Loading…
Loading…
Tender Value
₹1.7 L
EMD Value
₹4,233
Closing Date
5 Jun 2026, 6:00 pmDue today
ASISTANT ENGINEER LSGD SECTION KIZHAKKOTH GP
ASISTANT ENGINEER LSGD SECTION KIZHAKKOTH GP
CIVIL WORK - ROADS
2026_LSGD_842426_8
22/2025/AE/LIDEW/KKTH
Open Tender
Civil Works - Roads
ASISTANT ENGINEER LSGD SECTION KIZHAKKOTH GP
Please refer Tender documents.
11 documents required · 11 mandatory
₹555
Yes
₹4,233
Yes
29 May 2026
29 May 2026
8 Jun 2026
29 May 2026
5 Jun 2026
29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1footpath | ||||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | 236.63 | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | 51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 1 | cum | 906.44 | ₹905.53 | BI01010001010000000000000515BI0100001115 |
| 1.003 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 8,483.41 | - | BI01010001010000000000000515BI0100001116 |
| 1.004 | OD478751/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | - | cum | 3,668.07 | - | BI01010001010000000000000515BI0100001117 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_1441943.xls
BOQ • 0.23 MB
413NIT.pdf
Tender Documents • 0.02 MB
413SBD.pdf
Tender Documents • 1.89 MB
Download all tender documents and submit your bid