| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-Finance | ₹4.0 L | L1 | Accepted-Finance accepted |
| 2 | L2₹4.5 LAccepted-Finance | ₹4.5 L | L2 | Accepted-Finance accepted |
| 3 | L3₹4.6 LAccepted-Finance HIMACHAL PRADESH HP | HAMIRPUR | HIMACHAL PRADESH | 174304 | ₹4.6 L | L3 | Accepted-Finance accepted |
| 4 | L4₹4.6 LAccepted-Finance | ₹4.6 L | L4 | Accepted-Finance accepted |
| Sl No | Description | Qty | Unit | Vijay Kumar L3 | Biri Singh Govt Contractor L2 | Krishna Chand L4 | Indira Thakur L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of tile/ marble work in floors and roofs laid in cement mortor including stacking material upto a lead /head load of 500 mtrs as directed, within all lead & lifts,complete in all respect as per the direction of Engineer-in-charge. (A) For thickness of tiles 20 mm to 40 mm. thick | 219.02 | Sqm | 52 ₹11,389.04 | 49 ₹10,731.98 | 50 ₹10,951 | 200 ₹43,804 |
| 2.00 | Earth work in excavation by maually means upto all depths of the excavated earth and disposal of surplus excavated soil within all lead & lifts complete in all respect as per the direction of Engineer-in-charge. (A) All Kinds of Soil. | 109.28 | Cum | 360 ₹39,340.80 | 395 ₹43,165.60 | 400 ₹43,712 | 180 ₹19,670.40 |
| 3.00 | Carriage of excavated earth / material upto dumping site by manually /mules i.e. 500 meter head load and 5 kilometre mechanical carriage as directed complete in all respect as per the direction of Engineer-in-charge. | 109.28 | Cum | 360 ₹39,340.80 | 345 ₹37,701.60 | 350 ₹38,248 | 700 ₹76,496 |
| 4.00 | Supplying and filling, spreading & leveling stone boulders of size range 12.50 cm,thick, and in the required thickness, within all leads & lifts,complete in all respect as per the direction of Engineer-in-charge. | 37.58 | Cum | 1,575 ₹59,188.50 | 1,550 ₹58,249 | 1,600 ₹60,128 | 1,100 ₹41,338 |
| 5.00 | Centring and shuttering including structing, propping etc. and removal of form for within all leads & lifts,complete in all respect as per the direction of Engineer-in-charge. (A) Foundation, footing basis of columns et. For mass concrete complete in all respect. | 68.76 | Sqm | 340 ₹23,378.40 | 350 ₹24,066 | 400 ₹27,504 | 200 ₹13,752 |
| 6.00 | Providing and laying cement concrete in cement concrete of specified grade excluding thge cost of centring and shuttering:- All work upto plinth level 1:2:4 (1 Cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)complete in all respects within all leads and lifts as per the direction and best satisfaction of Engineer in charge. | 30.02 | Cum | 9,500 ₹2.9 L | 9,350 ₹2.8 L | 9,400 ₹2.8 L | 6,800 ₹2.0 L |
Tender Value
₹2.9 L
EMD Value
₹6,000
Closing Date
20 Jan 2026, 5:00 pmClosed
Chairman-cum- SDM SNDJI at Swarghat
Chairman-cum- SDM SNDJI at Swarghat Temple Trust Sh. Naina Devi Ji Distt. Bilaspur
Special Repair, Re-alignment of pedestrian path infornt of main Temple Complex from step no. 525 to 577 of 32 meter stretcg for TTSNDJI, Distt. Bilaspur (HP)
2026_NDTT_125539_1
TTND.Const (MA) 16-(11)-50/2025-1-12 Dated 01.01.2026
Open Tender
Civil Works
90 days
Bilaspur
Refer in SBD
9 documents required · 9 mandatory
₹350
Yes
Chairman-cum- SDM SNDJI at Swarghat Temple Trust
₹6,000
28 Jan 2026
13 Jan 2026
22 Jan 2026
13 Jan 2026
20 Jan 2026
13 Jan 2026
Dismantling of tile/ marble work in floors and roofs laid in cement mortor including stacking material upto a lead /head load of 500 mtrs as directed, within all lead & lifts,complete in all respect as per the direction of Engineer-in-charge. (A) For thickness of tiles 20 mm to 40 mm. thick
Earth work in excavation by maually means upto all depths of the excavated earth and disposal of surplus excavated soil within all lead & lifts complete in all respect as per the direction of Engineer-in-charge. (A) All Kinds of Soil.
Carriage of excavated earth / material upto dumping site by manually /mules i.e. 500 meter head load and 5 kilometre mechanical carriage as directed complete in all respect as per the direction of Engineer-in-charge.
Supplying and filling, spreading & leveling stone boulders of size range 12.50 cm,thick, and in the required thickness, within all leads & lifts,complete in all respect as per the direction of Engineer-in-charge.
Centring and shuttering including structing, propping etc. and removal of form for within all leads & lifts,complete in all respect as per the direction of Engineer-in-charge. (A) Foundation, footing basis of columns et. For mass concrete complete in all respect.
Providing and laying cement concrete in cement concrete of specified grade excluding thge cost of centring and shuttering:- All work upto plinth level 1:2:4 (1 Cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)complete in all respects within all leads and lifts as per the direction and best satisfaction of Engineer in charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
SBD.pdf
Tender Documents • 2.61 MB
BOQ_184983.xls
BOQ • 0.27 MB
GST.pdf
Additional Documents • 0.84 MB
Download all tender documents and submit your bid