Loading…
Loading…
Tender Value
₹16.3 L
EMD Value
₹32,600
Closing Date
4 May 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
ELECT
20 conditions · 9 needing a document upload
Tenderers have to submit PAN and GST Registration.
Financial Standing: The Bidders will be qualified only if they have minimum financial capabilities as below :-
1- Financial Turnover : The bidder should have an aggregate financial turnover not less than 1.5 times the advertised Bid value during the last three previous financial years and in the current financial year upto the date of opening of the tender. The audited balance sheet reflecting financial turnover certified by chartered accountant with her stamp, signature and membership number shall be considered.
2- Liquidity: The bidder should have access to or has available liquid assets, lines of credit and other financial means to meet cash flow that is valued at 5% of the estimated bid value net of applicant's commitments for other contracts. The audited balance sheet and/or banking reference certified by chartered accountant with her stamp, signature and membership number shall be submitted by the bidder along with bid. Banking reference should contain in clear terms the amount that bank will be in a position to lend for this work to the applicant/member of the Joint Venture/Consortium. In case the Net Current Assets (as seen from the Balance Sheets) are negative, only the Banking references will be considered. Otherwise the aggregate of the Net Current Assets and submitted Banking references will be considered for working out the Liquidity. The banking reference should be from a Scheduled Bank in India and it should not be more than 3 months old as on date of submission of bids.
Contractors have to submit a valid Electrical Contractor's License issued by the Government.
Tenderer should have to submit bid form First Sheet as per GCC'/Service 2018
Annexure-V/A to be submitted by each members of partnership Firm as per GCC'2022.
Work Experience: The bidder should have satisfactorily completed* in the last three previous financial years and the current financial year upto the date of opening of the tender, one similar single service contract** for a minimum of 35% of advertised value of the bid. *Completed service contract includes on-going service contract subject to payment of bills amounting to at least 35% of the advertised value of the bid. ** Similar service contract means "Definition of Similar Work :- The tenderer should have experience in "Supply,installation,testing & commissioning of passenger elevators/Liftsl"." Work experience certificate from private individual shall not be accepted. Certificate from public listed company/private company/Trusts having annual turnover of Rs 500 Crore and above subject to the same being issued from their Head office by a person of the company duly enclosing his authorisation by the Management for issuing such credentials. Notes : The bidder shall submit details of work executed by them along with bid for the service contracts to be considered for qualification of work experience criteria clearly indicating the nature/scope of contract, actual completion cost and actual date of completion for such contract.
Similar Nature of Work:Supply,installation,testing & commissioning of passenger elevators/Liftsl"
28 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
(i)The Tenderer is hereby advised to study the tender document in www.ireps.gov.in portal carefully and may also ascertain the nature quantum of work and working condition before submission of his offer. (ii) The submission of the tender will be deemed to imply that this memorandum and all documents enclosed have been studied and understood and that the Tenderer is aware of the full scope of the work to be done.
Earnest Money: (a)The bid must be accompanied by a sum of Rs. 32600.00 as earnest money deposited in cash or in any of the forms as specified, failing which the bid will not be considered. However, registered MSEs in terms of Ministry of MSMEs notification No, 503 are exempted from Earnest Money Deposit. The bidder(s) shall keep the offer open for a minimum period of 60 days from the date of opening of the bid. It is understood that the bid documents have been sold/issued to the bidder(s) and the bidder(s), is / are permitted to bid in consideration of the stipulation on her / their part that after submitting her / their bid subject to the period being extended further, if required by mutual agreement from time to time, she will not resile from her offer or modify the terms and conditions thereof in a manner not acceptable to the Chief Manager/Manager. Should the bidder fail to observe or comply with the foregoing stipulation, the amount deposited as Earnest Money for the due performance of the above stipulation, shall be forfeited to the Railway. (b)If the bid is accepted, the amount of Earnest Money will be returned to the successful bidder after the submission of the Performance Guarantees as per clause 4.11, for the due and faithful fulfillment of the contract. This amount of EMD shall be forfeited, if the Bidder(s)/ Contractor(s) fail to execute the Contract Document within 7 days after receipt of notice issued by Railway that such documents are ready or to commence the work within 15 days (unless otherwise specified) after receipt of the order to that effect. (c)Earnest Money of the unsuccessful Bidder(s) will, save as here-in-before provided, be returned to the unsuccessful Bidder(s) within 15 days after finalization of the bid / negotiation, but the Railway shall not be responsible for any loss or depreciation that may happen to the Security for the due performance of the stipulation to keep the offer open for the period specified in the bid documents or to the Earnest Money while in their possession nor be liable to pay interest thereon.
Rights of the Railway to Deal with Tender: The authority for the acceptanceof the tender will rest with the Railway. It shall not be obligatory on the said authority to accept the lowest tender or any other tender and no bidder(s) shall demand any explanation for the cause of rejection of her/their tender nor 1he Railway to assign reasons for declining to consider or reject any particular tender or tenders. 8.If the bidder(s) deliberately gives / give wrong information in her / their tender or creates / create circumstances for the acceptance of her / their tender, the Railway reserves the right to reject such tender at any stage. 9.If the bidder(s) expire(s) after the submission of her / their tender or af1er the acceptance of her / their tender, the Railway shall deem such tender cancelled. If a partner of a firm expires after the submission of their tender or after the acceptance of their tender, the Railway shall deem such tender as cancelled, unless the firm retains its character.
Employment/Partnership etc. of Retired Railway Employees: (a)Should a bidder be a retired Manager of the Gazetted rank or any other Gazetted officer working before her retirement, whether in the executive or administrative capacity or whether holding a pensionable post or not, in any department of any of the railways owned and administered by the President of India for the time being, or should a bidder being a partnership firm have as one of its partners a retired Manager or retired Gazetted Officer as aforesaid, or should a bidder being an incorporated company have any such retired Manager or retired officer as one of its Directors or should a bidder have in her employment any retired Manager or retired Gazetted Officer as aforesaid, the full information as to the date of retirement of such Manager or Gazetted Officer from the said service and in case where such Manager or Officer had not retired from Government service at least 2 years prior to the date of submission of the tender as to whether permission for taking such contract, or if the contractor be a partnership firm or an incorporated company, to become a partner or Director as the case may be, or to take the employment under the contractor, has been obtained by the bidder or the Manager or Officer, as the case may be from the President of India or any officer, duly authorised by her in this behalf, shall be clearly stated in writing at the time of submitting the bid. Bids without the information above referred to or a statement to the effect that no such retired Manager or retired Gazetted Officer is so associated with the bidder, as the case may be, shall be rejected. (a)Should a bidder or contractor being an individual on the list of approved Contractors, have a relative(s) or in the case of partnership firm or company of contractors one or more of her shareholder(s) or a relative(s) of the shareholder(s) employed in gazette capacity in the any department of the Railway, the authority inviting tenders shall be informed of the fact at the time of submission of tender, failing which the tender may be disqualified/rejected or if such fact subsequently comes to light, the contract may be rescinded in accordance with provision in Clause 7.4 of Standard General Conditions of Contract.
Performance Guarantee 4.10.1 Performance guarantee at a rate of 5% of the contractual value shall be deposited by the successful bidder. The successful bidder shall have to submit a Performance Guarantee (PG) valuing 5% of the contract value in four separate parts of 1.25 % each of the contract value, within 30 (thirty) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 30 (thirty) days and upto the date of submission of PG from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 15% per annum shall be charged for the delay beyond 30 (thirty days, i.e. from 31st day after the date of issue of LOA. In case the contractor fails to submit the requisite PG after 60 days from the date of issue of LOA, a notice shall be served to the contractor to deposit the PG immediately however not exceeding 90 days from the date of issue of LOA). In case the contractor fails to submit the requisite PG even after 90 days from the date of issue of LOA, the contract shall be terminated duly forfeiting EMD and other dues, if any payable against that contract. The failed contractor shall be debarred from participating in re-tender for that work. In case 60th day is a bank holiday or office closure next working day should be considered as the last day for submission of the PGs. Decision of Authority competent to sign the Contract Agreement would be final in case of any dispute. 4.10.2 The value of PG to be submitted by the, contractor will not change for variation upto 25% (either increase or decrease). In case during the course of execution, value of the contract increases by more than 25% of the original contract value, an additional Performance Guarantee amounting to 5% (five percent) for the excess value over the original contract value shall be deposited in four equal parts by the contractor. On the other hand, if the value of Contract decreases by more than 25% of the original contract value, Performance guarantee amounting to 5% of the decrease in the contract value shall be returned to contractor. The PG amount in excess of required PG for decreased contract value, available with railways shall be returned to the contractor duly safeguarding the interest of Railways. 4.10.3 The applicable Performance Guarantee shall be calculated as per the revised value of the contract covering all variations upto the determination of the contract 4.10.4 If the penalty imposed exceeds 50% of the applicable maximum penalty (as per the revised value of the contract), a PG equivalent to 25% of the applicable PG shall be forfeited. If the penalty imposed exceeds 75% of the applicable maximum penalty a PG equivalent to 50% of the applicable PG shall be forfeited. The PGs shall be encashed after the completion of the contract.
4.10.5 The successful bidder shall submit the Performance Guarantees (PG) in any of the following forms, amounting to 5% of the contract value - (l) A deposit of cash; (m) Irrevocable Bank Guarantee; (n) Government Securities including State Loan Bonds at 5% below the market value; (o) Deposit Receipts, Pay Orders, Demand Drafts and Guarantee Bonds. These forms of Performance Guarantee could be either of the State Bank of India or of any of the Nationalized Banks; (p) Guarantee Bonds executed or Deposits Receipts tendered by all Scheduled Banks; (q) A Deposit in the Post Office Saving Bank; (r) A Deposit in the National Savings Certificates; (s) Twelve years National Defence Certificates; (t) Ten years Defence Deposits; (u) National Defence Bonds and (v) Unit Trust Certificates at 5% below market value or at the face value whichever is less. Also, FDR in favour of FA&CAO (free from any encumbrance) may be accepted. Note - The instruments as listed above will also be acceptable for Guarantees in case of Mobilization Advance.
4.10.6 The Performance Guarantees shall be submitted by the successful bidder after the Letter of Acceptance (LOA) has been issued, but before signing of the contract agreement. These PGs shall be initially valid up to the stipulated date of completion and maintenance period, if any plus 60 days beyond that. In case, the time for extended time for completion and maintenance period, if any of service plus 60 days. 4.10.7 The Performance Guarantees (PGs) shall be released after physical completion of the work/ service delivery based on 'Completion Certificate' issued by the competent authority stating that the contractor has completed the assigned services in all respects satisfactorily and passing of final bill based on "No Claims Certificate" from the contractor. In case any contract provides for warranty/ maintenance clause then 25 % of the Performance Guarantee would be retained till the warranty/ maintenance period is over and a certificate to that effect is issued by the Manager. 4.10.8 Whenever the contract is rescinded, the Performance Guarantees shall be encashed / forfeited. The balance work or services for the same shall be got done independently without risk & cost of the failed contractor. The failed contractor shall be debarred for a period of 2 years from the date of such rescindment from participating in the bid which includes delivery of balance services of failed contract. If the failed contractor is a Partnership firm, then every member/ partner of such a firm shall be debarred for a period of 2 years from the date of such rescindment from participating in the bid which includes delivery of balance services of failed contract in his/her individual capacity. 4.10.9 The Manager shall not make a claim under the Performance Guarantee except for amounts to which the President of India is entitled under the contract (not withstanding and/or without prejudice to any other provisions in the contract agreement) in the event of - (a) Failure by the contractor to extend the validity of the Performance Guarantee as described herein above, in which event the Manager may claim the full amount of the Performance Guarantee. (b) Failure by the contractor to pay President of India any amount due, either as agreed by the contractor or determined under any of the Clauses / Conditions of the Agreement, within 30 days of the service of notice to this effect by Manager. (c) The Contract being determined or rescinded under provision of the GCC, the Performance Guarantee shall be forfeited in full and shall be absolutely at the disposal of the President of India.
Rights of the Railway to deal with tender - The authority for the acceptance of the tender will rest with the Railway. It shall not be obligatory on the said authority to accept the lowest tender or any other tender and no tenderer(s) shall demand any explanation for the cause of rejection of his/their tender in the Railway undertake to assign reasons for declining to consider or reject any particular tender or tenders. If the tenderer(s) deliberately gives/give wrong information in his/their tender or creates/create circumstances for the acceptance of his/their tender, the Railway reserves the right to reject such tender at any stage.
5.6.1 The contractor shall be entitled upon the certificate of the Dy.CEE/PS/MLG or his representative authorized on this behalf to an account payments in installments by the Railway as under :- i)Payment shall be made to the contractor on quarterly basis on certification by the Railway Representative (SSE In-charge) for satisfactorily working of lifts and production of maintenance schedule Register/Log book. ii)Final payment including balance 10% payment will be paid on completion of entire work in all respect subject to production of completion certificate duly signed by SSE In-charge authorized by Dy.CEE/PS/MLG, N.F. Railway, Maligaon. iii) All the standard deduction will be deducted from the bill as applicable at the time of payment. iv) Final payment against the works will be released only on production of original purchase documents of all major and minor items used in the works. v) Payment will be done by DFM/GHY. vi) GST as applicable will be levied. vii) Payment as above shall be subject to any deductions of any amount for which the contractor is liable under the contract against this tender including penalty as specified in work evaluation and penalty clause of Special terms and conditions of the contract or any other contract in respect of which the President of India is the contracting authority.
The employees of contractor shall not be entitled for any facility as is being provided to Railway staff. The wages are to be paid as per the wages Act/notification issued by Government from time to time. It is the sole responsibility of contractor to observe and abide by the factory Act, Provision of Labour Act, Workman compensation Act, Provident fund Act, Minimum wages Act, Payment of wages Act, contribution towards EPF. Gratuity Act and other regulations framed by the Govt. and revised from time to time. Contractor shall keep a register for payment of wages once in a month. (e) The contractor is required to open separate PF account for its employee deployed in this work exclusively. The contractor shall be responsible for depositing Provident fund, ESI contribution and other statutory charges payable and shall attach documentary proof of having deposited the same along with the bill of next month. The amount deposited against these liabilities should be deposited on a separate challan only for manpower deployed in this work. Mode of payment through Letter of Credit (LC):- (i) The bidder, at the time of bidding itself, shall exercise an option in writing, in favour of taking payment due against the said tender, through LC arrangement. (ii) The option so exercised, shall be an integral part of the bidders offer. Option once exercised shall be final and no change shall be permitted, thereafter, during the course of execution of contract. (iii) The incidental cost towards issue of LC and operation thereof (LC operating charges, including bank charges for opening of LC) shall be borne by the supplier/contractor. 1.5.5 The Document of Authorization (format enclosed as Ann-1) of LC will be issued by Railway on claims preferred by supplier/contractor, for completed works/supply to enable them to claim the authorized amount from their banker. The Document of Authorization will be issued against each bill submitted for payment by supplier/contractor, after exercising laid down checks as per Railways Codes & Manuals, in executive & accounts branches. The status of claim could be viewed by the contractor in IREPS & IPAS.
GST : i) Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in Clause - 37 of the Standard General Conditions of Contract for the completion of works to the entire satisfaction of the Engineer. ii) Tenderers will examine the various provisions of the Central Goods & Services Tax Act, 2017 (CGST) / Integrated Goods and Services Tax Act' 2017 (IGST) / Union Territory Goods and Services Tax Act, 2017 (UTGST) / respective state's State Goods and Services Act (SGST) also, as notified by Central / State Govt. & as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit ( ITC) likely to be availed by them is duly considered while quoting rates. iii) The successful tenderer who is liable to be registered under CGST / IGST / UTGST / SGST Act shall submit GSTIN along with other details required under CGST / IGST / UTGST / SGST Act to railway immediately after the award of contract, without which no payment shall be released to the contractor. The contractor shall be responsible for deposition of applicable GST to the concerned authority. iv) In case the successful tenderer is not liable to be registered under CGST / IGST / UTGST / SGST Act, the railway shall deduct the applicable GST from his / their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority. (v) GST will be applicable as per prevailing rate. However if Govt imposed any change in GST during the currency of the contract, will be charged at the rate applicable at the time of billing.
Force Majeure Clause: If at any time, during the continuance of this contract, the performance in whole or in part by either party of any obligation under this contract shall be prevented or delayed by reason of any war, hostility, acts of public enemy, civil commotion, sabotage, serious loss or damage by fire, explosions, epidemics, strikes, lockouts or acts of God (hereinafter, referred to events) provided, notice of the happening of any such event is given by either party to the other within 7 days from the date of occurrence thereof, neither party shall by reason of such event, be entitled to terminate this contract nor shall either party have any claim for damages against the other in respect of such nonperformance or delay in performance, and works/ services under the contract shall be resumed as soon as practicable after such event has come to an end or ceased to exist, and the decision of the Manager as to whether the works/ services have been so resumed or not shall be final and conclusive, PROVIDED FURTHER that if the performance in whole or in part of any obligation under this contract is prevented or delayed by reason of any such event for a period exceeding 120 days, either party may at its option terminate the contract by giving notice to the other party.
i) New tax structure is applicable as per GST Act implemented w.e.f 01.07.2017. ii) Rates should be quoted inclusive of Goods & Service Tax(GST).
"The tenderer shall follow GCC for Services (January 2018) and subsequent amendments issued from time to time."
At APDJ Div : Comprehensive Annual Maintenance Contract for 2 nos Lifts at JPE Railway Station for 5 years (OMEGA Make).
AP-EL-21-25-26
AP-EL-21-25-26
Single
Service - General
60 Months
Alipurduar, West Bengal
₹0
₹32,600
4 May 2026
9 Apr 2026
20 Apr 2026
11 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | 2.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
BidFormfirstsheet.pdf
ATTACHMENT
gcc service
ATTACHMENT
GCC srvice
ATTACHMENT
GCC srvice
ATTACHMENT
AP-EL-21-25-26.pdf
ATTACHMENT
ShramikKalyanPortal.pdf
ATTACHMENT
REVISEDGCCFORSERVICES_compressed2-1-35.pdf
ATTACHMENT
REVISEDGCCFORSERVICES_compressed2-36-70.pdf
ATTACHMENT
REVISEDGCCFORSERVICES_compressed2-71-102.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .