Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
8 Sept 2026, 2:00 pm
SE/C-II/RB/KMDA
OFFICE OF THE SUPERINTENDING ENGINEER CIRCLE-II, R and B SECTOR, K.M.D.A. UNNAYAN BHAVAN, BLOCK -A, (7TH FLOOR) BIDHAN NAGAR, KOLKATA -700 091
Repair of Road at WARD NO-07 within Gayeshpur Municipaity (List of 03 nos of road are attached in Annexure-I)
2026_KMDA_5018437_3
22/SE/C-II/RB/KMDA/ W-28 (Part-VIII) of 2025-2026 (3rd Call) DATE 11/08/2026
Open Tender
CIVIL WORKS
Percentage
60 days
UNNAYAN BHAWAN
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3.8 L
18 Aug 2026
18 Aug 2026
10 Sept 2026
18 Aug 2026
8 Sept 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specifications Clause 201 for Rural Roads of MORD.
(I) By Manual Means
a) In area of non-thorny jungle | - | Hactare | - | - |
| 2 | Granular Sub-base with Graded Material
(Table:- 400-1) B. By Mix in Place Method :
Construction of granular sub-base by providing graded material, mixing by mix in placemethod with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).For Grading -i | - | cum | - | - |
| 3 | Wet Mix Macadam Base Course: Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting, guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). | - | cum | 1 | - |
| 4 | Supplying and Laying in the specified pattern of Interlocking Concrete Block Pavements (ICBP) with concrete blocks (with graded as specified as per Table 1 of IS 15658:2006) manufactured in steel mould clamped to a vibrating table by hydraulic pressure (as per cl. 6.30 of IRC:SP:63 (2018),from BIS licensee manufacturer,with spacer nib (Small protruding profiles on the vertical face of a paver block used as device for keeping minimum joint gap in between the paving blocks,as per CL. No.3.26 of IS:15658) and of specified size and shape with aspect ratio (The ratio of length to the thickness of a paver block,as per Cl.No.3.3 of IS: 15658) as per Table 2 of IS : 15658 with flectural strength/breaking load as per Annexure G of IS:15658, on the prescribed base course of specified CBR as per Table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with cushion of compacted bedding sand of 25-35 mm thick (grading the bedding sand as per clause 6.5.1 of IRC SP-63) and filling up the gaps in between paver blocks with joint filling sand (the grading of the joint filling sand will be as per clause 6.5.2 of IRC SP-63) and completing the edge with cut blocks as per Cl. No.8.7 of IRC SP-63 (2018) with proper confinement of bedding and joint filling sand, compaction,levelling and filling up of the edge gaps. 80 mm thick. Grey. | - | sqm | - | - |
| 5 | Excavation for Structures Earth work in excavation of foundation of structuresnas per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means.
a) upto 3 m depth
(i) With pumping out water including shoring
as required. | - | cum | - | - |
| 6 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | - | sqm | - | - |
| 7 | Ordinary Cement concrete (mix 1:2:4) with graded stonechips (20 mm nominal size) excluding shuttering andreinforcement if any, in ground floor as per relevant IS codes
(i) Pakur Variety | - | cum | 1 | - |
| 8 | Ordinary Cement concrete (mix 1:1.5:3) with graded stonechips (20 mm nominal size) excluding shuttering andreinforcement if any, in ground floor as per relevant IS codes (i) Pakur Variety | - | cum | 1 | - |
| 9 | Supplying, fitting and placing HYSD bar reinforcement in Sub-structure including initialstraightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size andconforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction
of Engineer-in-charge. II) Tor steel road / HYSD bars/ TMT bars ( TATA/SAIL/RINL)( Fe415/Fe500/Fe500D) conforms to IS -1786) | 0.8 | MT | 1 | ₹0.8 |
| 10 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. | - | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.15 MB
BOQ_5090274.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].