 May 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Executive Engineer, Mechanical & Hospital Division GMCH Jammu.
COMPLETE CLEANING AND SERVICING OF WINDOW/SPLIT AC’S OF DIFFERENT CAPACITIES (FOR UPCOMING SUMMER SEASON) INSTALLED AT VARIOUS LOCATIONS OF GMCH, JAMMU..
MHDJ/e-NIT 21 of 2026-27 Dated: 27.04.2026 Due : 06.05.2026
Sl. No. Item Code / Make Quantity Units Estimated Rate Addition / Deduction Rate including GST to be quoted by the bidder Rs. P Currency Convertion against each Item Quoted Currency in INR / Other Currency Rebate on old parts in Percentage (%) if any Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category Net Cost of item Rs. P
1 Complete cleaning and servicing of window/split air conditioners of different capacities installed at various locations of Govt. Medical College, Jammu, by way of disconnecting main supply to the air conditioners, then complete servicing of the air conditioners (indoor & outdoor units for the split ACs) and window air conditioners by way of extracting the window ACs from their slots. Chemical cleaning of cooling coils, spraying chemical cleaner over the coil surface using jet cleaner pump on both sides of coil for atleast 20 minutes and then spraying the fresh water on the coils till the foam goes away or till the chemical is washed off and the cleaning process is repeated till the fins and cooling coils are totally cleaned, then charging of the compressor with refrigerant and replacement of the damaged wiring if required and connecting the main supply to the units and trail run on full load. The job includes 3 No’s of cleaning/servicing of all the split/window air conditioners in the season as and when required. Complete job in all respects including cost of material, labour, carriage, taxes etc. and also involves cost of technician as and when required through the season as per the instruction of the Site Engineer. 200 nos. Excess(+) Full Conversion INR
2 Complete cleaning and servicing of cassette air conditioners i of different capacities installed at various locations of GMCH, Jammu, by way of disconnecting main supply to the air conditioners, then complete servicing of the air conditioners (indoor & outdoor units) . Chemical cleaning of cooling coils, spraying chemical cleaner over the coil surface using jet cleaner pump on both sides of coil for atleast 20 minutes and then spraying the fresh water on the coils till the foam goes away or till the chemical is washed off and the cleaning process is repeated till the fins and cooling coils are totally cleaned, then charging of the compressor with refrigerant and replacement of the damaged wiring if required and connecting the main supply to the units and trail run on full load. The job includes 3 No’s of cleaning/servicing of all the air conditioners in the season as and when required. Complete job in all respects including cost of material, labour, carriage, taxes etc. and also involves cost of technician as and when required through the season as per the instruction of the Site Engineer. 10 nos. Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_1000373.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid