₹4.4 Cr
EMD Value
₹4.4 L
Closing Date
5 Nov 2026, 5:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer, GIDC, Ahmedabad
Design, Engineering, Procurement, Supply, Installation, Testing and Commissioning of grid connected solar power plant System with automatic PV cleaning system and allied accessories including 5-year comprehensive warranty with O&M&R required at BOL (SANAND-II), GIDC, estate.
360535
08/2026-27
Open
Electrical Works
Works
Ahmedabad
4 documents required · 4 mandatory
₹7,080
Executive Engineer, GIDC, Ahmedabad
₹4.4 L
28 Oct 2026
28 Oct 2026
28 Oct 2026
5 Nov 2026
28 Oct 2026
NAME OF WORK: Design, Engineering, Procurement, Supply, Installation, Testing and
Commissioning of grid connected solar power plant System with
automatic PV cleaning system and allied accessories including 5-year
comprehensive warranty with O&M&R required at BOL (SANAND-II),
E-TENDERING NOTICE NO. 08 OF 2026-27 Sr. No.
PRICE BID (PART – III)
1 Estimated cost : Rs.
2 Tender fee : Rs.
The Tender with DD for Tender fee & DD to 17.00 hours.
/ FDR and BG (Bank Guarantee) for EMD
(by Scanning) except required documents
must upload on the web site of
www.gidc.nprocure.com
5 Date on (or before) which DD/FDR in :
original for Tender fee & EMD and other From 29/10/2026 & 30/10/2026 up
required documents must reach in the to 17.00 hour
office of the O/o Executive
Engineer(M&E), GIDC Ground Floor,
Khadi Gramodyog Board, Near Indian
Red Cross Society, Near Old Vadaj Circle,
Gandhi Ashram Road, Ahmedabad.
6 Opening of Technical Bid : 02/11/2026
7 Eligible class of Registered : Bidder should be as per
Prequalification criteria for Work -
(2.1) Eligibility and Having similar
EXECUTIVE ENGINEER(M&E)
Ground Floor, Khadi Gramodyog Board, Near Indian Red Cross Society,
Near Old Vadaj Circle, Gandhi Ashram Road, Ahmedabad.
E-Mail:- [email protected]
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
MEMORANDUM OF WORK IN BRIEF
Name of work Design, Engineering, Procurement, Supply,
Installation, Testing and Commissioning of
grid connected solar power plant System
with automatic PV cleaning system and
allied accessories including 5-year
comprehensive warranty with O&M&R
required at BOL (SANAND-II), GIDC, estate.
2) Estimated cost Rs.
3) Joint Venture (J.V.) Joint Venture (J.V.) is not allowed.
4a) Earnest Money Deposit (EMD) – Rs.
In the form of B.G Rs.50,000.00 in (By D.D. / F.D.R. only)
the form of D.D. / F.D.R for the
minimum period of 180 days in
favour of "Executive Engineer,
GIDC, Ground Floor, Khadi
Gramodyog Board, Near Indian and
Red Cross Society, Near Old Vadaj
Circle, Gandhi Ashram Road,
From any Nationalized /
Scheduled Bank only except Co-
Operative Bank. Remaining Rs.
Remaining (By Bank Guarantee – Kindly refer section-1
Rs. 3,91,042.00 in form of Bank of B1 regarding bank guarantee format )
Guarantee of the Schedule or
Nationalized Bank Only.
4b) EMD in the form of DD/FDR Rs. 4,41,042.00 (1% of Estimated Cost)
5) Validity period of tender offer. 120 days from the date of opening of online
tender in case of single cover system and
shall be counted from the date of opening
technical bid in case of two cover system.
6) Security deposit (SD) Rs. 44,10,419.00 (Forty Four lac Ten thousand Four
Hundred Nineteen only/-) 10% of the estimated cost put to tender to be paid by
successful bidder in the manner set out as under:-
(i) In the form of Small Saving scheme
or Security of Sardar Sarovar Rs. 11,02,605.00 (2.50 %)
Nigam of minimum one year time Which will be considered as initial S.D.
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
(ii) To be deducted from Rs. 11,02,605.00 (2.50 %)
Current R.A. bills. Which will be considered as remaining
TOTAL( i + ii ) Rs.
Percentage if any to be deducted from bills
so as to make up the total amount of
so as to make up the total amount of
required S. D. by the time half the work, as
measured by the cost is done 50%
iii) 5% of the Estimated cost put to Rs. 22,05,209.00 (5.00%) – Submitted
tender Rs. 22,05,209.00 (Twenty along with initial SD i.e. 6 (i) above
Two Lac Five thousand Two
hundred Nine Only) as
Performance Bond in the form of
B.G. of Nationalized Bank only or
N.S.C. / F.D. / S.S.N.N.L. in favour of
Executive Engineer, GIDC, Bharuch,
for validity period of 05 years, to
be paid along with initial security
7) Liquidated Damages As per clause No.2 of B-1 Form attached
8) Defect liability period Three years from the date of completion of
work.( As per clause No.17A,Sub clause- D
of B-1 Form attached herewith).
9) Comprehensive Maintenance 5 (Five) Years Comprehensive
(a) guarantee period. Maintenance Guarantee from the date of
actual completion of the work.
9) Comprehensive Maintenance The Comprehensive maintenance
(b) Guarantee Bond in the form of guarantee amount shall be 5% of the
Bank Guarantee of Nationalized / Estimated Cost or 5% of Approved tender
Scheduled Bank in favor of cost whichever is more and shall only be
Executive Engineer, GIDC, released after satisfactory completion of
Ahmedabad, for validity period of Comprehensive maintenance guarantee
05 years which effects from date of period of 05 (Five) years.
actual completion of the work. The Comprehensive maintenance
guarantee bond shall have to be executed
on non-judicial stamp paper in standard
10) Workers Welfare Cess Under The 1% of the value of work done shall be
Building & Other Construction deducted from the all bills payable to the
Workers Cess Act 1996 (Labour contractor.
11) Testing Charges GIDC will deduct 1% of the Estimated Cost
from each Running Account Bill against
the testing charges of materials.
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
12) Time limit for completion of work 12(Twelve) Calendar Months for SITC of
from the date of written order to CCTV work and 5 years for O&M&R work.
13) Other details :
ii) Submission date & time of tender
Date on (or before) which the From 14/10/2026 to 28/10/2026 up to
tender with DD / FDR for Tender 17.00 hours.
fee & EMD (by scanning) required
documents must upload on the
web site of www.gidc.nprocure.com
b) Date on (or before) which
DD/FDR in original for Tender fee
& EMD and required documents
must reach in the office of the E.E.,
Ground Floor, Khadi Gramodyog
Board, Near Indian Red Cross
Society, Near Old Vadaj Circle,
Gandhi Ashram Road, Ahmedabad.
(By Hand Delivery)
iii) Mode of sending the tender
The tender with DD for Tender fee By Online through e - tendering process
& DD / FDR and BG (Bank
Guarantee) for EMD (by scanning)
required documents
The tender with DD for Tender fee By Hand Delivery to Office of the Executive
& DD / FDR and BG (Bank Engineer(M&E), GIDC, Ground Floor, Khadi
Guarantee) for EMD in original Bhavan, Near Indian Red Cross Society at
with required documents Old Wadaj Circle, Ahmedabad
14) Opening of Technical bid 02/11/2026
15) Opening of Price Bid On evaluation of Technical Bid offer, Price
Bid of pre-qualified bidders only shall be
16) Tender to be opened by Superintending Engineer, Ground Floor,
Khadi Bhavan, Near Indian Red Cross
Society at Old Wadaj Circle, Ahmedabad.
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
17) Description essential to be made (1) Design, Engineering, Procurement, Supply,
on sealed cover for documents to Installation, Testing and Commissioning of
be submitted by Hand Delivery. grid connected solar power plant System with
automatic PV cleaning system and allied
accessories including 5-year comprehensive
warranty with O&M&R required at BOL
(SANAND-II), GIDC, estate.
to 17.00 hour (Only working days).
18) Mode of quoting the rate in In figures as well as in words. Any missed-
Schedule “B” attached with Tender outs, discrepancies it may attract rejection
document. of tender.
19) Contact Person Smt. Neha Acharya – Executive
Engineer(M&E), GIDC, Ahmedabad.
20) Important Note : For any technical discrepancy, the latest
version of IS CODE/other specified code
shall be applicable.
GIDC reserves the right, without any
obligation or liability, to accept or reject
any or all the bid at any stage of the
process, to cancel or modify the process
or any part thereof or to vary any of the
terms and conditions at any time, without
assigning any reason whatsoever.
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Preamble to Price Bid.
INFORMATION & INSTRUCTIONS FOR TENDERERS:
1.0 Mode of Submitting Tender :
The tenders shall be submitted in Electronic format only on online Web site
https://www.gidc.nrpocure.com till the date & time shown in tender notice.
Offers in Physical form will not be accepted in any case.
Bidders who wish to participate in online tenders will have to procure / should have
legally valid Digital Certificate (Class - III) as per Information Technology Act-2000
using which they can sign their electronic bids. Bidders can procure the same from any
of the license certifying Authority of India are as mentioned under:
Sr.No. Name of Certifying Agency Website Address
1. (n) Code solution (G.N.F.C.) www.gnvfc.com.
2. Safe crypt www.safescrypt.com.
3. TCS www.tcs.-ca.tcs.co.in
4. MTNL www.mtnltrustline.com
2.0 Tenderer to inform Himself:
Tenderer will be deemed to have inspected the site and to have satisfied himself as to
the nature of all works.
3.0 The tenderer must understand clearly that the rates quoted are for completed works
and include all costs due to labour, scaffolding paint, supervision, service work, power,
royalties and octroi etc. and include all extras to cover the cost of night work if and
when required and no claim for additional payment beyond the price! rates quoted will
be entertained and the tenderers will not be entitled subsequently to make any claim on
the ground of misrepresentation or on the ground that he was supplied with
information given by any person ( whether the member is the employee of Public Works
Department or not). Any failure on his part to obtain all necessary information for the
purpose of making his tender and filling the several prices and rates therein shall not
relieve him from any risks or liabilities arising out of or consequent upon the
submission of the tender.
4.0 Quoting of Rates :-
The Tenderer shall quote the rate per' unit for all items listed in Schedule B in figures as
well as in words. Thereafter the system will work out the total amount of each item in
well as in words. Thereafter the system will work out the total amount of each item in
Column No.7 of Schedule B and sum-up the total at the end of column NO.7 on each page
and on last page of Schedule B. After striking the total of all items, he may give rebate if
he desires on the total amount so worked out and thereafter express in the figures, as
he desires on the total amount so worked out and thereafter express in the figures, as
the net amount of his offer which will be termed as "Tendered Amount".
The following rule shall apply only to the works having estimated cost above Rs.
100 lacs (Rupees One Hundred lacs). (G.R. R & BD No. TNC - 1777 - 281-C, dated 30-
7-1992 may be referred to)
(a) Tenderers are normally not permitted to suggest any alteration in the works specified
in the tender form or in the time allowed for carrying out the work or any other
conditions of any sort. However, if it is felt necessary by the tenderer to have any
conditions, he shall have to clearly mention the same in very clear terms in the
appropriate section of technical bid. The tenderer will have to fill in necessary details
online in 'technical bid' and 'price-bid' separately. No such tender shall include more
than one work but contractors who wish to tender for two or more works shall submit a
separate tender for each work online.
(b) If a price bid contains any conditions, the same shall be rejected outright.
(c) It should be very clearly understood by all the tenderers that the technical bid should be
restricted only to technical matters and conditions / stipulations having financial
implications. The Technical and Price' bids shall contain adequate cross reference
wherever necessary to ensure clear and proper correlation of them with two bids
without any ambiguity whatsoever. The price bid of main tender should not be
disclosed In the technical bid.
(d) The technical bid will be opened first online as per schedule or any other suitable time
thereafter by the competent tender opening authority of the Government. Bidders who
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
wish may remain present. The technical bid shall be evaluated first and wanting details,
if any, and clarifications in respect of conditions if any will be called from the tenderers.
In such case, the contractor will be required to submit clarification / details (including
with respect to conditions if any) within the stipulated time allowed for the purpose. If
the contractor does not furnish the wanting details / clarification in time, his tender
would be liable for rejection.
(e) The conditions specified in technical bid should invariably be accompanied by proper
financial evaluation with mode of calculation specifying assumptions, quantities, rate
and ceiling amounts for each condition and shall also accompany the information in the
form stating (a) Sr. No. (b) Description of the condition (c) Financial evaluation. (Vide R
& B.D.G.R. No. /TNC / 7777 / 281-C, dated 30-9-92) (d) Ceiling amount to be added in
price-bid, in case condition is not accepted.
(f) Ceiling amounts shall be binding on the contractors and are liable to be added to the
(g) The evaluation as given by the contractor as modified by tender opening authority with
the ceiling limit will then be intimated to all the tenders. No further opportunity shall be
given to the contractors to modify/withdraw conditions at that stage. After completion
of evaluation of the technical bid in all respects the competent authority will decide
about date of opening of price-bid and the same will be intimated to the bidders. After
opening of price-bid and their evaluation the tender inviting authority reserves the
right to negotiate about the tender (s) further with any or all the contractors.
5.0 Accompaniments of Tender: (to be submitted in electronic format only
through on line (by scanning) as duly certified true copies)
The contractor shall have to furnish:
(i) Demand Draft of Tender fee and Earnest Money or Earnest Money Exemption
(ii) Copy of Partnership Deed or Memorandum as well as Articles of Association in case of
the company and intimate permanent addresses of his partners/ Directors of Company.
All copies submitted shall be duly attested.
(iii) Copies of certificate regarding previous experience as required.
(iv) Declaration showing all works completed during preceding 5years and works on hand
with the Contractor and the value of works that remained to be executed in each case.
(v) A certificate of Registration as approved contractor of prescribed category from
authorities stipulated in Notice Inviting Tenders.
(vi) PAN issued by Income-Tax Department.
(vii) Copy of Provident Fund Registration - Code no.
(viii) Duly filled in and digitally signed declaration form as provided after as last item of
section-1 & Memorandum duly filled in & digitally signed as given in section-2.
(ix) A Solvency certificate of an amount equal to 20 per cent of the amount of work
put to tender will have to be produced. Such solvency certificate should be issued
by either Scheduled banker a Nationalized bank.
(x) Required Annexure duly filled in when prequalification in involved.
Required documents are to be submitted in electronic format only as part
of tender document Failing which the tender will be rejected outright and
will be considered as NON-RESPONSIVE.
6.0 Tender liable to be Invalid:
It may please be noted that the tender is liable to be considered invalid especially, if the
requirements as per Instruction No. (i) to (ix) above are not complied with.
7.0 Right of rejection of tenders.
(i) Right is reserved by the Tender Inviting Authority to reject any or all tender(s) without
assigning any reason thereof.
(ii) In addition to the above, the tender will also be liable to be rejected outright if:
(a) The tenderer proposes any alteration in the work specified or in the time
allowed for carrying out the work or in any condition.
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
(b) The tenderer or in the case of a firm, each partner or the person holding the
power of attorney thereof does not digitally sign section-2 or signatures is/are
not attested by a witness.
(c) Any person who submits a tender shall fill forms online Including the rates of
items put to tender. No single tender shall include more than one work but
contractors who wish to tender for two or more works shall submit a separate
tender for each work online.
8.0 Method of Tendering : -
8.1 If the tender is made by an individual, it shall be digitally signed by the individual above
his full name and current address.
8.2 If the tender is made by a proprietary firm, it shall be digitally signed by the proprietor
above his full name and the full name of his firm with its current address.
8.3 If the tender is made by a firm of partnership, it shall be digitally signed by a partner of
the firm holding the power of attorney and digital certificate for the firm. A certified
copy of the power of attorney shall be provided in physical form along with other
documents. A certified copy of the partnership deed, full name and current address of
the firm and full names and the current addresses of all the partners of the firm shall
also be provided along with other documents.
8.4 If the tender is made by a limited company or a limited corporation, it shall be digitally
signed by a duly authorized person holding digital certificate for the company
/corporation and power of attorney for signing the tender in which case a certified copy
of the power of attorney shall be provided separately in physical form along with other
documents. Such limited Company or Corporation may be required to furnish
satisfactory evidence of its existence before the contract is awarded.
8.5 All digital signatures in the tender document shall be dated.
9.0 Eligibility and qualification requirement.
To establish acceptability of the offer to the satisfaction of Tender Inviting Authority the
tenderer shall provide the following:
9.1 Details of plant and machinery immediately available with tenderer for use on the
9.2 Details of plant and machinery proposed to be procured for the works
9.3 Details of technical, supervisory and administrative personnel already employed by the
tenderer that he proposes to utilize for this work and such other personnel he proposes
to employ further for this work
9.4 Copies of registration certificate and PAN allotted by income Tax Office.
9.5 Separate notes in sufficient details on each of the following:
(i) Method and technique of construction
(ii) Sequence of execution of various important components of the work;
(iii) Cash-flow arrangement
10.0 Deviation or modifications In Tender Documents:
10.1 All tenderers are cautioned that tender containing any condition and/or deviation from
tile contractual terms and conditions, specifications, quoting / offering rates/prices in
different manner than specified in the tender and/or any other requirements of tender
shall make the tender liable for outright rejection and shall be considered as non
responsive for all practical purposes. The decision of the Tender inviting authority in
this regard shall be final and binding to the tenderer.
10.2 Alternative tenders are not acceptable.
11.0 Tender validity period:
The tender for the work shall remain open for a period of 120 days.
12.0 The successful contractor shall exhibit the board in prominent place of worksite
showing the brief details of project! work under execution, financier, cost of work and
broad details of inputs specifications and targeted goals.
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
13.0 The contractor will not use the premises of project / work under construction for his
staff, labourers or for any other purpose. If he do so, market rent for such unauthorized
used will be recovered. The marker rent will be decided by the Engineer-in-charge.
25.0 All statutory taxes deductible at source under various acts and notifications by the
Government shall be deducted while making payment for which T.D.S. certificate shall
26.0 Declarations:
The tenderer will have to make declaration enlisted in the form attached herewith and
shall affix his signature to the form in token of correctness of declarations made therein,
(G.R, R & BD No. TNC-IIB-22 (1 O)-C, dated 24-5-90 should be referred to).
DECLARATION FORM
(i) I/We hereby declare that I/we have visited the site and fully acquainted myself
ourselves with the local situations regarding materials, labour and other factors
pertaining to the work before submitting this tender.
(ii) I/We hereby declare that I/We have carefully studied the conditions of contract,
specifications and other documents of this work and agree for executing the same
(iii) We agree to receive payments, if delay is due to late receipt of grant -in-aid from
Government for Panchyat works. (Applicable to Panchayat works only)
DECLARATION CERTIFICATE (G.R. dtd 4-2-89 as revised by GR.No.TNC-
(iv) I/We hereby declare that my/our near relative are not working in this Division or in its
sub-division as an Ex. Engineer, Deputy Executive Engineer, Assistant Engineer,
Additional Assistant Engineer, overseer, Divisional Accountant, Store Keeper, Manager
of Atithi / Vishram Gruha and in the circle as a Superintending Engineer in addition for
Panchayat works not working nor having posting as chairman of P.W. committee or as
incumbent in Jilla Panchayat at today.
(Digital Signature of the Contractor with Seal)
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
1. ( Solar Power Plant) Design,
Engineering, Procurement, Supply,
Installation, Testing and Commissioning
Mono PERC Crystalline or as
approved by GIDC silicon terrestrial
photovoltaic (PV) modules( Any Nos-
minimum 550 Wp/Module) high
power solar cells shall be used in solar
photo voltaic module as per BIS, IEC
61215/IS: 14286 & IEC 61853 amended
upto Latest standard & each PV modular
used must have a RF identification tag.
The minimum power rating shall not be
less that 550 Wp, supplying & fixing of
XLPO insulated copper conductor cables
of suitable sizes to connect the solar
modules interconnection cables to AJB &
photo electric conversion efficiency of
SPV modules shall have minimum 16%.
It shall perform satisfactorily in relative
humility upto 100% with temperature
1 variation between 0 Degree C to (+)65
Degree C. with stand wind speed upto
180 KM/Hr from back side of panel etc.
as required. The Job included Integrated
EB grid connected/synchronisation &
commissioning the total(KWp) as
mentioned below solar photo
voltaic(SPV) power plant as per
technical document. Note: Optimum
wattage of each module, no of modules
considered & technical details should be
given. The PV modules used must
qualify to the latest edition of IEC PV
module Qualification test or equivalent
BIS standards Crystalline Silicon Solar
Cell Modules IEC 61215/IS14286. In
addition, the modules must conform to
IEC 61730 Part-2-requirements for
construction & Part 2 – requirements
for Testing and JSS55555 for dust test
and rain test., for safety qualification or
equivalent IS. With DC combine
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
box/Junction Box and DC Distribution
box & ACDB, automatic sprinkling
system (DC isolator/CB & Lighting
Arrestor) with Automatic sprinkling
system or as per design approved by
Engineer In Charge. Supply, Installation,
Testing & Commissioning of following
size of Grid Tied Solar Power Plant with
Solar Panels (ALMM approved and
Latest Government guidline approved ):
Frame Material : Anodized Aluminium
alloy Frame With Twin Wall Profile,
Front Cover : High Transmission Low-
Iron Tempered Glass (AR Coated), High
efficiency and positive power tolerance
Pmax: 0/+5, Module Efficiency should
be approx. 18%-21%, Normal
operating temperature 45'C, Junction
Box with Waterproof IP67 & MC4
Compatible and Enclosed with Bypass
diodes, 100% Electroluminescence test
to ensure error free Modules, Thep.
temp. Co-efficient of the PV module shall
equal or better than -0.45%/degree C.
Solar PV modules of minimum fill factor
75% to be used. Unit Production:- 5 to
Unit /kw /day (Actual)(1Year Avg) With
10 year Product warranty and 25 year
Linear Power Warranty., Solar Inverter:
MPPT Range: 80-1000 V, Max efficiency:
97.5% - 98.9%, O/p Frequency:
50/60Hz, Operating Altitude (m) ≤5000,
O/p Power Factor: ~1, O/P THDi: <3%,
Operating Temperature Range: -
25~60°C, Anti-islanding Protection:
Integrated, Input Reverse Polarity
Protection Integrated, Insulation
Resistor Detection Integrated, Residual
Current Monitoring Unit Integrated,
Output Over Current Protection
Integrated, Output Short Circuit
Protection Integrated, Output Over
Voltage Protection Integrated,
Protection Degree: IP65, User Interface
LCD & APP, Data logger &
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
Communication: GPRS / Wi-Fi, Module
Mounting Structure: Seamless Box Pipe
/ 'C' Channel of suitable size for solar
installations with good stability against
wind & weight load., Hot Dipped
Galvanized steel coils. suitable
arrangement for base plate for
foundation , solar panel mounting, the
structure should be suitable for carry
the load of solar panel, wiring, sprinkler
system etc. with necessary foundation
work/wall mount, j bolt, anchor fastener
etc. the nut bolt used for installation of
structure should be (SS 304) quality.
and Balance of System with necessary
Switchgears (Suitable size and
protection of ACDB & DCDB), inter
connecting wiring, earthing system,
lightning arrester system, all liasoning
work with various gov. department like
state nodal agency, DISCOM & CEIG is
included in agency scope. The solar
module shall have a front cover of high
transmission (Greater than 91%)
tempered and textured glass not less
than 4 mm thick with anodized
aluminium alloy frame material to
protect the silicon cells damages. The fill
factor of module shall not be less than
0.70. Modules alignment & tilt angle
shall be calculated to provide the
maximum annual energy output the
typical open circuit voltage of module
shall be 37.8 V DC & short circuit
current should not less than 8.28 Amp.
The module shall have high voltage
withstand insulation level (URMS) 3KV
DC for 1 Min. SCADA or Remote
monitoring with data logger or as per
design approved by Engineer In Charge.
The DCDB (weather resistant) and UV,
IR protected, fabricated of 2 mm thick
CRCA sheet for out door application
suitable for SPV panel complete with all
accessories, IP 65 String Combiner Box,
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
Fuse rating as per requirement of
protection or 16 Amps, with DC SPD
etc.as reqd. as IEC 62208 or relevant BIS
& made of FRP/ABS/Thermo plastic.
The terminals shall be connected to
DCDB arrangement of reqd. size & DCDB
shall be fitted with cable glands as per
reqd. cable size for both incoming &
outgoing cable. For Combine the DC
Cables of the solar module array with
DC Fuse/MCCB protection for the
outgoing DC Cable to the distribution
box. The item included DC Combine &
Distribution box Suitable for Generation
of mentioned below Kwp Solar Power
plants. Solar PV modules consisting of
required number of Mono PERC
Crystalline PV Modules. Solar Module
should have auto cleaning system with
water sprinkler. Suitable to below
mentioned kW (Nos.) system. The
work/arrangement is carried out as per
instruction given by Engineer in charge
as per site condition.(for each kw panel
2. STRUCTURE: (i) The structures
should be of flat plate design with
combination of I, C, L sections as per
structure, using minimum size of C (75 x
(60x 40x 4mm) sections or higher
dimensions for respective sections
requirement to withstand average wind
speed at site location suitable fastening
arrangement such as grouting and
clamping shall be provided to secure the
installation against the specified wind
speed upto 180 KM/Hr. size of structure
may change as per technical
requirement for Solar panels. Structure
weight of Each approx. 22.92 Kg or as
per requirement directed by Engineer in
charge. As per design approved the final
size will be use by bidder. (ii) Structural
material shall be corrosion resistant and
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
electrolytic ally compatible with the
materials used in the module frame its
fasteners, nuts and bolt it will be hot
dipped galvanizing or equivalent which
provided at least spraying thickness of
80/120 Microns on both sides as per
IS4736 if mild steel is used. (iii) The
fasteners used shall be made up of
stainless steel.(iv) The structures should
be designed to allow easy replacement
of any module.(v)Each structures should
have angle of inclination as per the site
conditions to take maximum ionisation.
(vi) Job for civil work:- Providing
cement concrete for foundation
structure on water floating or ground or
on roof 1:2:4 with 22 to 25 mm stone
metals dully plastered with necessary
curing ,drilling wall of 16 mm dia and
300 mm deep in RCC beam with
compressor and placing of 12 mm dia
tor steel bars and grouting the hole in
existing system of standard make. The
job included cost of conveyance of all
materials and labour including all taxes
complete with finishing work. The job
included cleaning the surface of on
water floating/terrace. providing and
anchoring in position 20 mm dia
mm long high strength anchor bolt and
welding (with bolt ) in bottom including
drilling anchoring and grouting with
chemical, necessary equipment
including all taxes. This structure if
required to fix module with floaters or
not required but for the same the
approval of GIDC must be required.
3.DC Cable (i) Supplying & fixing of
XLPO/XLPE/XL-LSOH Insulation
DC tinned copper conductor cables
(Solar DC cable) & double insulated
copper conductor cables suitable sizes
to connect the AJB to invertor i/c
connection & testing, commissioning
etc. as required. DC Positive: Red(The
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
outer PVC sheath can be black with a red
line marking).DC negative: Black. The
termination of the DC Cables at the solar
grid inverter shall be done as per
instruction of the Engineer in charge.-
Double insulated flexible, UV protected,
long lifted, tinned cupper DC cable
capable to carry the string current.- size:
single core 2/4/6 SQ mm or Current
carrying capacity is more than 16 Amps.
(ii)Supplying & fixing of
XLPO/XLPE/XL-LSOH Insulation
DC tinned copper conductor cables
(Solar DC cable) & double insulated
copper conductor cables suitable sizes
to connect the AJB to invertor i/c
connection & testing, commissioning
etc. as required. DC Positive: Red (The
outer PVC sheath can be black with a red
line marking).DC negative: Black. The
termination of the DC Cables at the solar
grid inverter shall be done as per
instruction of the Engineer in charge.-
Double insulated flexible, UV protected,
long lifted, tinned cupper DC cable
capable to carry the string current. size:
single core 2/4/6/10 SQ mm or Current
carrying capacity is more than 25 Amps
4. Providing and Fixing heavy duty
flange type brass/PVC cable gland with
rubber ring for PVC insulated armoured
cable complete with out going tails,
insulating tape etc for following size of
cables. Suitable to 2 Core x 6 & 10 Sq
mm Cable or the MC4 connector with
4 IP65 protection having PVC insulated
and cupper connectors without tails and
insulating tapes, etc . Suitable to 1 Core x
4,6 & 10 Sq mm Cable or size of 16 amp
and 25 amp DC double insulated cables
or as per design requirement of PV
module as approved by Engineer in
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
5. Dc cable lugs Suitable to Item No.4 I &
6. Solar Grid Inverter :Design,
Engineering, Procurement, Supply,
Installation, Testing and Commissioning
The power string inverter of suitable
capacity shall be provided to convert DC
power produced by solar module, into
AC power. The inverter should be grid
interactive and also DG set interactive if
necessary, inverter output should be
compatible with the grid frequency.
Having Design KVA Capacity or as per
design approved by Engineer In Charge.
The inverter shall compile applicable
IEC/equivalent BIS standard for
efficiency measurements and
environmental tests as per standard
codes IEC 61683 and IEC
61000-6-4, IEC 60529 and upto date
amendments. The MPPT units should be
qualify IEC 60068-2-78 and IEC
EMI and EMC Requirements: PCU shall
comply the following EMI and EMC
requirements:i. Emitted interference as
per IEC: 61000-6-4.ii. Interference
emitted as per IEC: 61000-6-2. Inverters
including MPPT and below Protections
shall be certify by the MNRE or NABL
approved laboratory. Efficiency
Measurements as per IEC 61683 / IS
61683 and Environmental Testing as
Report/Certificate for the following
protection from NABL approved
laboratory 1. Our current protection and
over voltage(minimum +/-15%) on
output side2. Grid frequency variation
limit and protection 3. Over
temperature test 4. Noise level test5.
Idling current test 6. Reverse polarity
protection 7. Array ground fault
protection 8. Anti-islanding test9. Short
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
circuit protection on AC side10.
Efficiency test The AC power output of
the inverter shall be fed to the AC
distribution board (metering panel &
isolation panel), which also houses the
energy meter. The AC output of grid-
connect SPV system should be
paralleled with GIDC’s general electric
power supply 1. The system shall
automatically wake-up in the morning
and supply power, provided there is
sufficient solar energy and the grid
voltage and frequency are in range.2.
When the grid voltage and/or frequency
goes out of pre-set range, the inverter
shall be immediately disconnected from
the grid. The inverter will reconnect
after a pre-determined time when the
grid is back in the range.3. Array to
inverter voltage drop shall be less than
3% at the maximum power output of the
array.4. Adequate space and ventilation
shall be provided for the inverter.5. For
safety reasons, PV inverter system shall
be disconnected from the network
following a fault or loss of supply on the
power network.6 The performance and
generation data shall be recorded using
a data logger. The monitoring system
shall comprise of the following main
components.7. PCU will log the inverter
performance data and transmit the
same to the data logger. It shall also
monitor basic parameters like power
generated, etc.8. Data logger shall gather
information and monitor the
performance of the inverter. 9. Data
logging system/ software shall enable
automatic long-term storage of
measured data from PV plant. It shall
allow visualization, monitoring,
commissioning and service of the
installation. The data logger shall be
web enabled. It should be possible to
access the data logger with any standard
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
web browser like internet explorer,
Google chrome, etc. and for this
purpose, relevant software and
hardware will be supplied by the
contractor. In addition to the web portal,
it should also be possible to retrieve the
data directly from the data logger. The
software for access/ visualization of
data from data logger should be
provided by the supplier free of cost.
Necessary executable files, if any, will be
required to be given free of cost by the
supplier on a CD/ any other storage
device. Monitoring system should be
able to access from Mobile and from any
web enable device. Monitoring system
should have below details: (Need to
produce the screen shot with below all
points covered)1. Energy generation on
daily, monthly, yearly basis.2. How
much total carbon saving by this plant
generation as on date3. Total trees
planted compare to the solar power
generation4. Minute wise energy
generation5. Automatic fault alert in two
email ids.6. Subscription for 25 years7.
Real time data facility to check live plant
performance 8. Daily energy generation
on graphical form with a minutes data9.
Display of environmental conditions of
previous day, current day and upcoming
next day10. Report generation facility
11. Two log in facility 1. Password
protected and 2. Universal access with
limited data Design:
Appropriate/optimized inverter
wattage /power should be chosen with
Following points mind: • To meet the
total power requirement based on the
reservoir available area and also area
required for maintenance. • Minimum
Power rating: 20 kW to 25 kW per
inverter or as per design approved by
Engineer In Charge.• Inverter should be
natural cooled technology. No force or
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
fan cooled is allowed.• To get total
remote monitoring for the performance
of the plant and if any alarm has to be
auto informed by the email, minimum
two emails have to be configure.. •
Maximum decentralization should be
achieved, so that at any given time
minimum no of strings are down. • To
deliver maximum power for long
duration mentioned in tender document
without degradation as per IEC
applicable code. • Signature of
Contractor with Engineer in charge
GIDC, A'bad• Approval should be
obtained from GIDC before procurement
backed by detailed technical design
calculation documents should be
submitted to meet the tender document
requirements. • Optimized wattage
should be mentioned in the technical bid
along with technical design documents
to meet the tender document
requirements. • The inverter shall be
capable of complete automatic
operation including wake-up, to monitor
plant performance. • The inverters
should comply with applicable IEC /
equivalent BIS standard for • Efficiency
measurements and environmental tests
as per standard IEC code. • The
inverters should be tested from the
MNRE approved test centres / NABL /
BIS • Accredited testing – calibration
7. AC Distribution Box & AC combine
box: Design, Engineering, Procurement,
Supply, Installation, Testing and
Commissioning of factory assembled
wall/floor mounted indoor distribution
7 board dust & vermin proof powder
coated self supported suitable for
phase 4 wire, 50 Hz 440 volt AC supply
and having front area not less than
Sqmtr. and 400 mm deep and having
400 mm X 400 mm space for CT
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
operated Energy Metre nominal size
fabricated out of 1.6 mm thick MS sheet
with locking arrangement i/c supplying
& fixing following accessories as below,
i/c bus bars inter connection,
arrangement for cable entry / support /
termination 2 Nos. earthing stud inter
connection with 20 mm x 5 mm copper
strip (externally) painting etc. as
required. Suitable to Design KW. (a)
Approved make Four pole moulded case
circuit breaker having breaking capacity
ICU of 50 K.A. or equivalent as per
design at 415 V having normal current
rating up to 400A or equivalent as per
design of OEM approved by Engineer In
Charge. with variable thermal &
magnetic release suitable to work on
A.C. supply 50 c/s. with all internal
connections & complete erected in
existing 16 G.M.S. housing Suitable for
630 Amp. or equivalent as per design of
OEM approved by Engineer In Charge
capacity ICS=100% of ICU only Cat III
Design AMP. 50 KA FP MCCB
Microprocessor base Release
(Ics=Icu=100%) or equivalent as per
design of OEM approved by Engineer In
Charge = 1 No. (Outgoing),Cat III (b)
Supplying and erecting triple pole &
neutral 440V / 500V panel mounting
Copper Bus bars with four equal Nos. of
electrolyte bus having current density
not more than 1.6 Amp. / sq.mm (Rated
current / cross section area) duly
wrapped with colour insulating tape for
phase sequence of following current
carrying capacity, erected with
necessary bus bar supports /insulators,
main cable socket to each bar, erected in
existing cubical panel with necessary
connections. Design Amp Amp. Or or
equivalent as per design of OEM
approved by Engineer In Charge
Capacity 4 strip Copper bus bar = 1 Set
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
(c) Approved make Four pole moulded
case circuit breaker having breaking
capacity ICU of 35 KA. at 415 V. having
Normal current rating up to 200A or
equivalent as per design of OEM
approved by Engineer In Charge. with
variable Thermal & magnetic release
suitable to work on A.C. supply 50 c/s.
with all internal connections & complete
erected in existing 16 G.M.S. housing
Approved make Four pole moulded case
circuit breaker having breaking capacity
ICU of 35 KA. at 415 V. having Normal
current rating up to 200 A or equivalent
as per design of OEM approved by
Engineer In Charge. with variable
Thermal & magnetic release suitable to
work on A.C. supply 50 c/s. with all
internal connections & complete erected
in existing 16 G.M.S. housing 200 Amp.
35 KA FP MCCB Thermal Magnetic
Release (Ics=Icu=100%) or equivalent
as per design of OEM approved by
Engineer In Charge = 4 Nos.
(Incomer),Cat III (d) LED Multifunction
Meter(V, A, F, PF, kW, kVA, kVAR, kWh,
kVAh, kVARh, Run hours, On hours,
Interrupts, RPM, % Unbalance (V,A),
Phase angle, THD, Neutral current, %
Load, Maximum Demand (kW & kVA),
MD reset, Bi-directional (Import-
Export)) Class Accuracy 0.5 complete
with accessories = 5 Set
8. AC Cable :Design, Engineering,
Procurement, Supply, Installation,
Testing and Commissioning of one
number XLPE Insulated & PVC sheathed
Aluminium Conductor power armoured
cable of 1.1 KV grade of following size,
conforming to IS 7098 (Part-1)
with up to date amendment direct in
ground including excavation, sand
cushioning protective covering &
refilling the trench etc as required.
having size of 3.5 X 25/ 35/50/100
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
Sq.mm. or equivalent as per design of
OEM approved by Engineer In
Charge.3.5 X As per Desing Sqmm
9. Providing & fixing heavy duty flange
type cable gland with rubber ring
suitable for XLPE insulated armoured
cable complete with out going tails,
9 insulating taps etc having size of 3.5 X
25/35/50/100 Sq.mm. or equivalent as
per design of OEM approved by
Engineer In Charge. 3.5 X As per Desing
10. Providing & fixing Solderless
crimping type Aluminium lugs
conforming to IS suitable for cable of
following size having eventually
crimped to switchgear terminals with
10 brass/cadmium plated nut bolts in an
approved manner. Having size of 31/2
core x 25/35/50/100 Sq mm or
equivalent as per design of OEM
approved by Engineer In Charge 31/2
core x As per Desing Sqmm .
11. Earthing : (i) Design, Engineering,
Procurement, Supply, Installation,
Testing and Commissioning of earth pit
of minimum bore dia. 225mm size of
approved make Safe Earthing Electrode
consisting Pipe-in-Pipe Technology as
per IS 3043-1987 made of corrosion
free G.I. Pipes having Outer pipe dia of
80 mm having 80-200 Micron
galvanising, Inner pipe dia of 40 mm
having 200-250 Micron galvanising,
connection terminal dia of 14 mm with
constant ohmic value surrounded by
highly conductive compound with high
charge dissipation suitable for For
Electrical Installation covering
Transformer Neutrals, Lightning
arrester Earthing, A.C. Plant & Sensitive
Computer System(like Automation,
SCADA)i.e. independent Earthing
located in other than normal soil i.e. Soft
Rock, Marshy Soil etc..
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
-Length of Pipe : 3 Mtrs.
-Back filling Compound :2 nos Bags of
25 Kg. or As per requirement directed
by Engineer-in charge. (ii) Providing
and fixing of lightning conductor finial,
made of 25 mm dia 300 mm long, G.I.
tube, having single prong at top, with
mm dia 6 mm thick G.I. base plate
including holes etc. complete as
required. (iii) Providing and fixing G.I.
tape 20 mm X 3 mm thick on parapet or
on surface of wall for lightning
conductor complete as required.(For
horizontal run) (iv) Providing and fixing
G.I. tape 20 mm X 3 mm thick on parapet
or on surface of wall for lightning
conductor complete as required. (For
vertical run) Jointing copper / G.I. tape
(with another copper/ G I tape, base of
the finial or any other metallic object)
by riveting / nut bolting/sweating and
soldering etc. as required. Providing and
fixing testing joint, made of 20 mm X
mm thick G.I. strip, 125 mm long, with
Nos. of G.I. bolts, nuts, chuck nuts and
spring washers etc. complete as
required. Providing and laying G.I. tape
32 mm X 6 mm from earth electrode
directly in ground as required.
12. Power Surge Protection for AC &
DC : Design, Engineering, Procurement,
Supply, Installation, Testing and
Commissioning of Surge Protection shall
be provided on the DC & AC both are
side of the Solar System. The DC Surge
protection devices (SPDs) shall be
12 installed in the DC DB & AC DB
individual adjacent to the solar grid
inverter. If DC SPD and DC isolation
switch is inbuilt with inverter than only
ACDB needs to provide. and also as per
UGVCL requirement necessary
arrangement other than mentioned in
tender to start plant need to carry out
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
13. Lightning Arrestor (Lightning
13 surge protection)
14 14. Danger notice board
15. Design, Engineering, Procurement,
15 Supply, Installation, Testing and
Commissioning of Multi function meter
16. Design, Engineering, Procurement,
Supply, Installation, Testing and
Commissioning of Energy meter for
measurement of solar generation(Bi-
Directional) UGVCL APPROVED MAKE
17. SUPERVISORY CONTROL DATA
ACQUISITION SYSTEM/ PLANT
MONITORING:- Design, Engineering,
Procurement, Supply, Installation,
Testing and Commissioning of Remote
Monitoring SCADA /monitoring System,
Data Logging on line / off line PV
monitoring of total As per Design KW
solar power generation plant in various
building in same campus having
different capacity of solar power
generation system. i. Data Acquisition
System shall be provided for each of the
solar PV plant. ii. Remote Monitoring
and data acquisition through Remote
Monitoring System software at the
owner /GEDA/MNRE location with
latest software/hardware configuration
and service connectivity for online / real
time data monitoring/control complete
to be supplied and operation and
maintenance/control to be ensured by
the CP. Provision for interfacing these
data on GEDA/MNRE server and portal
in future shall be kept. Monitoring
system should have below details:
(Need to produce the screen shot with
below all points covered) 1. Energy
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
generation on daily, monthly, yearly
basis.2. How much total carbon saving
by this plant generation as on date3.
Total trees planted compare to the solar
power generation4. Minute wise energy
generation5. Automatic fault alert in two
email ids.6. Subscription for 25 years7.
Real time data facility to check live plant
performance 8. Daily energy generation
on graphical form with a minutes data9.
Display of environmental conditions of
previous day, current day and upcoming
next day10. Report generation facility
11. Two log in facility 1. Password
protected and 2. Universal access with
limited data Communication
interfaceThe system should offer
RS232/RS485 port and LAN/ WAN
interface to facilitate remote monitoring
of the system. GIDC will provide WIFI
network/ GPRS enable sim card to make
this data remote monitoring. This has
reference to the specifications of the
450kW Solar Plant ,we suggest to add
Remote Monitoring Device /system as
recommended by MNRE requirement as
follows. 1.Monitoring System 2. Web
based Remote monitoring and mobile
application 3. Weather station for plant
performance evaluation Monitoring
system with Weather Station: • To
evaluate performance of the Solar
plantD.C Input and A.C Output Ratio
Running Hours 3. Performance Ratio
(PR) 4. Capacity Utilization Factor (CUF)
• Long term storage of following
Parameter with Report Generation
Generation (Import /Export)
Irradiation and Temperature 3. Invertor
health and Fault Monitoring & Report
Predictive Maintenance 1. For Cleaning
Schedule of Solar Panels 2. Invertor
Maintenance Monitoring System (DAQ):
a. The monitoring device is expected to
have provision to interface with PCU,
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
energy meters and weather monitoring
devices for providing web based remote
monitoring of all the plant installed at
location. b. Minimum technical
specifications of the monitoring device
shall include.Calculate the system
capacity based on annual energy
consumption. Formula: Capacity = 50%
of sanction load from the dis-com. xxv.
Example: dis-com approved/sanction
load is 450 KW The solar PV system
capacity will be 5 KW maximum. xxviii.
Recommended Capacity: Take the
lowest of the above two capacity
calculation results. xxix. In this example:
5 kWp or as per requirement approved
by Engineer in charge.xxx. Solar Grid
Inverter Capacity The recommended
solar grid inverter capacity in kW shall
be in a range of 95% - 110% of the solar
PV array capacity. In the above example,
the solar array capacity was calculated
to be 20 kW to 50 kW or as per
approved design. The solar grid inverter
required for this array would be in a
range of as per approved design.
18. Design, Engineering, Procurement,
Supply, Installation, Testing and
Commissioning of Module Floating
Mounting Structure & its accessories for
various KWp(cluster of minimum
KW maximum 50 KW OR as per
approved design) Grid Interactive solar
photo voltaic generation system with
accessories having followings technical
18 specifications. SOLAR PV MODULE with
DC Combine Box & DC Distribution Box
and having and on facility solar cleaning
system (water Sprinkler) (450 kW) and
additional Work Cost: General work
including Construction, erection, testing,
commissioning COD with GEDA/Gujarat
State Designated Agency/DISCOM etc. of
entire plant as per details specified in
the Tender documents, on EPC Basis.
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Item Description Unit Quantity Total Grand Total
Item Description Unit Quantity Total Grand Total
Maintenance of 450 KW Solar Power
Generation System. The Buoyancy
report must be required before
execution of work during design stage &
Supporting documents to be submitted,
Stability & Mooring: They are linked
together in arrays and secured using
specialized mooring and anchoring lines
attached to the lake or reservoir bed,
allowing the system to shift safely with
changing water levels or waves
Design, Engineering, Procurement,
Supply, Installation, Testing and
Commissioning of various KWp(cluster
of minimum 25 KW maximum 50 KW
OR as per approved design) Grid
Interactive solar photo voltaic
generation system with accessories
1 to having followings technical
18 specifications. SOLAR PV MODULE with
DC Combine Box & DC Distribution Box
and having and on facility solar plant
cleaning system (water Sprinkler) (450
kW) From item no. 1 to 18 as per
requirement mentioned in tender
technical specification, data sheet and as
per approved design by GIDC.
(*) IF TENDER IS BELOW IF TENDER IS ABOVE
Estimated cost put to tender: Rs. 4,41,04,180.00 Estimated cost put to tender:
Deduct________% below :: Rs.___________ Add_______ % above :: Rs.__________
Net amount of tender :: Rs.___________ Net amount of tender :: Rs.__________
Signature of Contractor Executive Engineer (M&E)
GIDC, AHMEDABAD
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Pre-Qualification-Vol-1_24_10_26.pdf
Tech.Bid-GIDC-Vol-3_24_10_26-1.pdf
Price Bid-GIDC-Vol-3_24_10_26.pdf
B1 Agrrement - Part 1.pdf
B1 Agrrement - Part 2.pdf
GR Bank Gurantee.pdf
corrigendum1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .