| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹57.3 LAccepted-AOC | ₹57.3 L | 1 | Accepted-AOC awarded |
| 2 | 2₹61.7 L+₹4.5 L (7.78%)Rejected-Finance VILLAGE SIVIAN DISTT BATHINDA | BATHINDA | PUNJAB | 151001 | ₹61.7 L+₹4.5 L (7.78%) | 2 | Rejected-Finance high bidder |
| Sl No | Description | Qty | Unit | EVERGREEN EARTH MOVERS L2 | DHILWAN CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods | 1 | cum | 89 ₹89 | 81 ₹81 Lowest |
| 2.00 | Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. | 1 | cum | 132 ₹132 | 115 ₹115 Lowest |
| 3.00 | Dressing of New Earthwork | 1 | sqm | 1.3 ₹1.3 | 1 ₹1 Lowest |
| 4.00 | Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. | 1 | cum | 161 ₹161 | 147 ₹147 Lowest |
| 5.00 | Re-handling of earthwork recently executed | 1 | cum | 68 ₹68 | 65 ₹65 Lowest |
| 6.00 | Dag belling single kassi stroke minimum 7.5 cm depth. | 1 | km | 848 ₹848 Lowest | 848 ₹848 Lowest |
| 7.00 | Dressing of Bed and preparation of sub grade for lining. CSR item no 19.1 | 1 | sqm | 12 ₹12 | 11 ₹11 Lowest |
| 8.00 | Dismentalling Of Brick Work ( As per CSR item NO. 8.5 (b)) | 1 | cum | 787 ₹787 | 754 ₹754 Lowest |
| 9.00 | Laying Ist class burnt brick Masonry laid in 1:6 with CSM for Bed & Side Walls | 1 | cum | 7,378 ₹7,378 | 7,066 ₹7,066 Lowest |
| 10.00 | 10mm thick Cement Plaster 1:4 ( for side walls ) | 1 | sqm | 193 ₹193 | 190 ₹190 Lowest |
Tender Value
₹42.0 L
EMD Value
₹84,080
Closing Date
28 Feb 2026, 2:00 pmClosed
Executive Engineer
Faridkot Canal and GW Division Faridkot
Estimate for Lining/Relining of watercourses of outlet RD 29297/L of Kotkapura Disty
2026_WR_160304_1
Estimate for Lining/Relining of watercourses of outlet RD 29297/L of Kotkapura Disty
Open Tender
Repair and Maintenance Services
Item Rate
30 days
Dhaipai
Pre Qualification Details
2 documents required · 2 mandatory
₹1,000
Yes
₹84,080
Yes
Faridkot
12 May 2026
14 Feb 2026
28 Feb 2026
14 Feb 2026
28 Feb 2026
14 Feb 2026
20 Feb 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Faridkot Canal Division, Faridkot
Name of Work: Estimate for Lining/Relining of watercourses of outlet RD 29297/L of Kotkapura Disty
Contract No: 01639-250059
Name of the Bidder/ Bidding Firm / Company :
Sl. No. C.S.R Item No./Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods cum Excess(+) Full Conversion INR
Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. cum Excess(+) Full Conversion INR
Dressing of New Earthwork sqm Excess(+) Full Conversion INR
Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. cum Excess(+) Full Conversion INR
Re-handling of earthwork recently executed cum Excess(+) Full Conversion INR
Dag belling single kassi stroke minimum 7.5 cm depth. km Excess(+) Full Conversion INR
Dressing of Bed and preparation of sub grade for lining. CSR item no 19.1 sqm Excess(+) Full Conversion INR
Dismentalling Of Brick Work ( As per CSR item NO. 8.5 (b)) cum Excess(+) Full Conversion INR
Laying Ist class burnt brick Masonry laid in 1:6 with CSM for Bed & Side Walls cum Excess(+) Full Conversion INR
10mm thick Cement Plaster 1:4 ( for side walls ) sqm Excess(+) Full Conversion INR
10mm thick Cement Plaster 1:4 ( for Floors& Top ) sqm Excess(+) Full Conversion INR
Supply & laying Dry Brick Bats cum Excess(+) Full Conversion INR
Centering and shuttering for faces of concrete sqm Excess(+) Full Conversion INR
RCC 1:2:4 hand mixed cum Excess(+) Full Conversion INR
Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete. qtl Excess(+) Full Conversion INR
Fixing of RCC Frame in Nakka No Excess(+) Full Conversion INR
First Class burnt Brick Masonary laid in cement sand mortar 1:6 in foundation and plinth . cum Excess(+) Full Conversion INR
First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth cum Excess(+) Full Conversion INR
Any other Item Nos Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Tendernotice_2.pdf
PDF • 0.58 MB
BOQ_325433.xls
BOQ • 0.28 MB
corrigendum29297kkp5.pdf
PDF • 0.29 MB
corrigendum29297kkp4.pdf
PDF • 0.40 MB
corrigendum29297kkp3.pdf
PDF • 0.35 MB
corrigendumitemchange29297kkp.pdf
PDF • 0.28 MB
corrigendum6works.pdf
PDF • 0.39 MB
corrigendumworks6new.pdf
PDF • 0.35 MB
corrigendum6watercoursesworks.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .