Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.4 L+₹41,250 (8.27%)Admitted-Finance | ₹5.4 L+₹41,250 (8.27%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K J JOSE L2 | SUMESH K M L1 |
|---|---|---|---|---|---|
| 1.00 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 1 | Cum | 1,900 ₹1,900 Lowest | 3,000 ₹3,000 |
| 2.00 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 1 | Sqm | 500 ₹500 Lowest | 2,000 ₹2,000 |
| 3.00Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level. | |||||
| 3.01 | 1:1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 8 | Cum | 14,000 ₹1,12,000 | 12,800 ₹1,02,400 Lowest |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form for: (1) Lintels, beams, plinth beams, girders, bressumers and cantilevers | 35 | Sqm | 450 ₹15,750 Lowest | 750 ₹26,250 |
| 4.01 | Columns, pillars, piers, abutments, posts and struts | 4 | Sqm | 450 ₹1,800 Lowest | 750 ₹3,000 |
| 5.00 | Reinforcement for RCC works including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars | 1,050 | Kg | 100 ₹1,05,000 Lowest | 140 ₹1,47,000 |
| 6.00 | Finishing walls with water proofing cement paint of required shade :- New work ( 2 or more coats applied @ 3.84 Kg/Sq.M) | 35 | Sqm | 350 ₹12,250 | 280 ₹9,800 Lowest |
| 7.00 | Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand). | 35 | Sqm | 400 ₹14,000 Lowest | 400 ₹14,000 Lowest |
| 8.00 | Erection of Three / Four Legged Light Weight RTT Communication Tower . | 3.5 | MT | 15,000 ₹52,500 | 14,000 ₹49,000 Lowest |
Tender Value
₹5.3 L
EMD Value
₹10,569
Closing Date
14 Aug 2026, 6:00 pmClosed
Executive Engineer
BSNL Civil Division, BSNL Centre , Post office road, Thrissur-1
Erection of RTT including construction of RCC base erection painting at Talikulam Vikas Trust building Thrissur
2026_BSNL_286602_1
12/EE/BSNL/TCR/2026-27
Open Tender
Civil Works
Works
60 days
Talikkulam
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
AO BSNL Thrissur
₹10,569
3 Sept 2026
5 Aug 2026
18 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
5 Aug 2026 - 14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 1 | Cum | 100 | ₹100 |
| 2 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 1 | Sqm | 100 | ₹100 |
| 3Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level. | |||||
| 3.01 | 1:1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 8 | Cum | 10 | ₹80 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: (1) Lintels, beams, plinth beams, girders, bressumers and cantilevers | 35 | Sqm | 10 | ₹350 |
| 4.01 | Columns, pillars, piers, abutments, posts and struts | 4 | Sqm | 10 | ₹40 |
| 5 | Reinforcement for RCC works including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars | 1,050 | Kg | 10 | ₹10,500 |
| 6 | Finishing walls with water proofing cement paint of required shade :- New work ( 2 or more coats applied @ 3.84 Kg/Sq.M) | 35 | Sqm | 10 | ₹350 |
| 7 | Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand). | 35 | Sqm | 10 | ₹350 |
| 8 | Erection of Three / Four Legged Light Weight RTT Communication Tower . | 3.5 | MT | 10 | ₹35 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_334444.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .