| 1 | L1₹95.5 LAccepted-AOC 56 57 HADAPSAR INDUSTRIAL ESTATE HADAPSAR PUNE MAHARASHTRA 411013 | PUNE | PUNE | MAHARASHTRA | 411013 | L1 | Accepted-AOC Lowest Bidder |
Tender Value
Refer Docs
EMD Value
₹2.1 L
Closing Date
24 Nov 2023, 11:30 amClosed
Chief Executive Officer
1st Floor, UD Bhawan, Shakuntala Road, Agartala 799001
Design, Supply, Installation, Commissioning of Non-IT Infrastructure, Shifting of ASCL ICCC Data Centre from the IT Bhawan building to the Upper Ground floor of the ASCL, ICCC Control Room Premises, including three yrs including DLP of one yr
2023_CEO_43664_1
ASCL/RFP/2023/59
Open Tender
Composite Works
Works
60 days
Agartala
As per NIeT
7 documents required · 7 mandatory
₹2,500
Yes
₹2.1 L
Agartala
24 Jul 2024
3 Nov 2023
24 Nov 2023
3 Nov 2023
24 Nov 2023
4 Nov 2023
4 Nov 2023 - 7 Nov 2023
8 Nov 2023
Amount
Supply, Installation & Commissioning of Building Management Systems
False Ceiling Smoke Detector
True Ceiling Smoke Detector
False flooring Smoke Detector
Access Control Reader
Remote Terminal Unit (RTU)
Transducer
Rodent Panel
CCTV Dome Cameras
Supply, Installation & Commissioning of Electrical, PAC & Fire Suppression
Industrial Socket 16A
DC Rack PDU with 6/16A socket. Considered 12 sockets
Main Electrical Panel with required MCB'sr
Electrical Distribution Box (24 way)
4 Sqm Copper Wire (Red)
4 Sqm Copper Wire (Yellow)
4 Sqm Copper Wire (Blue)
4 Sqm Copper Wire (Black)
25 Sqm Copper cable from EV Panel to UPS
Chemical GI Earthing (Rack & DB body earthing)
Chemical copper earthing ( Electrical panel & DB)
200 Amp Main incomer MCB
PAC Unit (10 tons) with 3 years of warranty
Battey Bank for 120KVA UPS with stand
Fire Extinguisher
Fire Detection, Control and suppression system (As per DC requirements)
Supply, Installation & Commissioning of Civil Items
Supply, Installation & Maintenance of False Floor Tiles in Data Centre
Air Flow Grill Tiles (Hot & Cool blower)
Dismantling of Partition wall, Painting and other civil works (200 sqft)
System Integrator work
Dismantling, shifting & re-installation of DC equipment’s (Dell)
Dismantling, shifting & re-installation of DC equipment’s (CISCO)
Cable dressing & Tagging work in DC
Operation & Maintenance Works for 03 (Three) Years
FOR FIRST YEAR : Comprehensive Operation and Maintenance works of non-IT Infrastructure at the newly built ICCC Data Centre.
FOR SECOND YEAR : Comprehensive Operation and Maintenance works of non-IT Infrastructure at the newly built ICCC Data Centre.
FOR THIRD YEAR : Comprehensive Operation and Maintenance works of non-IT Infrastructure at the newly built ICCC Data Centre.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_44353.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .