Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC | ₹11.8 L | L1 | Accepted-AOC AOC |
| 2 | L2₹12.3 LRejected-AOC | ₹12.3 L | L2 | Rejected-AOC Rejected |
| 3 | L3₹12.5 LRejected-AOC | ₹12.5 L | L3 | Rejected-AOC Rejected |
| 4 | L4₹12.7 LRejected-AOC | ₹12.7 L | L4 | Rejected-AOC Rejected |
| 5 | L5₹12.8 LRejected-AOC | ₹12.8 L | L5 | Rejected-AOC Rejected |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
13 Jan 2020, 3:00 pmClosed
AGM(TnC)
Panchpatmali Bauxite Mines, NALCO, Damanjodi
Collection of ROM Samples, Field (OB n Bauxite) samples, PP drilling samples and its processing for Panchpatmali South Block Bauxite Mine, NALCO, Damanjodi
2019_NALCO_529567_1
TnC/MINES/GEOL/R-1162
Limited
Miscellaneous Services
450 days
Panchpatmali Bauxite Mines, Nalco
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
Yes
25 Jan 2020
21 Dec 2019
15 Jan 2020
21 Dec 2019
13 Jan 2020
21 Dec 2019
Amount
Processing of PP drilling & Developmental Drilling Bauxite Samples adopting the following sequential steps: a. Drying up of bauxite samples ( By Industrial oven or sun dry). b. Grinding/Sieving/Reduction of the dried bauxite samples to –120 mesh size (three different stages of grinding,sieving &reduction of sample ) as per instruction of the Engineer-in-charge. c. Preparation and packaging of the representative bauxite samples (two nos of 50gm/100gm each)in polythene bags with label tag and storage of the same sample in the designated racks as per the instruction of the Engineer-in-charge.
Provision of One Unskilled workers for Collection of ROM Sample adopting the following sequential steps as per instruction of the Engineer-in-charge :- a. ROM Sample will be collected in B Shift at sampling platform Provided at South Block opposite to the weigh bridge from the running tippers . b. Collection of sample on hourly / half hourly basis or as per the frequency decided by the department. The total collected sample in a shift thoroughly mixed if required. Boulder may be broken into smaller pieces, reduced the quantity using reffler and keeping it in a bag with proper tag. c. The B Shift Sample shall be carried to sample processing lab on the same day by 9PM in the vehicle provided by NALCO.
Processing of One ROM sample , Collection & Processing of Field Samples(from Ripping Dozing & Backhoe shovel) adopting the following sequential steps on daily basis with two unskilled workers . a. Collection of Field samples from South Block as per requirement including OB and Bauxite Sample and bringing it to the sample processing lab(Departmental vehicle will be provided for sample collection) b. Drying up of the Field sample ( Industrial oven or Sundry). c. Grinding/Sieving/Reduction of the dried bauxite samples to –120 mesh size (three different stages ) as per instruction of the Engineer-in-charge. d. Preparation and packaging of the representative bauxite samples with one duplicate sample for future reference. e. Processed samples are to be handed over to the Alumina Plant Lab for analysis in the same day and to maintain a record of handing over the samples to Alumina plant laboratory. f)The developmental drilling samples will be processed as per the requirement following the same procedure as mentioned above.
Juganto Bagh
M/S SUSANT KUMAR BINOD
PREM PATRA TURUK
ANANTA BAGH
M/S BRAJABANDHU SAUNTA
RAMESH CHANDRA SAUNTA
MAA KANAKA DURGA CONSTRUCTION
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid