Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1Accepted-AOC | ₹1 Quoted ₹443.87 | 1 | Accepted-AOC L-1 |
| 2 | 2₹488.11+₹44.24 (9.97%)Rejected-Finance SCO 83 2ND FLOOR SWASTIK VIHAR MDC SECTOR 5 PANCHKULA HARYANA | ₹488.11+₹44.24 (9.97%) | 2 | Rejected-Finance L-2 |
| 3 | 3₹2,118.25+₹1,674.38 (377.2%)Rejected-Finance VILLAGE UDHOWALI KALAN P O UDHONWALI KHURD TEHSIL D B N GURDASPUR | GURDASPUR | PUNJAB | 143505 | ₹2,118.25+₹1,674.38 (377.2%) | 3 | Rejected-Finance L-3 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
8 Oct 2020, 3:00 pmClosed
GENERAL MANAGER
THE HOSHIARPUR DISTT. CO-OP MILK PRODUCERS UNION LIMITED, MEHGROWAL ROAD, AJJOWAL, MILK PLANT HOSHIARPUR
ENGAGING LABOUR CONTRACTOR FOR VARIOUS JOBS
2020_Coop_53010_1
ENGAGING LABOUR CONTRACTOR FOR VARIOUS JOBS
Open Tender
Miscellaneous Services
Item Rate
365 days
HOSHIARPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
TIA
₹2 L
24 Dec 2020
5 Sept 2020
9 Oct 2020
5 Sept 2020
8 Oct 2020
5 Sept 2020
Amount
Arrangement of Milk Pouches in Trays including Lassi/Dahi Pouches in the tray & filling of Milk in cans, Shifting of Trays packed milk pouches including Lassi/Dahi Pouches and can in cold storage
Packing of White Butter in liner & Corrugated Boxes upto 15 kg and shifting to cold storage
Cleaning of Empty Plastic Trays for Milk Pouch, Kheer, Paneer, Dahi, Lassi, etc.
Packing of 25 kg SMP, WMP Bags from running powder plant & Stacking in godown in three shift
Packing of 10 kg of WMP tin from running powder plant & Stacking in godown in three shift
Soldering of 10 kg WMP tin with material & Gas packing (without Nitrogen Gas & LPG Gas)
Packing of Ghee including withdrwal of Packing Material from stores, filling, packing, strapping and shifting to Ghee Granulation room & shifting to Ghee Stores after two days
Packing of 1/2 ltr. tin
Packing of 1 ltr. tin
Packing of 1 ltr. Mono Carton (Machine Pack)
Packing of 2 ltr. tin
Packing of 5 ltr. tin
Packing of 15 kg tins & Shifting to Ghee Store
Loading/Unloading/Shifting of Milk Produsts or packing materials
Loading of city supply & other Milk Products
Shifting of consumer pack Ghee C. Boxes (12 ltr), 15 kg Ghee tin, 25 kg SMP/WMP bags & 10 kg WMP tins from Production to other stores within factory premises and vise versa.
Loading and Unloading of WMP/SMP 25 kg bags
Loading and Unloading of White Butter 15 kg box
Loading/unloading of empty SMP bags/Ghee tins & other materials in truk.
Loading/unloading of Store material received from out stations such as empty Ghee Tins, Polethne Liners, Craft Paper Bags, etc.
Shifting of Material from production section to store or one store to other store
Dock Reception Morning & Evening • Cleaning of Dock, Dump Tank, Can scrubber before starting & finishing of job. • Unload Milk cans for weighment and sampling . • Dumping in weighing bowl (Kanda) Cleaning of Lids & cans with can scrubber as well as manual.
DESIGN AND DECORE
N S RANDHAWA CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .