Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 LAdmitted-Finance HQ CE SC PUNE | PUNE | MAHARASHTRA | 410301 | ₹14.0 L | L1 | Admitted-Finance |
| 2 | L2₹15.1 L+₹1.2 L (8.27%)Admitted-Finance 30 DIGVIJAY PLOT RAVAL NIVAS JAMNAGAR GUJARAT 361 005 | JAMNAGAR | JAMNAGAR | GUJARAT | 361005 | ₹15.1 L+₹1.2 L (8.27%) | L2 | Admitted-Finance |
| 3 | L3₹15.9 L+₹1.9 L (13.6%)Admitted-Finance PLOT NO 3 DIVINE SCHOOL ROAD NEAR BJP KARYALAY PORBANDAR KHAMBHALIYA HIGHWAY BOKHIRA PORBANDAR 360 579 | PORBANDAR | GUJARAT | 360579 | ₹15.9 L+₹1.9 L (13.6%) | L3 | Admitted-Finance |
| 4 | L4₹16.4 L+₹2.4 L (17.1%)Admitted-Finance JAVERI BUNGALOW AREA KAVERI HOTEL LINE NH PORBANDAR 360 575 | PORBANDAR | GUJARAT | 360575 | ₹16.4 L+₹2.4 L (17.1%) | L4 | Admitted-Finance |
| 5 | L5₹16.5 L+₹2.5 L (18.1%)Admitted-Finance HQ CWE AHMEDABAD | GANDHINAGAR | GUJARAT | 382006 | ₹16.5 L+₹2.5 L (18.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | roxy enterprise L5 | m/s prakash enterprise L3 | K B N TRADERS L1 | Ravi enterprise L2 | OM ENTERPRISE L4 | SANVI ASSOCIATES L7 | J J ENTERPRISES L6 | AADESH CONSTRUCTION L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00Schedule 'A' | |||||||||||
| 1.00 | Taking down chowkhat with shutters (without taking of shutters from the frames of any description not exceeding 1.5 sqm in each panel, Complete all as specified and directed by Engineer-in-Charge. | 7 | Each | 200 ₹1,400 | 405 ₹2,835 | 145 ₹1,015 | 200 ₹1,400 | 350 ₹2,450 | 100 ₹700 | 800 ₹5,600 | 90 ₹630 Lowest |
| 2.00 | Taking down chowkhat with shutters (without taking of shutters from the frames of any description exceeding 1.5 sqm but not exceeding 4.0 sqm in each panel, Complete all as specified and directed by Engineer-in-Charge. | 2 | Each | 300 ₹600 | 570 ₹1,140 | 175 ₹350 | 200 ₹400 | 450 ₹900 | 100 ₹200 | 600 ₹1,200 | 90 ₹180 Lowest |
| 3.00 | Taking down shutters of any description exceeding 1.0 sqm and not exceeding 2.0 sqm each, Complete all as specified and directed by Engineer-in-Charge. | 6 | Each Leaf | 300 ₹1,800 | 730 ₹4,380 | 245 ₹1,470 | 200 ₹1,200 | 100 ₹600 | 95 ₹570 | 200 ₹1,200 | 90 ₹540 Lowest |
| 4.00 | Demolition of Concrete of any description and in any position not otherwise specifically provided for, Complete all as specified and directed by Engineer-in-Charge. | 2 | Cubic Metre | 1,200 ₹2,400 | 1,460 ₹2,920 | 600 ₹1,200 | 350 ₹700 Lowest | 1,750 ₹3,500 | 1,200 ₹2,400 | 800 ₹1,600 | 900 ₹1,800 |
| 5.00 | Demolition of stone slabs and tiles of any description or thickness in floors, aprons Laid, bedded and pointed in any mortar etc., Complete all as specified and directed by Engineer-in-Charge. | 0.8 | Ten Square Metre | 800 ₹640 | 975 ₹780 | 450 ₹360 | 350 ₹280 Lowest | 750 ₹600 | 500 ₹400 | 1,200 ₹960 | 560 ₹448 |
| 6.00 | Dismantling/ Demolition of brick work or stone masonry or built in cement mortar including all quoins, arches, pillars, etc., Complete all as specified and directed by Engineer-in-Charge. | 5 | Cubic Metre | 850 ₹4,250 | 1,300 ₹6,500 | 951 ₹4,755 | 450 ₹2,250 Lowest | 1,750 ₹8,750 | 1,200 ₹6,000 | 600 ₹3,000 | 1,250 ₹6,250 |
| 7.00 | Taking down cement plaster on stone wall including racking out joints, hacking for key scrubbing with water etc., Complete all as specified and directed by Engineer-in-Charge. | 170 | Square Metre | 120 ₹20,400 | 285 ₹48,450 | 59 ₹10,030 | 25 ₹4,250 Lowest | 100 ₹17,000 | 150 ₹25,500 | 120 ₹20,400 | 155 ₹26,350 |
| 8.00 | Dismantling Wall and ceiling boards (fibre, pulp, insulation, etc.) or insulation boards/slabs/ blankets, any thickness, including cover fillets, Complete all as specified and directed by Engineer-in-Charge. | 95 | Square Metre | 80 ₹7,600 | 245 ₹23,275 | 65 ₹6,175 | 20 ₹1,900 Lowest | 70 ₹6,650 | 100 ₹9,500 | 100 ₹9,500 | 100 ₹9,500 |
| 9.00 | Dismantling of Plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings, Complete all as specified and directed by Engineer-in-Charge. | 95 | Square Metre | 50 ₹4,750 | 180 ₹17,100 | 80 ₹7,600 | 30 ₹2,850 Lowest | 150 ₹14,250 | 95 ₹9,025 | 100 ₹9,500 | 100 ₹9,500 |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
25 Aug 2026, 6:00 pmClosed
GE (I) CG PORBANDAR
COAST GUARD, DHQ NO.1, OPP. BIRLA FACTORY, PORBANDAR
REPAIR TO TILING, FLOORING, PLUMBING, JOINERY, LEAKAGE SEEPAGE AND OTHER MISC WORKS AND OTM ACCN AT CGDHQ-01, CG JETTY UNDER GE (I) CG PORBANDAR
2026_MES_780271_1
8215A/E8
Open Tender
Civil Works
Item Rate
270 days
PORBANDAR
AS PER NIT
9 documents required · 9 mandatory
₹500
GE (I) CG PORBANDAR
₹30,000
Yes
2 Sept 2026
24 Jul 2026
28 Aug 2026
24 Jul 2026
25 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Schedule 'A' | - | - | - | - |
| 1 | Taking down chowkhat with shutters (without taking of shutters from the frames of any description not exceeding 1.5 sqm in each panel, Complete all as specified and directed by Engineer-in-Charge. | 7 | Each | - | - |
| 2 | Taking down chowkhat with shutters (without taking of shutters from the frames of any description exceeding 1.5 sqm but not exceeding 4.0 sqm in each panel, Complete all as specified and directed by Engineer-in-Charge. | 2 | Each | - | - |
| 3 | Taking down shutters of any description exceeding 1.0 sqm and not exceeding 2.0 sqm each, Complete all as specified and directed by Engineer-in-Charge. | 6 | Each Leaf | - | - |
| 4 | Demolition of Concrete of any description and in any position not otherwise specifically provided for, Complete all as specified and directed by Engineer-in-Charge. | 2 | Cubic Metre | - | - |
| 5 | Demolition of stone slabs and tiles of any description or thickness in floors, aprons Laid, bedded and pointed in any mortar etc., Complete all as specified and directed by Engineer-in-Charge. | 0.8 | Ten Square Metre | - | - |
| 6 | Dismantling/ Demolition of brick work or stone masonry or built in cement mortar including all quoins, arches, pillars, etc., Complete all as specified and directed by Engineer-in-Charge. | 5 | Cubic Metre | - | - |
| 7 | Taking down cement plaster on stone wall including racking out joints, hacking for key scrubbing with water etc., Complete all as specified and directed by Engineer-in-Charge. | 170 | Square Metre | - | - |
| 8 | Dismantling Wall and ceiling boards (fibre, pulp, insulation, etc.) or insulation boards/slabs/ blankets, any thickness, including cover fillets, Complete all as specified and directed by Engineer-in-Charge. | 95 | Square Metre | - | - |
| 9 | Dismantling of Plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings, Complete all as specified and directed by Engineer-in-Charge. | 95 | Square Metre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
8215AT.pdf
Tender Documents • 4.76 MB
BOQ_874004.xls
BOQ • 0.36 MB
8215ADATE.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .