Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical DHARCHULA DIST PITHORAGARH UTTARAKHAND | DHARCHULA | PITHORAGARH | UTTARAKHAND | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
Tender Value
₹83.6 L
EMD Value
₹1.4 L
Closing Date
26 Jun 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Office of EE Project Division Dehradun
Office of EE Project Division Dehradun
REPAIR and MAINTENANCE WORK DRAIN FOOTPATH and FOOT BATH DIPPING TANK SHEEP SHED 3 NO RESTORATION OF WATER LINE STORE 2 NO WATER TANK 10 KL AND ELECTRIFICATION WORK IN GOVTSHEEP BREEDING FARM AT PANGU PITHORAGARH
2024_IRDCE_72339_1
01/EE/2024-25
Open Tender
Civil Works
Item Rate
365 days
AT PANGU PITHORAGARH
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,720
Office of EE Project Division Dehradun
₹1.4 L
Office of EE Project Division Dehradun
27 Jun 2024
14 Jun 2024
26 Jun 2024
14 Jun 2024
26 Jun 2024
18 Jun 2024
18 Jun 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth | 48.6 | CUM | - | - |
| 2 | Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work.(Based on PWD specifications) | 35.09 | CUM | - | - |
| 3 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 20 Nominal mix (1:2:4) | 2.4 | CUM | - | - |
| 4 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 Brick masonry in 1:4 cement mortar | 25 | CUM | - | - |
| 5 | 15 mm cement plaster on the rough side of single or half brick wall of mix :1:4 (1 cement: 4 fine sand) | 152 | SQM | - | - |
| 6 | Cement Concrete (PCC M-30) Pavement:-
Construction of Un-reinforced, Cement concrete pavement, thickness as per design, over a prepeared sub base with 43 grade cement or any other type PCC Grade M-30, coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in pproved fixed side formwork (Steel channel, laying and fixing of wedges, steel plates including levelling the formwork and laying and fixing of 125 micron thick polythene film, as per drawing), spreading the concrete with shovels, rakes, compacted using needle, and plate vibrators, finished in ontinuous operation and curing of concrete slabs for 14 days, using curing compound where specified and water finishing to lines and grade as per drawings and technical specifications. | 15 | CUM | - | - |
| 7 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 39.38 | CUM | - | - |
| 8 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).All works upto plinth level | 9.54 | CUM | - | - |
| 9 | Centering shuttering including strutting, propping etc. and removal of form work FOUNDATION UP TO PLINTH | 7.11 | SQM | - | - |
| 10 | Centering shuttering including strutting, propping etc. and removal of form work Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 38.4 | SQM | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
Tender Document • 1.23 MB
SBDPangu.pdf
Tender Document • 2.32 MB
BOQ_86785.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .