| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC KOZHIKODE KERALA KL | ₹3.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.7 L+₹15,867.88 (4.46%)Rejected-AOC | ₹3.7 L+₹15,867.88 (4.46%) | L2 | Rejected-AOC OTHER THAN L1 |
| 3 | L3₹3.8 L+₹23,698.33 (6.67%)Rejected-AOC | ₹3.8 L+₹23,698.33 (6.67%) | L3 | Rejected-AOC OTHER THAN L1 |
| 4 | L4₹3.8 L+₹23,697.58 (6.67%)Rejected-AOC | ₹3.8 L+₹23,697.58 (6.67%) | L4 | Rejected-AOC OTHER THAN L1 |
| 5 | L5₹3.8 L+₹22,665.09 (6.38%)Rejected-AOC EDAKKANDY MANNIL AVALA P O KOYILANDI TALUK KOZHIKODE DISTRICT | KOZHIKODE | KERALA | 612906 | ₹3.8 L+₹22,665.09 (6.38%) | L5 | Rejected-AOC OTHER THAN L1 |
Tender Value
₹4.1 L
EMD Value
₹10,304
Closing Date
6 Nov 2024, 6:00 pmClosed
ae
ae lsgd
compound wall
2024_LSGD_698721_29
AE/LSGD/PGP/TN1
Open Tender
Civil Works - Others
Item Rate
180 days
purameri gp
Please refer Tender documents.
11 documents required · 11 mandatory
₹910
Yes
₹10,304
Yes
7 Dec 2024
30 Oct 2024
11 Nov 2024
30 Oct 2024
6 Nov 2024
30 Oct 2024
Amount
compound wall
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD171882/2024-2025:Dry rubble masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials,labour charges etc complete.
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
SASIKUMAR T M (BID ID -1966179)
KAREEM M (BID ID -1966737)
RAGHUDASAN (BID ID -1966974)
SKETCHUP ASSOCIATES (BID ID -1967495)
SUJANAPAL V.K (BID ID -1966830)
Bidder Name
KAREEM M
RAGHUDASAN
SKETCHUP ASSOCIATES
SUJANAPAL V.K
N P ASOKAN
SASIKUMAR T M
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1091962.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .